Requirements Life Cycle - NOTES
.pdf
keyboard_arrow_up
School
Northeastern University *
*We aren’t endorsed by this school
Course
6610
Subject
Civil Engineering
Date
Dec 6, 2023
Type
Pages
4
Uploaded by JusticeTree11299
3/19/2022
1
FOUNDATIONS OF
PROJECT BUSINESS ANALYSIS
Wael (Lilo) Altali, MPA, CBAP, PMP, PMI-ACP
Requirements Life Cycle
2
•
Trace Requirements
•
Maintain Requirements
•
Prioritize Requirements
•
Assess Requirements Changes
•
Approve Requirements
Requirements Life Cycle
3
BABOK Page 76
1
2
3
3/19/2022
2
Trace Requirements
4
•
Requirements traceability provides a mechanism to relate
different types of requirement specifications documents through
design and testing
•
establish meaningful relationships" as well as to analyze change
requests and secure agreement on the proposed changes
Requiremen
t
Stakeholder
Other
Requiremen
t
Test Case
Business
Need
Maintain Requirements
5
•
Consistently represented
•
Reviewed and approved for maintenance using a standard
process
•
Easily accessible and understandable
Prioritize Requirements
6
•
Grouping
•
Ranking
•
Budgeting/Time Boxing
•
Negotiation
4
5
6
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Helping tags: Civil Engineering, Network Diagram, Construction Method, Project Management
Please help me answer the question, will upvote just pls show complete solutions.
What is the network diagram and critical path of the following:
arrow_forward
Scenario 1 – applies to the measurement task and the application of
measurement principles questions in CMA1
You are the consultant Quantity Surveyor (QS) working for a leading provider of sustainable design
and construction solutions and you have been assigned to work with an inexperienced client on a
large construction project. The traditionally procured project is currently at the Technical Design
Stage (RIBA 2020) and your manager has asked you to perform the following tasks.
The PDF drawings listed below are available on the VLE in Week 8: Assignment 1 preparation and
are included to develop measurement skills only.
• D10104 Ground floor plan 2024
• D10115 Section AA 2024.
Following traditional measurement conventions and using a Standard Method of Measurement
(SMM), take off quantities for selected superstructure items.
• External cavity wall: Do not Measure the Porch
o The external half brick outer skin
o Forming 100mm cavity and 50mm cavity insulation
o Block wall inner skin.
•…
arrow_forward
Quality Engineering question
A Production Engineer working in Company A wants to maintain a Standard Operation Procedure (SOP) for the mobile phone assembly line and also monitor status of production (traveler). Please advise him the necessary documentation to do it and help him regarding the type of information the document and records should contain.
Please answer in your own words. please don't use handwriting. Thank you
arrow_forward
Q2: Suppose a construction site is 35km away from the market area, Apply the knowledge of construction management which of the two theories I.e. “The just-in-time theory” or “The inventory buffer theory”, will you prefer for materials management and why?
Civil Engineering
Subject= Construction Management
Answer in word format
arrow_forward
Task
A. High Level Analysis
B. Selection of Hardware Platform
C. Installation and Commissioning of hardware
D. Detailed Analysis of core modules
E. Detailed Analysis of supporting Modules
Programming of core modules
F.
G. Programming of supporting Modules
H. Quality Assurance of core modules
1. Quality Assurance of supporting Modules
J. Core module training
K. Development and QA of accounting Report
L. Development and QA of Management reporting
M. Development of Management Information System
N. Detailed Training
Duration Times are in days
5 days work per week (Saturdays and Sundays are day-off)
Create a Gantt Chart starting November 28, 2022.
Duration Prerequisite
1
1
2
2
2
2
3
1
1
1
1
1
1
1
A
B
A
D
D
E
F
G
C, H
E
E
L
I, J, K, M
arrow_forward
Discuss the various types of quality standards used in IT and construction projects.
arrow_forward
Note: Don't copy from Google and other websites.
What is the main requirement for a BIM approach ?
arrow_forward
Briefly describe the CSI Specifications?
arrow_forward
In each construction project, there are different stakeholders involved, namely client, engineer and contractor. In short, state the role of each stakeholder in a civil engineering construction project. Can i also have reference
arrow_forward
The introduction section of a proposal includes:
Select one:
o a. Report organization
b. All points mentioned
c. Statement of the problem
d. The background
arrow_forward
By whom are computers used for project administration/
arrow_forward
from book Construction Contracts Keith Collier 3rd
q1) a. Explain the statement: Documents for construction contracts are not always the same as contract documents.
b. In the light of your explanation, list all the classes of documents for contracts, identifying the contract documents.
q2) Explain the proper purpose and procedure for a “letter of intent” issued by an owner, and who should draft or give advice concerning it.
please don't slove as handwriting
arrow_forward
write about the following terms:
a.recouece planning
b. cost estimation
c. cost budgeting
arrow_forward
(a)
Your construction company plans to be involved in a Design and Build (DB) project.
