Jayden Podmorof
Project Manager
Chopra Environmental and Biotechnology Engineering (CEBEC)
1423 Wood St
Kelowna, BC, V1Z 2P3
February 6, 2020
Pat McTaggart
Manager
Nature World
51 Burch St
Kelowna, BC V4S 2B1
Dear Pat McTaggart,
RE: CEBEC Environmental Control System
Thank you for your phone call yesterday. I would like to take the time to address the concerns
you raised, update you on the status of the Environmental Control System, and discuss how we
can support you moving forward.
First let me say that Chopra Environmental and Biotechnology Engineering (CEBEC) is sad to
hear about the loss of the animals at Nature World. We understand how important these
animals were to you. This whole situation, starting with the initial break-and-enter and theft of
the parrots through to the loss of the remaining animals, is devastating and we want to assure
you that we at CEBEC are here to support you.
As you are aware, we have built a strong, positive working relationship with Nature World and
Animals4Ever. We completed construction of the sanctuary in January of 2019 and provided an
environmental control system (ECS) to maintain optimum conditions for the animals housed
inside. As per our current contract we are responsible for maintaining this system for a period of
three years (January 1, 2019 to Dec 31, 2021). We are one year into this maintenance contract
and our monthly records indicate that the system has been performing smoothly with no
incidents, issues or deficiencies reported by either the software or anyone at Nature World.
On January 16, 2020 we learned that Nature World had been broken into and numerous parrot
species had been stolen. Immediately upon becoming aware of the break-in we emailed you to
find out whether the ECS had been compromised during the break-in and ofered to send a
technician to your site to do a through check of the system. You replied to the email indicating
the system was fine and declined the ofer of having a technician come out to inspect it.
Unfortunately, it appears that the people responsible for the break-in did indeed compromise
the ECS. After our phone conversation yesterday, where I learned that impurities in the air and
water led to the death of the remaining animals in the sanctuary we sent Kelly Zhou, our chief
environmental engineer, to inspect the system. She ran a series of tests and discovered that a
‘slow-working, data-distorting’ virus used by the thieves to disable the security system also
infiltrated the ECS thus causing it to malfunction.
This unfortunate discovery came too late to save the animals however, as I mentioned earlier,
CEBEC is here to support you through this devastating set-back and we have prepared two
options for you to consider. Option one is to provide coverage through the Maintenance
Contract to remove the virus and repair the ECS. Nature World incurs no costs and the time to
complete is approximately two weeks. Option two involves replacing the ECS entirely. This will
cost Nature World $300,000.00 and will also take approximately two weeks.
I understand that you need an ECS that is reliable and fully functioning and it is my professional
opinion that Option One provides the best solution for you. The ECS has been operating without
incident since it was first implemented and only malfunctioned through outside tampering.
Once repaired, you will have two years remaining on the existing maintenance contract with an
option to extend coverage. Incurring the cost of a whole new system is, I believe, unnecessary
as the existing system has been working without incident for a year and has proven to be stable
and fully capable of maintaining the sanctuary’s internal environment.
Again, we are sad that you are having to deal with this tragedy and we hope that Nature World
can re-open for business swiftly.
Please do let me know how you would like to proceed. You can
reach me at 250-471-0090 or send an email to j.podmorof@cebec.com. Either option will take
approximately two weeks to complete and we are committed to helping you move forward with
the ECS that you choose.
Sincerely,
Jayden Podmorof
Project Manager
Chopra Environmental and Biotechnology Engineering Company (CEBEC)
CC: Dr. Jared Chopra, Founder and CEO, CEBEC
Memorandum
TO:
Dr. Natalie Forssman, School of Engineering, UBCO
FROM:
J. Podmorof, 2
nd
Year Engineering,
DATE:
February 13, 2020
SUBJECT:
Explanation of Rationale and Strategy Used to Write Adjustment Letter
The memorandum’s purpose is to explain the choices I made in writing my fictional adjustment
letter to Pat McTaggart. The goal of the letter was to respond to Pat’s concerns, present her with
two available options to move forward, and persuade her to choose the option mutually
beneficial to herself and CEBEC.
Tone and Language
Keeping discussion from class in mind, I used a tone for the letter that was professional and
informative without coming across as rude. Responding to Pat angrily would only further
escalate the situation, which would likely result in an outcome unfavourable for both parties.
