Project Budget for the using bottom-up budgeting.
1.
Personnel Costs:
Project Manager: $
100,000
Regulatory Officer: $70,000
Quality Assurance Manager: $80,000
Product Sales and Development Team: $300,000
Supply Chain Manager: $90,000
Packaging and Labeling Team: $80,000
Distribution and Logistics Manager: $90,000
Marketing: $100,000
Total Personnel Costs: $770,000
2.
Materials and Supplies:
Packaging machinery: $80,000
Packaging and Labeling Materials: $90,000
Temperature controlled Storage: $70,000
Total Materials and Supplies: $240,000
3.
Regulatory and Compliance Expenses:
Legal Consultations and Regulatory Fees: $70,000
4.
Quality Control and Assurance:
Quality Testing and Assurance: $100,000
5.
Market Research and Analysis:
Market Research Tools and Surveys: $60,000
6.
Distribution and Logistics:
Shipping and Logistics: $90,000
7.
Sales and Marketing:
Marketing and Promotion: $100,000
8.
Other Costs:
Contingency Reserve: $200,000 (for addressing unforeseen risks or issues)
Miscellaneous Expenses: $70,000 (e.g., office space, utilities, travel)
9.
Total Other Costs: $200,000
Total Project Budget (Bottom-Up): $1,950,000
Project Budget using top down budgeting
Total Budget- $2 million.
Personnel Costs: 40% of the total budget ($2,000,000 x 0.40 = $800,000)
Materials and Supplies: 10% of the total budget ($2,000,000 x 0.10 = $200,000)
Regulatory and Compliance Expenses: 3.5% of the total budget ($2,000,000 x 0.035 = $70,000)
Quality Control and Assurance: 5% of the total budget ($2,000,000 x 0.05 = $100,000)
Market Research and Analysis: 5% of the total budget ($2,000,000 x 0.05 = $100,000)
Distribution and Logistics: 7.5% of the total budget ($2,000,000 x 0.075 = $150,000)
Sales and Marketing: 10% of the total budget ($2,000,000 x 0.10 = $200,000)
Contingency Reserve: 9% of the total budget ($2,000,000 x 0.09 = $180,000)
Miscellaneous budget: 10% of the total budget ($2,000,000 x 0.10 = $200,000)
Total Budget- 2,000,000
Certainly! Below is a suggested allocation of the budget to the various teams and categories within your project. Please note that these are approximate figures and should be adjusted based on the specific needs and priorities of your project. The total budget allocated to personnel costs, materials and supplies, and other costs remains within the overall project budget of $1,800,000.
1.
Personnel Costs:
Project Manager: $150,000
Regulatory Officer: $90,000
Quality Assurance Manager: $120,000
Product Sales and Development Team: $400,000 (divided based on team members and roles)
Supply Chain Manager: $120,000
Packaging and Labeling Team: $150,000
Distribution and Logistics Manager: $130,000
Marketing: $140,000
Total Personnel Costs: $1,200,000
2.
Materials and Supplies:
Packaging machinery: $120,000
Packaging and Labeling Materials: $140,000
Temperature Controlled Storage: $100,000
Total Materials and Supplies: $360,000
3.
Legal Consultations and Regulatory Fees:
Legal Consultations and Regulatory Fees: $90,000
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Estimate the budget cost for each task in the following project WBS that has a
budget cost estimation of ($ 850,000) distributed in percentage (%) across all tasks.
Router systems project
Cost $600,000
Dofinition
Design
Implementation
10%
40%
50%
Customer testing
& review
Objectives
Requirements
In-house
6%
testing
40%
10%
inputs
Outputs
Files
Intertaces
Programming
3%
3%
4%
10%
20%
arrow_forward
Given the following information, determine the activity rate (rounded to the nearest cent)
for setups.
Activity
Total Activity-Base Usage
Budgeted Activity Cost
Setups
11,000
$58,100
Inspections
25,200
$147,200
Assembly (dlh)
72,000
$375,700
a. $5.22
O b. $5.28
c. $5.84
O d. $5.37
arrow_forward
Rafner Manufacturing has the following budgeted data for its two production departments.
Budgeted Data Assembly Finishing Overhead cost $ 1,200,000 $ 800,000 Direct labor hours 12,000 direct labor hours 20,000 direct labor hours Machine hours 4,000 machine hours 16,000 machine hours
What is the Assembly department overhead rate using direct labor hours? What is the Finishing department overhead rate using machine hours?
arrow_forward
Rafner Manufacturing identified the following budgeted data in its two production departments.
