Breakwater case

.pdf

School

Camosun College *

*We aren’t endorsed by this school

Course

315

Subject

Mechanical Engineering

Date

Oct 30, 2023

Type

pdf

Pages

8

Uploaded by SuperHumanIce12900

Report
BREAKWATER DENSTAR A Commercial opportunity Abstract: We are a SME located in Lezo, Guipúzcoa, Spain dedicated to the manufacture and commercialization of metallic industrial fixtures and manufacturer of high precision components. From the beginning, our Company has believed in creating strong partnerships with our customers. This commitment to our customers is demonstrated by making available local application engineers, knowledgeable direct sales, and partnering with world class distributors and local representatives who know our products and its quality inside out. Our commitment to our customers compels us to protect the supply chain, drive cost efficiency, and hold quality to the highest standard. Quality in our people, quality in our services, and quality in our products, continues to be our primary component. It has been quite some months since we started our commercial conversations with Breakwater Denstar. Looks a good potential customer and fits perfectly within our strategy: - Several manufacturing plants in America and Asia - Big enough to fit within our production capability - Good financial records Two months ago we received the RFI document. That was a milestone. And now we have, finally, the formal RFQ (Request For Quotation) and rest of tender document. It is not a big business but definitely is the kick off. The buyer wants our best commercial offer, Incoterms 2010 in the following terms: - EXW - FCA - CIP - DAP - DDP The short resumed specs of the RFQ are as follows:
Buyer: Breakwater Denstar Capital 7247 Av Des Erables Montreal, Quebec H2J2M1 Purchasing needs - Ball bearings AK550HS: 59.616* Units - Ball bearings AK650HH 39.744* Units (* Internal reference) Transport: Ocean freight containers only Payment: Irrevocable and confirmed L/C, deferred payment 180 days after shipment date. Rest of L/C details available once document issued. Technical specifications 1. Radial clearance The internal clearance should be as per DIN 620/T4 with the lubricant film must providing a complete separation of the bearing elements. The axial clearance should be between 8,5 to10 times the radial clearance. 2. Materials Rings: Vacuum degassed chrome steel 100Cr6, which is heat stabilized for temperatures up to 150° C (302° F). Balls: Vacuum degassed chrome steel 100Cr6 with ceramic balls. 3. Precision The tolerances for dimensional, form and running accuracy should well fit within ISO 492 and DIN 620. Should be manufactured to precision class 4 and class 2 (P4 and P2) as well as ABEC 7 and ABEC 9.
Additionally the internal tolerance should be higher than class HG, recommendable UP (ultra precision). The bearings should be compliance with the American AFBMA standards as follows: ISO DIN AFBMA Class 4 P4 ABEC7 Class 2 P2 ABEC9 4. Preload Single bearings Deep groove bearings at higher speed have to be preloaded in axial direction. For single bearings adjusting springs are to be used. Matched deep groove bearings In many cases, our bearing applications demand higher axial or radial capacity and smaller bearing dimensions or higher rigidity or a certain range of axial play. Such requirements should be met by matched bearings. Only bearings from the same series and same dimension can be matched. Universal matching Single bearings should be capable to be assembled to DF, DB or DT configuration. Bearings with the same kind of matching (e.g. universal matching with same axial play, without axial play or with same preload) should be capable to be interchanged within their respective group. When mounting universal matched bearings in the DT arrangement, with or without axial play or with preload the axial load should be equally distributed.
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help

Browse Popular Homework Q&A

Q: Let P(Z) = 0.40, P(Y) = 0.43, and P(ZnY) = 0.19. Use a Venn diagram to find (a) P(Z'NY'), (b) P…
Q: Given the information, prepare a sales budget in dollars, a raw materials inventory purchase budget…
Q: What is the IUPAC name for this compound? CH3 CH=CH2
Q: Prevacid is used to treat gastroesophageal reflux disease (GERD). The chemical formula of Prevacid…
Q: What is the IUPAC name for this compound? H3C H3C =CHCH₂
Q: Assume that company makes only two products: Product A and Product B. The company’s activity-based…
Q: QUESTION 28 When Roleesha walks past the chemistry building, she remembers that she has a lab report…
Q: PLEASE ANSWER THIS WITH 5 paragraphs. Write it as if you're a memo.  Concepts of Relevant cost.
Q: In a horse race, how many different finishes among the first 3 places are possible if 7 horses are…
Q: In the year 2000, the population of a small city was 40,000. The population grows at a rate of…
Q: Use Green's Theorem to evaluate the line integral (3x² - 4xy) dx + (y³-x2) dy where C is the…
Q: (a) Find a vector parametric equation for the parabola y = x² from the origin to the point (2, 4)…
Q: iscuss how non parmacological labour pain nursing interventions aligns with one of the six QSEN…
Q: www Rp R3 O Vout Calculate vout if The value of the output voltage Vout is in = 10 mA, Rp = 2.2 k0,…
Q: 1. Find the equivalent resistance between points A and B for the resistors shown in the figure. A+…
Q: The given contingency table lists the cross tabulation of whether adults, for whom answering the…
Q: Patty has just completed her second semester in college. She earned a grade of A in her 5-hour…
Q: While at the airport, you lift your suitcase straight upward with a force of 100 N, and it…
Q: y 2x² + 6x Simplify 2x MIN NP 2 + 6x (x+8) by factoring out x + 6x (x + 8) = 7|N TEHI (Type your…
Q: Use index substitution to rewrite the following summation such that the index starts at 0. Then use…
Q: If V = 7 V, obtain a numerical value for the mesh current is in the circuit and calculate the power…
Q: 2. Preparing estimate for job, a carpenter assumes about factor. If the finished project. 1230…