Knowledge Assessment
Matching (10 points)
Match the term in column 1 to its description in column 2.
Multiple Choice (10 Points)
Select the best response for the following statements.
1.
Which of the following is not an example of a work resource?
1.
Yan Li
2.
keyboard
3.
SD card
4.
electrician
2.
It is helpful to assign a base calendar to a group of resources when they all .
1.
have the same pay rate
2.
work the night
shift 3.
have the same Max. Units
4. do the same job function?
Column 1
Column 2
1. resource calendar a. the maximum capacity of a resource to accomplish tasks
2. Max. Units b. specifies default working and nonworking times for a resource, a project, or a task
3. material resource c. when and how much of a resource's time can be assigned to work
on tasks
4. project
calendar d. the people and equipment that do work to accomplish the tasks of the project
5. cost resource e. the people, equipment, money, and materials used to complete the tasks in a project
6. work resource f. a way of documenting information about resources, tasks, and assignments
7. base calendar g. consumable items used up as the tasks in a project are accomplished
8. availability h. a resource that doesn't depend on the amount of work on a task or the duration of a task
9. resources i. the base calendar that provides default working times for an entire
project
10. note j. defines the working and nonworking time for an individual resource
J
A
G
I
H
D
B
C
E
F
4.
A resource calendar does not apply to which of the following?
1.
material resources 2.
people resources
3.
equipment resources
4.
work resources
5.
In which of the following views can you view information for the individual people who will perform the tasks on the project?
1.
Calendar view
2.
Gantt Chart view
3.
Network Diagram view
4.
Resource
Sheet view
5.
You can provide additional information about how a resource is scheduled by doing which of the following?
1.
changing the Max. Units
2.
establishing a project calendar
3.
adding
a resource
note
4.
setting constraints
6.
For which resource is the standard rate listed per tracking unit of consumption?
1.
material
2.
equipment
3.
people
4.
all of the above
7.
If you have four electricians whom can each work part
‐
time (4 hours rather than 8), which of the
following values should you assign to Max. Units for the resource
“electrician”?
1. 50%
2. 25%
3. 100%
4
. 200%
8.
If you assign a base calendar to a resource, which of the following is true?
1.
The base calendar dictates the resource's vacation days.
2.
The base calendar gives all the available time to work on the project.
3.
The
base
calendar
gives
the
basic
days/hours
for
the
resource,
but
the
resource's
calendar can
have exceptions to
those
days/hours.
4.
The resource calendar contains all nonworking days for the entire project.
9.
To add vacation days to the calendar for an individual work resource, which dialog box would you use?
1.
Resource Information
2.
Resource Notes
3.
Change Working
Time
4.
none of the above
10. Which of the following is a reason why it is often difficult to get cost information for people resources?
1.
The
information is
often
confidential.
2.
The information is too complex to calculate.
3.
The information changes too frequently.
4.
The costs are large in comparison with other resource costs.