Assembly
$1,120,800
11,100 DLH
Finishing
$ 510,000
19,100 DLH
15,100 MH
Manufacturing overhead costs
Direct labor hours
Machine hours
5,100 MH
Required:
What is the company's Finishing department overhead rate using machine hours?
The departmental overhead rate for Finishing
arrow_forward
Rafner Manufacturing identified the following budgeted data in its two production departments.
Assembly
Finishing
Manufacturing overhead costs
$
1,120,800
$
510,000
Direct labor hours
11,100
DLH
19,100
DLH
Machine hours
5,100
MH
15,100
MH
Required:What is the company’s assembly department overhead rate using direct labor hours?
arrow_forward
Rafner Manufacturing identified the following budgeted data in its two production departments.
Assembly
$1,267,200
12,700 DLH
6,700 MH
Finishing
$ 670,000
20,700 DLH
16,700 MH
Manufacturing overhead costs
Direct labor hours
Machine hours
Required:
What is the company's assembly department overhead rate using direct labor hours?
The departmental overhead rate for Assembly
arrow_forward
The Document Creation Center (DCC) for Arlington Corp. provides photocopying and document services for three departments in the Minneapolis office. The following budget has been prepared for the year.
Available capacity
8,100,000
pages
Budgeted usage:
Software Development
1,700,000
pages
Training
3,100,000
pages
Management
2,500,000
pages
Cost equation
$285,000 + $0.02
per page
If DCC uses a dual-rate for allocating its costs based on usage, how much cost will be allocated to the Software Development Department?
Multiple Choice
$116,740.
$100,370.
$45,630.
$162,000.
arrow_forward
Given the following information, determine the activity rate for setups.
Activity
Total Activity-Base Usage
Budgeted Activity Cost
Setups
10,100
$56,200
Inspections
25,000
$141,400
Assembly (dlh)
79,600
$415,700
arrow_forward
Rafner Manufacturing has the following budgeted data for its two production departments.
Budgeted Data
Overhead cost
Direct labor hours
Machine hours
$ 1,200,000
Assembly
12,000 direct labor hours
4,000 machine hours
What is the Assembly department overhead rate using direct labor hours?
What is the Finishing department overhead rate using machine hours?
The departmental overhead rate for Assembly
The departmental overhead rate for Finishing
0
0
Finishing
20,000 direct labor hours
16,000 machine hours
$ 800,000
arrow_forward
Nanda Company has two service departments, Maintenance and Personnel. Maintenance
Department costs of P160,000 are allocated on the basis of budgeted maintenance-hours.
Personnel Department costs of P40,000 are allocated based on the number of employees. The
costs of operating departments A and B are P80,000 and P120,000, respectively. Data on
budgeted maintenance-hours and number of employees are as follows:
Support Departments
Production Departments
Maintenance
A
B
Department
Budgeted costs
P160,000
P40,000
P80,000 P120,000
Budgeted
ΝΑ
400
480
320
maintenance-hours
Number of employees
20
ΝΑ
80
240
Using the step-down method, what amount of Maintenance Department cost will be allocated
to Department A if the service department with the highest percentage of interdepartmental
support service is allocated first? (Round up)
Personnel
Department
arrow_forward
Practice : (see attachemnt)
please address parts B, C, D
please show any calculations for reference
a) What is meant by the term flexible budget? What role do flexible budgets play in evaluating performance?
The cost accountant for Bradley, Inc., prepared the following monthly performance report relating to the Finishing Department:
Budgeted Production Actual Production
number units: 6000 units 6500 units
Direct materials: $90,000 $99,600
Direct labor: $48,000 $55,200
Variable Manufacturing Overhead: $6,000 $9,000
Fixed Manufacturing Overhead: $66,000 $64,200
What would the flexible budget amounts be for each of the following:
Direct materials
Direct labor
Variable manufacturing overhead
Compute the…
arrow_forward
A partial responsibility accounting report for a cost center is below. The value of letter (c) would be:
Over (Under) Budget
Controllable Costs
Budgeted
Actual
Direct materials....
$52,800
$
a
Direct labor.......
24,000
26,000
Utilities
19,200
C
Totals...
$96,000
$96,600
A
$19,000
B
$19,400
C) $54,000
D) $2,000
E
None of the above
$(1,200)
b
(200)
$ 600
arrow_forward
s
arrow_forward
Rafner Manufacturing identified the following budgeted data in its two production departments.
