Activation and Testing Module Test

.docx

School

Rio Salado Community College *

*We aren’t endorsed by this school

Course

4

Subject

Electrical Engineering

Date

Feb 20, 2024

Type

docx

Pages

3

Uploaded by SuperMusic12967

Report
Activation and Testing   module test Question 1 Correct Which of the following is NOT an active device verification test? Select one: a. Power-up test b. Structural return loss test  c. Frequency response test d. Return loss test Question 2 Correct True or False: Verification of the coaxial cable is done after construction since the cable is ready to install upon receipt from the manufacturer. Select one: True False  Question 3 Correct True or False: The frequency response test for passive devices checks the components ability to pass the desired frequencies without excessive attenuation in any portion of the frequency spectrum. Select one: True  False
Question 4 Correct Match each of the following active device verification tests to its purpose. Frequenc y response test Answer 1 Return loss test Answer 2 Power-up test Answer 3 Question 5 Correct Isolation between passive device ports should be greater than ___ dB. Select one: a. 18  b. 15 c. 27 d. 22 Question 6 Correct True or False: An attempt should be made to build a history of each amplifier for future; this can be a useful tool for troubleshooting or predicting potential future problems. Select one: True  False Question 7 Correct True or False: An initial rough balance is used to set the approximate level and tilt of the RF signals. Select one: True  checks the flatness of the device checks the impedance match of all the ports on the device checks the operation of the pow er supply and associated circuits prior to installation
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help