Week 10 (Assignment):
RFPQ – City of North bay (Community
Centre)
Purpose:
Your Objective for this assignment is as follows:
1.
Review / Study example RFPQ (City of North Bay RFPQ)
Provided
Instructions:
Answer the following Questions.
Total of 25 marks total
Due:
the Drop Box Folder on D2L
(Late submissions will receive a 25% reduction in grade)
Student Name: Divyesh Ratanpara (A00163343)
Question 01: (2 Marks)
What is the submission deadline for this RFPQ?
Ans - The RFPQ has a submission cutoff date of Monday, March 15, 2021 at 1:00 p.m.
What is the deadline for Questions to the Owner?
Ans - The questions-to-the-owner submission deadline is Monday, March 8, 2021
at 3:30 PM.
Question 02:
(2 Marks)
Who is the City of North Bay contact for Post Bid closing communication?
Ans - After the bid closing, you can get in touch with the City of North Bay by reaching out to Mary-
Ann.
What is
their contact information?
Ans - Kotylak, Purchasing Manager, at
purchasing@northbay.ca
Question 03: (1 Mark)
Explain the requirements of the GC in regards to acknowledgement of Addenda?
Ans - All updates or additional information (addenda) related to this Request for Proposal and
Quotation (RFPQ) provided by the City of North Bay during the bidding process will be shared with
the general contractors. It is mandatory for a general contractor (GC) to thoroughly review each
addendum and any associated documents before submitting their response through the bidding
system.
Question 04: (1 Mark)
Explain the terms required by the City of North Bay in regards to Conflict of Interest.
Ans -
In the context of this Request for Supplier Pre-Qualification (RSPQ), "Conflict of Interest" pertains to
any situation where: (a) the respondent gains an unfair advantage in the RSPQ process or participates
in activities, whether directly or indirectly, that could provide it with an unfair advantage. This
includes, but is not limited to: 1. Having access to or being in possession of sensitive City information
that was not disclosed to other respondents for their response preparation; or 2. Communicating with
anyone for the purpose of acquiring or retaining business.
Question 05: (1 Mark)
What is the construction budget for the Community and Recreation Centre?
Ans - The budget for constructing the Community and Recreation Centre is approximately
$35,000,000.00, excluding taxes.
Question 06: (1 Mark)
Provide 10 items defining the scope of work for the project?
Ans - The project's scope includes the delivery of items and their supply and installation,
encompassing various components such as:
1.
Gardening and tree planting.
2.
Accessible stalls and dressing rooms.
3.
A venue for gatherings and a social hub (lobby).
4.
Offices for admittance and the kitchen.
5.
On the upper level, there is a walkway and an observation platform.
6.
Work on the substructure/foundation.
7.
A facility for cooling ice rinks.
8.
Building AV, IT, and communication systems.
9.
Site and building signage.
10.
Commissioning and testing.
Question 7: (2 Marks)
Based on the tentative schedule:
What is the date for the start of construction?
What is the Substantial completion date for the project?
Ans - The project is expected to be completed mainly in the fall or early winter of 2022, with
construction scheduled to start in July 2021.
Question 8: (1 Mark)
What are the insurance requirements of the RFPQ?
Ans - The insurance requirements for the RFPQ are as follows:
1.
Proof of Coverage:
Chosen respondents must provide proof, in the form of a letter or
endorsement from the insurance provider, dated no more than four months ago, demonstrating
their ability to meet the minimum coverage requirements.
2.
CCDC Insurance Requirements 2020:
The CCDC Insurance Requirements, dated December 14,
2020, outline the minimum insurance standards that the Contractor must maintain for the
Project. There are specific modifications as follows:
a.
General Liability Insurance:
Utilize CCDC41 - Item 1 for general liability insurance. It should be a
single project/rap-up liability coverage, subject to specific limitations approved by the City of North
Bay.
b.
Coverage Limits:
Maintain a maximum aggregate amount and a minimum of ten million dollars
($10,000,000) for each occurrence.
c.
Coverage Extension:
Align coverage with BC Form 2100 and provide a twenty-four (24) month
extension starting when the work is substantially finished, in compliance with the terms of the
certificate of substantial performance of the work.
d.
Builders Risk Insurance Deductible:
Modify CODC41 - Item 5 to ensure that the deductible for the
Broad Form (Builders Risk) Insurance does not exceed Twenty-Five Thousand Dollars ($25,000).
Question 9: (1 Mark)
What are the requirements for Bonding?
Ans - The requirements for bonding are as follows:
1.
Submission Timeline:
Chosen respondents must, within 12 days of this Request for
Prequalification, provide a letter from their bonding company. This letter should detail their
complete bonding limit, current bonding commitments, continuous availability, and future
bonding capacity specifically for this project. The bonding should cover 100% performance and
100% labor and material for a project valued up to $40 million.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Answer remaining part of the question
arrow_forward
Please answer the rest of the questions
arrow_forward
Use the table below to develop an AON schedule following the format that we used in class that are in your
notes. Failure to use the scheduling method we went over in class will result in loss of points.