As a project manager of the company, you are responsible to give a briefing on the
design and build project stages to you. Explain the stages of the project for DB to your
project team members.
arrow_forward
what is quality assurance evaluation for skscraper, explain it briefly and include example
arrow_forward
The first step in the construction planning and scheduling process is identifying project activities.
O True
• False
arrow_forward
Provide an example of a product or system that uses international standard (such as bank card size , traffic lights colours) explain why it is important to use that standard
arrow_forward
please help asap. thank you
arrow_forward
What are the advantages of material requirement planning ?
arrow_forward
5. Give 5 components of a Project Management Information System.
6. Give 4 key types of estimates.
arrow_forward
I need the answer as soon as possible
arrow_forward
Develop a construction project scenario of your own and prepare a report of 1000 words describing every steps of construction project planning ?
arrow_forward
Describe the role of document flow in managing construction project information dissemination?
Please explain in detail
arrow_forward
What are National New Source Performance Standards (NSPSs) ?
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning
Related Questions
- Helping tags: Civil Engineering, Network Diagram, Construction Method, Project Management Please help me answer the question, will upvote just pls show complete solutions. What is the network diagram and critical path of the following:arrow_forwardScenario 1 – applies to the measurement task and the application of measurement principles questions in CMA1 You are the consultant Quantity Surveyor (QS) working for a leading provider of sustainable design and construction solutions and you have been assigned to work with an inexperienced client on a large construction project. The traditionally procured project is currently at the Technical Design Stage (RIBA 2020) and your manager has asked you to perform the following tasks. The PDF drawings listed below are available on the VLE in Week 8: Assignment 1 preparation and are included to develop measurement skills only. • D10104 Ground floor plan 2024 • D10115 Section AA 2024. Following traditional measurement conventions and using a Standard Method of Measurement (SMM), take off quantities for selected superstructure items. • External cavity wall: Do not Measure the Porch o The external half brick outer skin o Forming 100mm cavity and 50mm cavity insulation o Block wall inner skin. •…arrow_forwardQuality Engineering question A Production Engineer working in Company A wants to maintain a Standard Operation Procedure (SOP) for the mobile phone assembly line and also monitor status of production (traveler). Please advise him the necessary documentation to do it and help him regarding the type of information the document and records should contain. Please answer in your own words. please don't use handwriting. Thank youarrow_forward
- Q2: Suppose a construction site is 35km away from the market area, Apply the knowledge of construction management which of the two theories I.e. “The just-in-time theory” or “The inventory buffer theory”, will you prefer for materials management and why? Civil Engineering Subject= Construction Management Answer in word formatarrow_forwardTask A. High Level Analysis B. Selection of Hardware Platform C. Installation and Commissioning of hardware D. Detailed Analysis of core modules E. Detailed Analysis of supporting Modules Programming of core modules F. G. Programming of supporting Modules H. Quality Assurance of core modules 1. Quality Assurance of supporting Modules J. Core module training K. Development and QA of accounting Report L. Development and QA of Management reporting M. Development of Management Information System N. Detailed Training Duration Times are in days 5 days work per week (Saturdays and Sundays are day-off) Create a Gantt Chart starting November 28, 2022. Duration Prerequisite 1 1 2 2 2 2 3 1 1 1 1 1 1 1 A B A D D E F G C, H E E L I, J, K, Marrow_forwardDiscuss the various types of quality standards used in IT and construction projects.arrow_forward
- Note: Don't copy from Google and other websites. What is the main requirement for a BIM approach ?arrow_forwardBriefly describe the CSI Specifications?arrow_forwardIn each construction project, there are different stakeholders involved, namely client, engineer and contractor. In short, state the role of each stakeholder in a civil engineering construction project. Can i also have referencearrow_forward
- The introduction section of a proposal includes: Select one: o a. Report organization b. All points mentioned c. Statement of the problem d. The backgroundarrow_forwardBy whom are computers used for project administration/arrow_forwardfrom book Construction Contracts Keith Collier 3rd q1) a. Explain the statement: Documents for construction contracts are not always the same as contract documents. b. In the light of your explanation, list all the classes of documents for contracts, identifying the contract documents. q2) Explain the proper purpose and procedure for a “letter of intent” issued by an owner, and who should draft or give advice concerning it. please don't slove as handwritingarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning