I would like to take this opportunity to thank you for choosing me to act as architect for this project of the hospital facility and residential development at the Short Strand Belfast. Notes for this project are described in the attached notes of our meeting on the 15th September 2015, which are based on the attached sketch proposal developed at our meeting 15th October 2015. During the meeting you discussed with me the target cost for the project, which does not include fees and VAT. You also noted that you would like the building works to commence 30th June 2016 and be completed by 30th June 2018. In my services for this project, you have asked me to produce a design solution for the project, for the planning and building control application, so that it has the best chance of success and approval, estimates of building costs, to calculate architects’ fees and monitor the progress of the project. A list of my services is described in the attached schedule ‘Large Project Services Schedule’ in the before-construction stages and in the subsequent construction stages. During the meeting you identified yourself as responsible for managing the construction stages of the project: this will include obtaining tenders and overseeing the building work. In providing these Services I will exercise reasonable skill and care, acting as your representative and advise you on any issues affecting the time, cost or quality of your project. I will not make any material changes to the
A project manager can be appointed by the client (especially if it was an inexperienced client in the construction industry where the majority of clients in the UK fall into this category), in order to help him build up his business needs case for the project development, find alternatives and options that are more suitable in order to achieve his business needs, work out the investment appraisals and risk assessments, choose the most suitable procurement method for the project, select the project team, establish and supervise the performance. An important task the project manager must perform before adopting the procurement method is to approach the client, and understand specifically what does he requires and what the outcomes from the new construction building are, more specifically the objectives and the products of the building. After
1.3 The example provided is a proposed new hotel located in Glencoe, Highlands. The client is Mr. Smith and the executing architects are R&M from Edinburgh. The Bill of Quantities has already been prepared and the price
You have been asked to bid on a project to paint a structure and you have the following information:
ORS 279C.100 (2) Architectural, engineering, photometric mapping, transportation planning or land surveying services means professional services that are required to be performed by an architect, engineer, photogrammetrist, transportation planner or land surveyor.
According to uniquely Northern Ireland (2008), and Belfast visitor guide (2011), Belfast is the capital and the largest city of the Northern Ireland. The climate is mild as a result of Atlantic Ocean breezes and the Gulf Stream, with comfortable summers and temperate winters, snow is uncommon, and however rainfall is heavy. Belfast has warmth and hospitality quite unlike anywhere else. Belfast is situated at the mouth of the River Lagan on the borders of County Antrim and down in the province of Ulster the city could be divided into quarters which each of them have a story to narrate to the visitors or the habitant. The quarters are City Centre, the Cathedral quarter, Queen’s quarter and Beyond the City Centre. Belfast is an adventurous
It is extremely important for the e ective development of the project that commitments are made and retained on the building
Reading Hospital home to a 647-bed acute care hospital located in West Reading, Pennsylvania, and Reading Health Rehabilitation Hospital, a facility in Spring Township, featuring a 50-bed skilled nursing unit and a 62-bed inpatient rehabilitation unit. They also provide office-based primary and specialty care through Reading Health Physician Network, in-home nursing care through Affilia Home Health, and retirement living through The Highlands at Wyomissing. An extensive network of outpatient services are provided through offices and QuickCare walk-in centers throughout the region.They serve most of Berks County Pennsylvani and West Reading. The Reading Hospital was rated number 24 out of 250 of the best hospitals in Pennsylvania according
The Richmond Hospital Site Development Plan addresses current service deficiencies and establishes a long-range framework for future development of the Richmond Hospital site. The Development Plan was closely aligned with Vancouver Coastal Health regional planning priorities.
The design concept of Riley hospital is promoting children to have hope. There were lots of design features can welcoming patients and visitors such as; design ornaments, artworks and video walls. Experiencing several interesting design features, children will ease their anxiety and fear when they arrived the hospital which usually strike children with fear. Even if the outpatient center main corridor whose aesthetics reflected its age, the new designed building has soothing places that would warmly welcome patients(Children), visitors and staff.
In 2000, the main hospital building remained unchanged but the cancer centre was extended to cover the entire nursing school. As a result of this, the original car park was divided into two so that it provided
The Client aims to develop a new Post Graduate School of Construction Management. The site is located at numbers 30 to 36 Park Terrace, Abbey.
• who will be responsible for planning and management of project operations as well as the roles of other bodies and organizations associated with the project
For this assignment the writer is going to discuss the nature and types of construction contracts and will explain the legal responsibilities of the various parties involved in the design and the construction process.
The client, Hall for Cornwall requires an extension and transformation of the existing building of Hall for Cornwall. This extension would be projected to the building of a new theatre, based on classical three-tiers and located at the centre of Truro’s City Hall. The report made for this purpose requires to be maintaining an effective feasibility report for the project, hereby, the client expects two choices or in other words, two schemes of plan in order to ensure that if one fails then the other one could be used. Moreover, the financial appraisal of all the processes that would be undergone in both of these schemes is also required to be included in this project. The
Review the project plans and specifications and comment on the building design, scheduling, possible cost savings measures and potential construction problems