Assembly
$1,297,500
Finishing
$ 700,000
Manufacturing overhead costs
Direct labor hours
Machine hours
13,000 DLH
7,000 MH
The departmental overhead rate for Assembly
Total actual manufacturing costs $1,297,500
The departmental overhead rate for Finishing
Required:
What are the company's departmental overhead rates if the assembly department assigns overhead based on
direct labor hours and the finishing department assigns overhead based on machine hours?
21,800 DLH
17,000 MH
0
per direct labor hour
arrow_forward
Direct and step methodsSalado Inc. provides cleaning services through its Residential and Commercial divisions. Support services of the company are provided by Personnel and Administration areas. Costs of these two areas are allocated to the revenue producing departments. Personnel costs are allocated using number of employees; administration costs are allocated using direct department costs. The following annual budgeted information (presented in a benefits-provided ranking) is available:
Personnel
Administration
Residential
Commercial
Direct costs
$140,000
$180,000
$480,000
$800,000
Number of employees
12
30
72
48
Direct labor hours
60,000
90,000
Square feet cleaned
450,000
570,000
a. Using the direct method, allocate the costs of Personnel and Administration to the Residential and Commercial divisions.
Total support costs allocated to Residential =
Total support costs allocated to Commercial =
b. Using the step method, allocate the costs…
arrow_forward
Rafner Manufacturing identified the following budgeted data in its two production departments.
Assembly
$1,267,200
12,700 DLH
6,700 MH
Finishing
$ 670,000
20,700 DLH
16,700 MH
Manufacturing overhead costs
Direct labor hours
Machine hours
Required:
1. What is the company's single plantwide overhead rate based on direct labor hours?
2. What is the company's single plantwide overhead rate based on machine hours?
arrow_forward
Budgeted data for the year considered of the following
Item
Personal
Purchasing
Machining
Painting
Overhead costs
$40,000
$35,000
$128,000
$48,000
# of employees
10
15
25
138
Machine Hour
0
0
23500
29
Direct labor costs
0
0
32,000
147,000
Purchase requisitions
6
0
2650
450
1. Allocate the two service departments' costs using the sequential allocation method and develop departmental overhead rates for each of the production departments using the most logical base for each department.
2. Calculate and give the journal entry to record the total amount of under- or overapplied over- head for the company, assuming the following actual results for the year:
Machining
Painting
Overhead costs
$173,000
78,540
Direct labour costs
$38,300
139,750
Machine hours
24,150
29
3. briefly discuss reasons for allocating service department costs.
arrow_forward
Name of Budgeted Cost
Budgeted Cost
Plant insurance
$
86,100
Testing raw materials
45,000
Manufacturing equipment setup
7,200
Quality inspections
57,000
Property taxes
23,000
Electricity, plant
14,000
Electricity, manufacturing equipment
51,250
Depreciation, plant
18,800
Depreciation, manufacturing equipment
36,700
Maintenance worker (manufacturing equipment)
22,500
Indirect labor (manufacturing equipment setup)
8,300
Design engineering
220,000
Required:1. Assign each of the budgeted costs above to one of the following activity cost pools:
Engineering
Equipment setup
Quality control
Factory facilities
Manufacturing equipment
2. Compute the total cost of each pool.3. Indicate whether the activities in each pool are unit, batch, product, or facility level.4. Identify the most likely driver for each cost pool from the following list:
Number of inspections/tests
Square feet
Machine hours
Engineering hours…
arrow_forward
Planning budget: Sales volume = 40,000. Actual results: Sales price = $10.00.
Consider the following budget information:
RU per
Cost per
Cost per
Cost per
Finished
Resource
Finished
Planning
Finished
Unit (FU)
Unit (RU)
Unit (FU)
Budget
Actual
Unit (FU)
Sales - Total $s
DM - Materials
Direct labor
Variable overhead
$360,000
$390,000
5.00
100,000
107,250
$0.25
$0.40
80,000
$1.90
4.00
68,250
Fixed expenses
100,000
Net income
25,400
Actual income EXCEEDS flexible budget income by:
$9,400
$12,300
$14,400
$20,200
arrow_forward
Allocating costs of support departments; step-down and direct methods. The Eastern Summit
Company has prepared department overhead budgets for budgeted-volume levels before allocations as
follows:
Support departments:
$45,000
7,800
36,120
20,670
18,300
Building and grounds
Personnel
General plant administration
Cafeteria: operating loss
Storeroom
$127,890
Operating departments:
Machining
Assembly
Total for support and operating departments
$36,000
60,000
96,000
$223,890
Management has decided that the most appropriate inventory costs are achieved by using individual-
department overhead rates. These rates are developed after support-department costs are allocated to
operating departments.