The question for this part is to verify that you have determined the project duration correctly. Submit your
answer to the question. If you get it correct you will receive a 10/10 for the quiz and you may move on to
answering the quiz questions for AON Quiz 2. If you get it wrong, it will tell you it was incorrect, go back
and reevaluate your schedule to determine any potential errors. If you still don't get it correct after the
second try and would like to get my input, send me an email or setup a meeting with me in my office and
we can discuss how to resolve it. Once you get it correct or once you have completed 3 attempts at
answering it correctly, move on to Quiz 2.
Task
A
C
D
E
F
G
H
I
Preceded
By:
A
B,C
с
D
F
G
E,F
Duration
(days)
3
12
4
6
2
9
7
4
8
arrow_forward
You will design and implement a study plan for one unit you are currently studying. Study Plan and Schedule 1. Pick a unit (maths is suggested) 2. Self-assess your performance so far 3. Write a plan and schedule of study from next week until the end of semester for this unit that includes (Excel/Word/Gantt/draw.io/etc): a) For what duration and when you will study (times, what days of the week, include breaks) b) Specific detail on what and how you are going to study (what methods and tools and on what sessions — i.e. flashcards) 4. Conduct at least 2 study/revision sessions by next tutorial 5. Study according to plan! 6. Reflect and Optimise (apply best practice to your other units)
arrow_forward
Q#4.: Enlist the objectives of Environmental Impact Assessment(EIA)
Subject: Environmental Engineering
Note: Please write the proper answer in word format
arrow_forward
Engineering Management ,i need solutions in 10 minutes please.
MCQ/For the construction project represented by the activity network as shown below. Find one of the critical paths CP from the choices below.
A-1-3-6-8-9
B-1-2-4-6-9
C-1-2-4-6-7-9
D-1-2-4-6-8-9
E-1-3-4-6-9
F-1-3-4-5-7-9
arrow_forward
Please make a PERT CPM use the activity and duration below. Also use the format stated.
PLEASE DON'T ANSWER IF YOU DON'T KNOW HOW. Thank you.
arrow_forward
What is the project completion time?
a. 14 days
b. 12 days
c. 15 days
d. 13 days
When will fund raising activity end?
a. April 19
b. April 16
c. April 15
d. April 18
When will fund raising activity start?
a. April 15
b. April 13
c. April 14
d. April 18
arrow_forward
topic: early childhood learning center
- design concept
arrow_forward
unit for the final answer please.
arrow_forward
Question: 1)
How to design sarda fall project? Explain step by step in own words.
Subject: Irregation Engineering
Note: Please write the answer in each part in word format
arrow_forward
Please Refer Below Screenshot and Answer question 10
arrow_forward
Internship Program Goals and Professional Plans of Civil Engineering Student (200-500 words)
arrow_forward
Assessment
Take it to your limit. Mastery is a must. Economy counts. As a carpenter,
VOu have to learn every detail of your endeavour. Re-check your learning.
Activity 5: Matching Type
Directions: Read each statement in column A and match it with the choices in
column B. Write the letter of your answer on the activity sheet.
Column A
Column B
10. an organic substance that supports a tree
11. the term used to describe wood once it's no
longer a part of a living tree.
12.a sawn timber or processed timber ready to
p. reusability
q. wood
r. lumber
s. detailed drawing
use
t. once
u. twice
v. hardwood
w. softwood
x. dressed timber
13. a complete sketch of a plan
14.“Measure twice and cut
15. also known as rough timber
16.from broad-leaved tree
y. sawn timber
z. dressing
17. plane and smooth timber
18. from needle-leaved tree
10.the simplest way of fixing two pieces of timber
together
11.other term for timber
aa.nails
bb. timber
cc. measurement
12. a method used in making plans.
13. the…
arrow_forward
Student Names:
Scheduling Construction Projects
Chapter 6
Fill in Graph
Color Critical Path Red
A
Activity ID
ES Duration EF
LS
TF
Act No.
LF
B
E
C
F
G
D
Activity #
Duration
ABCDEFC
5
5
10
25
15
5
G
10
arrow_forward
All values should not be rounded off until the final answer.
arrow_forward
The three basic stages of construction planning are:
(A) Preconstruction planning, post-construction planning, and legal review
(B) Pre-conceptual planning, preconstruction planning, and construction planning
(C) Pre-conceptual planning, conceptual planning, and post-conceptual planning
(D) Pre-construction planning, construction planning, and planning review
OD
O No answer text provided.
O No answer text provided.
O No answer text provided.
Question 2
arrow_forward
OSHA Subject ( give sample answer ) 5 lines
arrow_forward
Instruction:
On a separate short bond paper with 1-inch by 1-inch margin, copy and answer each
problem and box your final answer(s). All necessary solution must be included. Please
consider at least 3 decimal places for the accuracy of your answer. Everything must
be hand written and avoid too much erasures. The submission of this plate is one (1)
week after the week intended for the topic.
1. Determine the Degree of Freedom of the following Structure
9k
25 kN
15 kN/m
2k/ft
F.
