IS3230 Access Security Final Project Essay

995 Words Oct 25th, 2014 4 Pages
Project schedule summary
The project will be a multi-year phased approach to have all sites (except JV and SA) on the same hardware and software platforms.
Project deliverables
• Solutions to the issues that the specifies location of IDI is facing
• Plans to implement corporate-wide information access methods to ensure confidentiality, integrity, and availability
• Assessment of strengths and weaknesses in current IDI systems
• Address remote user and Web site user’s secure access requirements
• Proposed budget for the project—Hardware only
• Prepare detailed network and configuration diagrams outlining the proposed change
• Prepare a 5 to 10 minute PowerPoint assisted presentation on important access control infrastructure, and
…show more content…
• 10th Objective
Initialization of the entire network and any last minute configuration adjustments to have the network up and operating within all specified ranges.
Risks and Vulnerabilities
2.1Overall:
There is a mess of servers, switches, switches, and inward equipment firewalls. Each of the association's areas is working with diverse data advances and foundation IT frameworks, provisions, and databases. Different levels of IT security and access administration have been actualized and inserted inside their individual areas. The data engineering framework is maturing and numerous areas are running on antiquated fittings and programming. Additionally, the framework is woefully out-of-dated regarding fixes and overhauls which significantly expand the danger to the arrange as far as classifiedness, trustworthiness, and accessibility.
Billings, Montana:
 Logisuite 4.2.2 has not been upgraded in almost 10 years. Also, over 350 modifications have been made to the core engine and the license agreement has expired. Progressive upgrading to the current version will be required. As a result, renewing this product will be extremely cost and time-prohibitive.
 RouteSim is a destination delivery program used to simulate routes, costs, and profits. It is not integrated into Logisuite or Oracle financials to take advantage of the databases for real-ime currency valuaion and profit or loss projections.
 IDI’s office automation hardware