Bases for allocation are to be selected from the following:
Direct
Manufacturing Number of Floor Space Manufacturing Number of
Labor-Hours Employees Occupied
Square Feet of
Indirect
Labor-Hours Requisitions
Department
Building and grounds
Personnel"
2,500
12,000
4,500
6,000
22,000
General plant…
arrow_forward
The Document Creation Center (DCC) for Arlington Corp. provides photocopying and document services for three departments in the Minneapolis office. The following budget has been prepared for the year.
Available capacity
8,070,000
pages
Budgeted usage:
Software Development
1,670,000
pages
Training
3,377,000
pages
Management
2,163,000
pages
Cost equation
$350,000 + $0.03
per page
If DCC uses a dual-rate for allocating its costs, how much cost will be allocated to the Management Department, assuming the Management Department actually made 3,020,000 copies during the year?
Multiple Choice
$195,600.
$218,196.
$202,910.
$212,944.
arrow_forward
The Document Creation Center (DCC) for Arlington Corp. provides photocopying and document services for three departments in the Minneapolis office. The following budget has been prepared for the year.
Available capacity
9,400,000
pages
Budgeted usage:
Software Development
2,460,000
pages
Training
3,600,000
pages
Management
2,940,000
pages
Cost equation
$307,000 + $0.06
per page
If DCC uses a dual-rate for allocating its costs based on usage, how much cost will be allocated to the Management Department?
Multiple Choice
$247,887.
$276,687.
$256,878.
$130,829.
arrow_forward
Elevator Co. makes two product models, A and B, and provides both installation and inspection services for its customers. Budgeted information is as follows:
Installation
Inspection
Total
Budgeted overhead
300,000
210,000
510,000
Budgeted labor hours
2,000
3,000
5,000
Product A
Product B
Total
Direct labor hours per unit:
2.0
1.5
5,000
Installation
1.0
0.5
2,000
Inspection
1.0
1.0
3,000
Units
1,000
2,000
3,000
The company uses a departmental method to allocate overhead in each of the two cost pools - installation and inspection. How much overhead is allocated to product A if the company uses direct labor hours as the allocation base?
arrow_forward
Westmore Company has two service departments and two operating departments. Budgeted costs and other data relating to these departments are presented below:Building Operating Department& Grounds Personnel A BDepartmental costs ..... $54,000 $200,000 $650,000 $800,000Square feet occupied ... 1,000 3,000 12,000 15,000Number of employees .... 10 5 45 55Direct laborhours ..... 76,000 92,000The costs of Building & Grounds are allocated first on the basis of square feet of space occupied. Personnel costs are allocated on the basis of numberof employees. The departmental costs for the operating departments are overhead costs. Predetermined overhead rates in the operating departments are computed on the basis of direct laborhours.Assume that the company uses the direct method of allocating service department costs. The predetermined overhead rate that would be used in Department B would be closest to:a. $11.50/DLH.b. $12.00/DLH.c. $10.00/DLH.d. $10.22/DLH.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Cost Accounting
Accounting
ISBN:9781305087408
Author:Edward J. Vanderbeck, Maria R. Mitchell
Publisher:Cengage Learning
Related Questions
- Estimate the budget cost for each task in the following project WBS that has a budget cost estimation of ($ 850,000) distributed in percentage (%) across all tasks. Router systems project Cost $600,000 Dofinition Design Implementation 10% 40% 50% Customer testing & review Objectives Requirements In-house 6% testing 40% 10% inputs Outputs Files Intertaces Programming 3% 3% 4% 10% 20%arrow_forwardGiven the following information, determine the activity rate (rounded to the nearest cent) for setups. Activity Total Activity-Base Usage Budgeted Activity Cost Setups 11,000 $58,100 Inspections 25,200 $147,200 Assembly (dlh) 72,000 $375,700 a. $5.22 O b. $5.28 c. $5.84 O d. $5.37arrow_forwardRafner Manufacturing has the following budgeted data for its two production departments. Budgeted Data Assembly Finishing Overhead cost $ 1,200,000 $ 800,000 Direct labor hours 12,000 direct labor hours 20,000 direct labor hours Machine hours 4,000 machine hours 16,000 machine hours What is the Assembly department overhead rate using direct labor hours? What is the Finishing department overhead rate using machine hours?arrow_forward
