An Environmental Study

2299 Words10 Pages
You are a general contractor wishing to put up a modest sized cement production plant on the outskirts of town. The plant would operate on only one 10-hour shift per day and would produce about 400 cubic yards of output per day for six days per week. It is necessary for an environmental impact study to be undertaken before the county can issue a permit. The biggest issue is, of course, the air quality implications of cement production, but potential impacts on water quality are of concern as well. It is now October, and you want to start building the plant by the end of next summer, if at all possible. It is now time to issue an RFP to procure an environmental impact analysis. Studies of this type normally require about three months of…show more content…
No spectator seating would be required. The decision to go with one general contractor has already been made.

An Environmental Impact Study
You are a general contractor wishing to put up a modest sized cement production plant on the outskirts of town. The plant would operate on only one 10-hour shift per day and would produce about 400 cubic yards of output per day for six days per week. It is necessary for an environmental impact study to be undertaken before the county can issue a permit. The biggest issue is, of course, the air quality implications of cement production, but potential impacts on water quality are of concern as well. It is now October, and you want to start building the plant by the end of next summer, if at all possible. It is now time to issue an RFP to procure an environmental impact analysis. Studies of this type normally require about three months of concerted effort by a team of analysts.

An Inventory Control System
You sell seeds from a catalog, and business has been blossoming. However, your inventory tracking system is inadequate. In high season, supply outages have been frequent, and customer complaints over delays have been increasing. You fear that your business will die on the vine unless something is done to improve things. You want to hire a management consultant to design a new inventory tracking system. This kind of work normally
Open Document