Lloyd-Jones_S

.docx

School

TAFE NSW - Sydney Institute *

*We aren’t endorsed by this school

Course

4007A

Subject

Information Systems

Date

Dec 6, 2023

Type

docx

Pages

8

Uploaded by Lilboo88

Report
CPCCBC4007A - UNGRADED: Assessment 2 Answer sheet STUDENT DETAILS Student Name: TAFE ID: UNIT AND ASSESSMENT DETAILS Unit Number: CPCCBC4007A Assessment No: 2 LA Number: LA023683 DECLARATION I hold a copy of this assessment. I have completed all parts of the assessment. I hereby certify that no part of this assessment or product has been copied from any other student’s work or from any other source except where due acknowledgement is made in the assessment. Student’s signature: _________________________________________ (Electronic Signature is accepted) 1 | P a g e X X X
Contents Question 1 ............................................................................................................................................. 3 Question 1a) ...................................................................................................................................... 3 Question 1b) ...................................................................................................................................... 4 Question 2 ............................................................................................................................................. 5 Question 3 ............................................................................................................................................. 7 Bibliography .......................................................................................................................................... 8 Websites ............................................................................................................................................ 8 2 | P a g e
Question 1 Question 1a) For the construction of the 2-storey dwelling, outline the approval process and the certificates required from application for approval of construction to occupation of the building. Briefly explain the different types of building approval that apply in your state (eg in NSW; exempt, complying, integrated, local). Clearly nominate which type of approval this development would fall under in your state. The approval process and certificates required from application for approval of construction to occupation for Project 1 in NSW can be completed in two different ways, Development Application or Complying Development Certificate. Option 1 – Development Application (DA) The builder/ proprietor could choose to submit a Development Application (DA) through the local council, in the case of Project 1 it would be through Penrith City Council. The DA illustrates to the local council the intentions of the proposed dwelling. Once submitted, council then assesses the lodged documents against the Local Environmental Plan (LEP) and other relevant state planning policies to see if the application complies. Option 2 – Complying Development Certificate (CDC). The builder/proprietor engage a private accredited certifier and obtain a CDC. This is an alternative to the DA, however it is only available for work that is classed as complying development under council’s planning controls or State planning policy. The proposed development must comply with the relevant planning controls and building controls under the BCA. Once that has been decided, a Principal Certifying Authority (PCA) is appointed by the proprietor as the builder cannot appoint one. The PCA can be either an accredited certifier, local council, or the consent authority. Work cannot commence before a PCA is appointed. Once the DA/CDC has been approved, a Construction Certificate (CC) is issued. This certificate can be issued through the local council or a private accredited certifier and confirms that the building plans comply with the Building Code of Australia (BCA) and is consistent with the approved DA/CDC. The builder will also need to lodge a notice of commencement prior to any works commencing. Throughout the course of the build, the builder will make arrangements with the PCA for inspections to be carried out as certificates for completed work may not be issued if inspections are not carried out. Occupation certificate is the last step. Before the building can be occupied. Exempt development Some minor building renovations or works don’t need any planning or building approval. This is called exempt development. Exempt development is very low impact development. A few examples of development that can be exempt development are: advertising and signage, balconies and decks, garden sheds, carports, fences, repairing a window or painting a house. As long as the proposed works meet all of the development standards approval may not be needed. Complying development 3 | P a g e
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help