Practice probem 2 Answer (1)
.docx
keyboard_arrow_up
School
SUNY Buffalo State College *
*We aren’t endorsed by this school
Course
509LEC
Subject
Industrial Engineering
Date
Dec 6, 2023
Type
docx
Pages
6
Uploaded by ProfGorilla13929
1. Match the Six Sigma players to their corresponding roles (justify your choices):
Roles and Responsibilities
Six Sigma Players
Works full-time on SS projects
Black Belt
Expert in statistics. Helps teams and resolves
conflicts
Master Black Belt
Responsible for implementing solutions
Process Owner
Responsible for ensuring project completion
and delivery of results
Project Champion
Works part-time on SS projects.
Green Belt
2. (20 pts) Think about three specific examples of the seven wastes of Lean that could be addressed with
a Six Sigma project. This could be at your workplace or a generic process you are familiar with. Then, try
to operationalize the "what is wrong."
Identify the process and where it occurs. What would be the
primary metric associated with this project?
Be concise. Use the table below as a reference.
Waste
Example
Describe what is
wrong
Process
Primary Metric
Transportation
Waste
The train has inefficient
headways and routing
Increased
power
consumption,
Bad review from
customer,
increased cost
Evaluating
transportation
planning and
route selection
using historical
data to optimize
future routes
Input
Inventory
Waste
Often request 25%
inventory based on
conventional policy. For
the new project it keeps
the same %.
Increased cost,
can not update
with new parts,
unorganized
stock room,
Helps Create an
inventory control
process and
configuration
management
process
Output
Motion Waste
Maintenance team takes
longer time to get the
tools, spare parts, and
information in their hand.
Long time to
troubleshot,
compromised
quality of repair,
provide
information on
how process
structure and
work
environment
optimization
might minimize
motion waste.
Input
3. (10 pts) What is a SIPOC diagram (map)? How is it used in the Define phase?
SIPOC Diagram is a high-level process map and a tool that summarizes the Input and output of one or
more processes in table or diagram form commonly used in the defined phase of the six sigma DMAIC.
It’s an acronym that stands for S= Supplier I= Input P=Process O=output C=Customer. The SIPOC diagram
helps the company in determining how a process operates. It identifies the project's owner and server
and makes an estimation of how well an input is utilized in the process. It also determines if the output is
satisfactory and eliminate or create or change a process accordingly. This tool came out in 1980’s in use
as part of the total quality movement. And today it is vastly used in six sigma, lean manufacturing, and
BPM (Business Process Management)
Using SIPOC in the Define step resembles the following:
For example, In New York City Transit a systemwide cable replacement project is 2 years behind. We
need to identify the process that we want to improve at the beginning of the project. Then identify the
suppliers, Inputs outputs and the end users or the customers.
In the very first steps we list down all the
elements SIPOC diagram. For an Example:
Supplier
Input
Process
Output
Customer
1. Cable company-EIS
Wire and Cable
2.Tray Manufacturer-
Selco
3. Installer and
Contractor- Comstock
1.
Scope of
Work
2.
Contractor
Proposal
3.
Proposed
Schedule
4.
Budget
5.
Survey
and
Drawings
6.
Cable
Spec
7.
Tray Spec
1.
Review
Contractor
Proposal
2.
Review
Drawings
3.
Inspect
Cables and
Trays
4.
Inhouse
Coordinator
5.
Witness
testing
6.
Sign the
deployment
.
7.
Accept
Deliverables
1.
Cables
2.
Trays
3.
Installation
of New
Cable
4.
Installation
of Cable
Tray
1. New York City
Transit
2. Department of
Transportation
4. Develop a SIPOC of ordering groceries online and having them delivered to your customer's home.
Supplier
Input
Process
Output
Customer
1.
Wholesal
e supplier
2.
Grocery
with
online
platform
3.
Delivery
service
provider
1.
inventory
2. Stock
Availability
3.Customer
customer
grocery
order
4. payment
information
5.delivery
address
6. Delivery
time
1.
Customer selects
item.
2.
Order goes to the
cart.
3.
Customer reviews and
confirms.
4.
Online platforms
process the order and
send this to grocery
and delivery service.
5.
Grocery packs that
order.
6.
Delivery service sends
his driver.
7.
Driver delivery the
order to the customer
1.
Order
confirmation
2.
Receipt
3.
Delivered
groceries.
4.
Confirm
delivery.
5.
Tips
1. Customer
placed the
order
5. Megasigma Corp. has a process they believe is operating near the Six Sigma level and wants to verify
this. If the specification for a critical part in the process is 2.75 cm +/- 0.05, and the standard deviation is
0.02, at what sigma level is the process operating?
USL= 2.75+.05= 2.80
LSL= 2.75-.05= 2.70
Standard Deviation σ= 0.02
Σ Sigma Level = (USL-LSL)/2σ= (2.80-2.70)/ (2*.02) =2.5
The process is operating at 2.5 sigma level.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help