Another guideline touched upon in class had to do with the avoidance of assigning blame to
either party for what transpired. Although tempting at times to apologize for the tragedy in an
attempt to show compassion, I made an efort to avoid apologetic terms when describing the
situation. To show empathy, I Instead opted to describe the situation as unfortunate and explain
that the CEBEC was saddened by the events and was there to support Nature World.
Use of Resources
While writing my letter, I referred to the EGBC code of ethics to ensure that my writing was
relatively realistic for actual professional engineering correspondence. To summarize, the code
of ethics made points to provide an honest professional opinion, to fully inform clients, and to
treat clients fairly and courteously. I remained conscious of these points while writing the letter
and tried to be as transparent as possible when outlining the situation and the two solutions,
along with giving my fictional professional opinion.
The Next Step
Upon my submission of the letter, I will await your feedback to learn how I could have further
improved on the assignment and become aware of whether or not some of the decisions I
made in the writing process were appropriate. I can be contacted by email at
jaydenpodmorof@gmail.com.
References
https://canvas.ubc.ca/courses/31700/files/folder/_Readings?preview=6897940
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Documents
Related Questions
what is the receptacle demand load for a 9600 square foot office building with 52 receptacles
arrow_forward
Any example traced in your reading material, connections between the current and the potential transformers and high voltage sections of the unit substation and the auto transformer and meter sockets and the cabinet are made with size_AWG wire.
A. 8 B.10 c.12 d.14
arrow_forward
On site plans, all evevations are referenced from_.
A. The centerline of a street B. Ground level C. A bench mark D. A test boring
arrow_forward
Estimate the length of conduit to perform the next bends. EMT will be bend using a hand
bender. Provide your answer in inches (just the number) using up to 2 decimals.
The picture shows two panels connected by a back-to-back
23.5" stubs
EMT 3/4"
6.25 ft
P
arrow_forward
4. Which of these can be installed without needing an electrical permit first?
A. Hot tubB. Bank of lights at a football stadiumC. Building security system
D. Basement furnace
arrow_forward
16.
The total voltage in a series-parallel circuit is __________
equal to the sum of the voltage drops across each resistor in the circuit.
distributed across each branch in the circuit.
determined by the product-over-sum method.
equal to the voltage drop of the parallel branch.
Which of the following statement is true both for a series and a parallel DC circuit?
powers are additive
voltages are additive
currents are additive
elements have individual currents
Electric power is the ________
same as electric pressure.
total number of electrons flowing in a circuit.
number of electrons passing a given point in one second.
rate of using or producing electric energy.
A battery produces a current of 0.6 A when the external resistance is 2 ? and 0.2 A when the external resistance is 12 ?. Find the emf of the battery
3 V
6 V
9 V
12 V
arrow_forward
d.1. What are the two concepts that make up grounding in its simplest form?A. Impedance and resistanceB. System grounding and equipment groundingC. DC systems and AC systemsD. Grounded and ungroundedd.2. Which of the following types of grounding electrodes was one of the first grounding electrodes to berequired for use?A. Ground ringB. Water pipeC. Concrete-encasedD. Rod and piped.3. What is the primary purpose of the National Electrical Code?A. To serve as a training manual for untrained personsB. To provide design specifications to professionalsC. To act as a collection of procedures for electriciansD. To safeguard against electrical hazards
arrow_forward
In the figure, the ideal batteries have emfs ℰ1 = 25.0 V and ℰ2 = 0.500ℰ1, and the resistances are each 2.14 Ω.
(a) What is the current in resistor 2? ______________A(b) What is the current in resistor 3? ______________A
(please show the units when working through the problem so that I can follow it easier)
arrow_forward
Please answer in typing format and don't be AI solution either i will dislike
arrow_forward
Include information about double kelvin bridge in terms of (diagram, construction, work principle, applications)
Note: Please do not handwritten but the diagrams should be drawn by hand only.
arrow_forward
Please answer this diligently. Other answers in the internet seems wrong. Please help me understand and solve this problem. I'll give a like. Thanks!
Ig2sc = __________; Isc = __________; MVAsc = __________
arrow_forward
Which of the following distribution systems would you select for a medical research campus?
A) Primary selective system.
C) Secondary loop system.
B) Distributed radial system.
D) Primary and secondary loop system.
Authoritative rules for electrical design and installation are contained in which of the following
7)
documents?
A) ASHRAE Handbook of Fundamentals.