- Rafner Manufacturing identified the following budgeted data in its two production departments. Assembly $1,120,800 11,100 DLH Finishing $ 510,000 19,100 DLH 15,100 MH Manufacturing overhead costs Direct labor hours Machine hours 5,100 MH Required: What is the company's Finishing department overhead rate using machine hours? The departmental overhead rate for Finishingarrow_forwardRafner Manufacturing identified the following budgeted data in its two production departments. Assembly Finishing Manufacturing overhead costs $ 1,120,800 $ 510,000 Direct labor hours 11,100 DLH 19,100 DLH Machine hours 5,100 MH 15,100 MH Required:What is the company’s assembly department overhead rate using direct labor hours?arrow_forwardRafner Manufacturing identified the following budgeted data in its two production departments. Assembly $1,267,200 12,700 DLH 6,700 MH Finishing $ 670,000 20,700 DLH 16,700 MH Manufacturing overhead costs Direct labor hours Machine hours Required: What is the company's assembly department overhead rate using direct labor hours? The departmental overhead rate for Assemblyarrow_forward
- The Document Creation Center (DCC) for Arlington Corp. provides photocopying and document services for three departments in the Minneapolis office. The following budget has been prepared for the year. Available capacity 8,100,000 pages Budgeted usage: Software Development 1,700,000 pages Training 3,100,000 pages Management 2,500,000 pages Cost equation $285,000 + $0.02 per page If DCC uses a dual-rate for allocating its costs based on usage, how much cost will be allocated to the Software Development Department? Multiple Choice $116,740. $100,370. $45,630. $162,000.arrow_forwardGiven the following information, determine the activity rate for setups. Activity Total Activity-Base Usage Budgeted Activity Cost Setups 10,100 $56,200 Inspections 25,000 $141,400 Assembly (dlh) 79,600 $415,700arrow_forwardRafner Manufacturing has the following budgeted data for its two production departments. Budgeted Data Overhead cost Direct labor hours Machine hours $ 1,200,000 Assembly 12,000 direct labor hours 4,000 machine hours What is the Assembly department overhead rate using direct labor hours? What is the Finishing department overhead rate using machine hours? The departmental overhead rate for Assembly The departmental overhead rate for Finishing 0 0 Finishing 20,000 direct labor hours 16,000 machine hours $ 800,000arrow_forward
- Nanda Company has two service departments, Maintenance and Personnel. Maintenance Department costs of P160,000 are allocated on the basis of budgeted maintenance-hours. Personnel Department costs of P40,000 are allocated based on the number of employees. The costs of operating departments A and B are P80,000 and P120,000, respectively. Data on budgeted maintenance-hours and number of employees are as follows: Support Departments Production Departments Maintenance A B Department Budgeted costs P160,000 P40,000 P80,000 P120,000 Budgeted ΝΑ 400 480 320 maintenance-hours Number of employees 20 ΝΑ 80 240 Using the step-down method, what amount of Maintenance Department cost will be allocated to Department A if the service department with the highest percentage of interdepartmental support service is allocated first? (Round up) Personnel Departmentarrow_forwardPractice : (see attachemnt) please address parts B, C, D please show any calculations for reference a) What is meant by the term flexible budget? What role do flexible budgets play in evaluating performance? The cost accountant for Bradley, Inc., prepared the following monthly performance report relating to the Finishing Department: Budgeted Production Actual Production number units: 6000 units 6500 units Direct materials: $90,000 $99,600 Direct labor: $48,000 $55,200 Variable Manufacturing Overhead: $6,000 $9,000 Fixed Manufacturing Overhead: $66,000 $64,200 What would the flexible budget amounts be for each of the following: Direct materials Direct labor Variable manufacturing overhead Compute the…arrow_forwardA partial responsibility accounting report for a cost center is below. The value of letter (c) would be: Over (Under) Budget Controllable Costs Budgeted Actual Direct materials.... $52,800 $ a Direct labor....... 24,000 26,000 Utilities 19,200 C Totals... $96,000 $96,600 A $19,000 B $19,400 C) $54,000 D) $2,000 E None of the above $(1,200) b (200) $ 600arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Cost AccountingAccountingISBN:9781305087408Author:Edward J. Vanderbeck, Maria R. MitchellPublisher:Cengage Learning
Principles of Cost Accounting
Accounting
ISBN:9781305087408
Author:Edward J. Vanderbeck, Maria R. Mitchell
Publisher:Cengage Learning