Case Study : Generic, Surveying, And Engineering Factors Investigation

2136 Words9 Pages
Case study on Generic, Surveying, and Engineering Factors Investigation of Tanahu, Khairanitar. Source: National Population and Housing Census, 2011 Mubarak Alenezi, Bachelors in Engineering (honors) major mechanic of the University of Southern Queensland Toowoomba, Queensland 4350, Australia August 2014. TABLE OF CONTENTS Part B1 - Investigation of Generic Factors ………………………………….. 3 Part B2 - Investigation of Surveying Factors………………………………… 4 Part B3 - Investigation of Civil & Structural Engineering Factors….. 6 Part B4 - Investigation of Electrical Engineering Factors………………. 8 Part B5 - Investigation of Mechanical Engineering Factors…………….9 References …………………………………………………………………………………10 LIST OF FIGURES Figure 1: table of percentage of drinking water in Tanahu…………………………………...4 Figure 2: map of precipitation in 2008 in Khairenitar station of Tanahun……………..4 Figure 3: map of precipitation in 2008 in Khairenitar station of Tanahun……………..4 Figure 4: Dimensions and choice of the appropriate size of both gutter and outer drain for the right roof size ……………………………………………………………………………..…..6 Figure 5: Schema of the structure of a gutter …………………………………………………..…..6 Figure 6: Material requirement for the construction of a rainwater jar:………………..7 Figure 7: Drawing shows the dimensions of iron molds for the jar body and rim molds for the jar mouth, for 2000 little capacity……………………………………………….…..7 Figure 8: scheme of a RWH ………………………………………………………………….………………8 Part B
Get Access