- 3 m-
-15 ft-
-15 ft-
Fixed at points A and C with roller
support at point B
Pinned Connected at points A and D.
Roller support at point Band C
arrow_forward
You will present a 4 minute informative speech to the class. Informative speech topic should be based on your civil engineering as bridges design and construction major. Use a minimum of 2 sources.
arrow_forward
Answer no.3 question
arrow_forward
please give neat and clean answer im posting this third time only one tutor attempting the question.
i request u give neat answer
There is a rectangular field in San Diego Zoo for an Elephant with the area of 580 sqft. Three sides should be made with a $12.5 per foot wooden wall, while the fourth side should be made with a $18.5 per foot green plastic wall. Determine the field dimensions that will result in the lowest total cost
arrow_forward
Note:
1)There is no more extra data.
2) This is not writing assignment question.
If don't the Answer please leave it for someone
arrow_forward
Please give correct answer. The answers presented are incorrect.
Subject is construction engineering
arrow_forward
Note: - I've posted this question multiple times and I'm getting poor quality answers!. Also if you can't answer it don't!. Pass it onto someone who can pls!Please provide a neat, step-by-step solution written by hand (without any explanations!), ensuring that AI is not involved in the process. I need an expert-level answer and will evaluate and rate it based on the quality and precision of your solution. Be sure to verify everything for accuracy before submitting. Thank you!
Question: - refer to the image (it has everything you need)
Draw Bending Moment diagram after you analyse the structure using the force Method. Redundant: vertical reaction and moment at B.
arrow_forward
This Homework aims to combine theoretical knowledge with practical and innovative design of green buildingsystems.Home work: Designing a green building system focused on net zero energy.
Two components are required for this Homework:
A) comprehensive research and
B) A Design Proposal
B) Design Proposal:
1 overview: such as objectives, scope, and expected outcomes...2) Site and context analysis: Note your peers in the class have very limited ideas about your project locationand others, so using this section, your peers can understand better about your project and design.3) Design concept: e.g., description of the design concept, including how it addresses your goals andincorporates sustainable practices and technologies, etc. for a green building system.4) Your detailed design: You will decide the titles and sections for your detailed design. Including the greenbuilding rating system you used is preferred. The detailed design could include your strategies,…
arrow_forward
answer part iv) of the same question.
Asap. thank you
arrow_forward
When will you start printing the certificates and programme?
a. April 22, 2022
b. April 19, 2022
c. April 21, 2022
d. April 20, 2022
arrow_forward
I have to write internship report
Could you please write to me the introduction of the report.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Related Questions
- Answer remaining part of the questionarrow_forwardPlease answer the rest of the questionsarrow_forwardUse the table below to develop an AON schedule following the format that we used in class that are in your notes. Failure to use the scheduling method we went over in class will result in loss of points. The question for this part is to verify that you have determined the project duration correctly. Submit your answer to the question. If you get it correct you will receive a 10/10 for the quiz and you may move on to answering the quiz questions for AON Quiz 2. If you get it wrong, it will tell you it was incorrect, go back and reevaluate your schedule to determine any potential errors. If you still don't get it correct after the second try and would like to get my input, send me an email or setup a meeting with me in my office and we can discuss how to resolve it. Once you get it correct or once you have completed 3 attempts at answering it correctly, move on to Quiz 2. Task A C D E F G H I Preceded By: A B,C с D F G E,F Duration (days) 3 12 4 6 2 9 7 4 8arrow_forward
- You will design and implement a study plan for one unit you are currently studying. Study Plan and Schedule 1. Pick a unit (maths is suggested) 2. Self-assess your performance so far 3. Write a plan and schedule of study from next week until the end of semester for this unit that includes (Excel/Word/Gantt/draw.io/etc): a) For what duration and when you will study (times, what days of the week, include breaks) b) Specific detail on what and how you are going to study (what methods and tools and on what sessions — i.e. flashcards) 4. Conduct at least 2 study/revision sessions by next tutorial 5. Study according to plan! 6. Reflect and Optimise (apply best practice to your other units)arrow_forwardQ#4.: Enlist the objectives of Environmental Impact Assessment(EIA) Subject: Environmental Engineering Note: Please write the proper answer in word formatarrow_forwardEngineering Management ,i need solutions in 10 minutes please. MCQ/For the construction project represented by the activity network as shown below. Find one of the critical paths CP from the choices below. A-1-3-6-8-9 B-1-2-4-6-9 C-1-2-4-6-7-9 D-1-2-4-6-8-9 E-1-3-4-6-9 F-1-3-4-5-7-9arrow_forward
- Please make a PERT CPM use the activity and duration below. Also use the format stated. PLEASE DON'T ANSWER IF YOU DON'T KNOW HOW. Thank you.arrow_forwardWhat is the project completion time? a. 14 days b. 12 days c. 15 days d. 13 days When will fund raising activity end? a. April 19 b. April 16 c. April 15 d. April 18 When will fund raising activity start? a. April 15 b. April 13 c. April 14 d. April 18arrow_forwardtopic: early childhood learning center - design conceptarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning