1. Mellitah A-100 currently unable to pig the 34" gas line due to malfunction on the pig launcher MOV's. 2. Operation deputy manager recommended that Mellitah delays should not be affecting the operation at 103A&103D. 3. 40" gas line to 103D primary pig should be sent as soon as the enough gas rate is secured. 4. The 103D gas plant should minimize the gas flaring on site by put on line one of the injection trains. 5. The operation target at both fields should be based on: a.i. Run the facilities in safe conditions. a.ii. Minimize the flaring gas rate. The above objectives are evaluated and considered by 103 management.