B) NFPA 101.
C) NEC.
The illumination from a point source 4 ft. above a surface is 100 foot-candles, and the surface is
normal to the source. What will be the illumination level if the surface is tilted 45°?
A) 50 foot-candles.
B) 100 foot-candles.
C) 71 foot-candles.
Which of the following lamp types is generally the most energy efficient?
A) Incandescent.
C) High intensity discharge.
B) LED.
D) Fluorescent.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you

Power System Analysis and Design (MindTap Course ...
Electrical Engineering
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:Cengage Learning
Related Questions
- what is the receptacle demand load for a 9600 square foot office building with 52 receptaclesarrow_forwardAny example traced in your reading material, connections between the current and the potential transformers and high voltage sections of the unit substation and the auto transformer and meter sockets and the cabinet are made with size_AWG wire. A. 8 B.10 c.12 d.14arrow_forwardOn site plans, all evevations are referenced from_. A. The centerline of a street B. Ground level C. A bench mark D. A test boringarrow_forward
- Estimate the length of conduit to perform the next bends. EMT will be bend using a hand bender. Provide your answer in inches (just the number) using up to 2 decimals. The picture shows two panels connected by a back-to-back 23.5" stubs EMT 3/4" 6.25 ft Parrow_forward4. Which of these can be installed without needing an electrical permit first? A. Hot tubB. Bank of lights at a football stadiumC. Building security system D. Basement furnacearrow_forward16. The total voltage in a series-parallel circuit is __________ equal to the sum of the voltage drops across each resistor in the circuit. distributed across each branch in the circuit. determined by the product-over-sum method. equal to the voltage drop of the parallel branch. Which of the following statement is true both for a series and a parallel DC circuit? powers are additive voltages are additive currents are additive elements have individual currents Electric power is the ________ same as electric pressure. total number of electrons flowing in a circuit. number of electrons passing a given point in one second. rate of using or producing electric energy. A battery produces a current of 0.6 A when the external resistance is 2 ? and 0.2 A when the external resistance is 12 ?. Find the emf of the battery 3 V 6 V 9 V 12 Varrow_forward
- d.1. What are the two concepts that make up grounding in its simplest form?A. Impedance and resistanceB. System grounding and equipment groundingC. DC systems and AC systemsD. Grounded and ungroundedd.2. Which of the following types of grounding electrodes was one of the first grounding electrodes to berequired for use?A. Ground ringB. Water pipeC. Concrete-encasedD. Rod and piped.3. What is the primary purpose of the National Electrical Code?A. To serve as a training manual for untrained personsB. To provide design specifications to professionalsC. To act as a collection of procedures for electriciansD. To safeguard against electrical hazardsarrow_forwardIn the figure, the ideal batteries have emfs ℰ1 = 25.0 V and ℰ2 = 0.500ℰ1, and the resistances are each 2.14 Ω. (a) What is the current in resistor 2? ______________A(b) What is the current in resistor 3? ______________A (please show the units when working through the problem so that I can follow it easier)arrow_forwardPlease answer in typing format and don't be AI solution either i will dislikearrow_forward
- Include information about double kelvin bridge in terms of (diagram, construction, work principle, applications) Note: Please do not handwritten but the diagrams should be drawn by hand only.arrow_forwardPlease answer this diligently. Other answers in the internet seems wrong. Please help me understand and solve this problem. I'll give a like. Thanks! Ig2sc = __________; Isc = __________; MVAsc = __________arrow_forwardWhich of the following distribution systems would you select for a medical research campus? A) Primary selective system. C) Secondary loop system. B) Distributed radial system. D) Primary and secondary loop system. Authoritative rules for electrical design and installation are contained in which of the following 7) documents? A) ASHRAE Handbook of Fundamentals. B) NFPA 101. C) NEC. The illumination from a point source 4 ft. above a surface is 100 foot-candles, and the surface is normal to the source. What will be the illumination level if the surface is tilted 45°? A) 50 foot-candles. B) 100 foot-candles. C) 71 foot-candles. Which of the following lamp types is generally the most energy efficient? A) Incandescent. C) High intensity discharge. B) LED. D) Fluorescent.arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Power System Analysis and Design (MindTap Course ...Electrical EngineeringISBN:9781305632134Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. SarmaPublisher:Cengage Learning

Power System Analysis and Design (MindTap Course ...
Electrical Engineering
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:Cengage Learning