Problem no. 5:A grade of -1.6% grade intersects a grade of +2.7% at Station 12 + 252.10 of elevations 2021 meters. These two center grade lines are to be connected by a 111-meter symmetrical vertical parabolic curve. 31. Find the distance of the lowest point from PVC. 32. At what station will the cross-drainage pipes be situated? 33. Find the vertical distance between PC and PI. 34. Find the distance between PC and the lowest point. 35. If the overall outside dimensions of the reinforced concrete pipe to be installed is 100 cm, and the top of the culvert is 50 cm below the subgrade, what will be the obvert elevation at the center?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

answer correctly and give understandable solutions.

Problem no. 5: A grade of -1.6% grade intersects a grade of +2.7% at Station 12 + 252.10 of elevations 2021 meters.
These two center grade lines are to be connected by a 111-meter symmetrical vertical parabolic curve.
31. Find the distance of the lowest point from PVC.
32. At what station will the cross-drainage pipes be situated?
33. Find the vertical distance between PC and PI.
34. Find the distance between PC and the lowest point.
35. If the overall outside dimensions of the reinforced concrete pipe to be installed is 100 cm, and the top of the
culvert is 50 cm below the subgrade, what will be the obvert elevation at the center?
Transcribed Image Text:Problem no. 5: A grade of -1.6% grade intersects a grade of +2.7% at Station 12 + 252.10 of elevations 2021 meters. These two center grade lines are to be connected by a 111-meter symmetrical vertical parabolic curve. 31. Find the distance of the lowest point from PVC. 32. At what station will the cross-drainage pipes be situated? 33. Find the vertical distance between PC and PI. 34. Find the distance between PC and the lowest point. 35. If the overall outside dimensions of the reinforced concrete pipe to be installed is 100 cm, and the top of the culvert is 50 cm below the subgrade, what will be the obvert elevation at the center?
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Introduction to engineering design
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning