preview

Nt1310 Unit 6 Assignment 2

Satisfactory Essays

Assignment 3.1 For this assignment you will need to complete the following: Chapter 13: Questions 1 and 2 (pg. 179) Chapter 14: Questions 1, 2, 3, and 4 (pgs. 187-188) Chapter 15: Questions 1, 2, 3, 4 and 5 (pgs. 196-197) Chapter 13: Plumbing Question 1: Determine the water line components needed to complete the water supply for the bathroom shown in figure below. 11 feet of 0.5" for cold and 3.5 for hot pipe line 4 of ½ by 6” (fitting lavamanos) 4 of ¾ * ½ * ½ (tee) 11 feet of 0.5" for cold and 3.5 for cold pipe line 4 of ½ by 6” (fitting lavamanos) 4 of ¾ * ½ * ½ (tee) Question 2: determine the DWI components needed to complete the DWV system for the bathroom shown in figures below. The horizontal waste piping is 2 feet below the …show more content…

One 45 degrees, 8” diameter boot, one 45 degree 8”diameter elbow and 9ft 8 in duct with on “ diameter boot. One 8” diameter to 6” reducer. 11’ 6 in diameter ducts. One of them 90 degrees. Six feet of 10 in dimeter duct with one 90 degrees. 10” diameter duct with 6’ diameter boot. Two thermostats with wiring are needed. Question 4: Answer Supply line 1, 2”x1”x2” cooper tee, one piece of 1” diameter pipe approximetly 32ft long to connect from suppl to interior wall. One 1” 90 digree elbow one 1” piece 1ft, 1”x1”x1” copper tee and one piece of 1” pipe 2ft long to connect the fin tue convectors to the tees and elbow. The return line requires 2”x1x2 One 1”90 degree elbow Chapter 15 Electrical Question 1: Answer: Two lights, a three witch box and a four-way switch with three gang boxes Question 2: Answer To complete the system, two #12 copper, 1ft of wire and connected to the electrical device and wiring between lights are needed. Question 3: Answer It would require two 120 vot, 4’ by 2’ fluorescent light fixtures, three fluerecent light

Get Access