Tender Evaluation Criteria Client: Bentley Resources Project: Racing Creek Bridge Date: 31/8/14 Revision: 1.0.0 BR_Acue_TEC_v1.0 AcuE Manager Wayne.devos@student.curtin.edu.au Table of Contents 3.0 TENDER EVALUATION CRITERIA 3 3.1 INTRODUCTION 3 3.2 EXPLANATION OF CRITERIA 4 3.2.1 EXPERIENCE 4 3.2.2 CAPABILITY 4 2.2.3 ORGANISATION 5 3.2.4 COMMUNICATION 5 3.2.5 DEDICATION 6 3.2.6 RESOURCEFULNESS 6 3.2.7 RESOURCES 6 3.2.8 COHESION 7 3.3 EVALUATION MARKING GUIDE 7 3.0 Tender Evaluation Criteria 3.1 Introduction Criteria Description Weighting Experience • Experience in constructing small scale structures that may require complex arrangements. • Experience in reading and interpreting technical drawings. • Experience in using the materials required. /15 Capability • Group is made up of competent members that are able to follow instructions. • Have the ability to cut and glue accurately • Tender must be capable of precision work. /20 Organisation • Meets the deadlines set by both the design team and the engineering faculty. • Maintains clear detailed records of meetings and events that take place during the construction process. /10 Communication • Easily be able to be reached. • Reply promptly to communications. /10 Dedication • Members of the group must attend all meetings. • The company selected must be comprised of members who are willing to take on the project and the associated
The first project proposal is Match My Doll Clothing line expansion consisted of expanding matching doll and child’s clothing and accessories. The second project proposal is Design Your Own Doll by creating customizable “one of a kind” doll features through the company’s website. The project selection criteria would base on quantitative and qualitative analysis. The quantitative analysis would base on the evaluation of discounting cash flow forecasts to determining the Net Present Value (NPV), Internal Rate of Return (IRR), and the Payback period of each proposed project. The qualitative analysis would include the potential project value of the company’s overall strategy, innovation, key project risks, and the project interdependencies to the whole company.
| We have never done project for this organization and don’t know much about them. One of company’s strengths is building good customer relationships, which often leads to further projects with that customer.
For your new project, please develop a project team (citing names, e-mail addresses, and telephone numbers).
I would welcome the opportunity to join your team and complete this assignment for you. I work well independently or with a team, I can follow direction or can lead any project. I am your girl for this job!
deliberately focus on developing our skills, then the results will come if we put in the time. It is really at its core, just producing a volume of work in order for us to get the failures out of the way on to extricating the gems.
management to the organization, senior management is committed to and supportive of the project to
The company should accept this project. The project payback period is between 2 to 3 years.
The walkway to your front door should be kept in good condition so it doesn't ruin the appearance of your home. Repairing cracks is important so no one trips and falls on your property. Falling on concrete could break a bone or cause a head injury. You could even get sued for not maintaining your walkway properly and creating a hazard. Here are a few tips for repairing cracks in your concrete walkway and improving its appearance.
The Portsmouth/ Kittery Memorial bridge preplacement project benefit-cost analysis was a very large project. The Memorial Bridge was one of the bridges that go over the Piscataqua River and links two different cities Portsmouth, New Hampshire and Kittery, Maine. One of the interesting things about this bridge was that it was jointly owned by New Hampshire Department of Transportation (NHDOT) and Maine Department of Transportation (MDOT). The bridge also provides a multi-modal transportation component for the cities. This multi-modal transportation impacts tourism, trade and commerce, and community life for both cities.
The I-35 bridge was fully constructed and opened on November 1967 in West Mississippi. According to Federal Highway Administration (FHWA) the dimension of the bridge is: length is 1907 ft and the maximum length span is 458 ft.The width 8 traffic lanes and 108 ft and the height is 64 ft above water. This steel arch deck truss collapse in August 1st, 2007. Due to some structural failures. This failure will be analyzed in the lines below.
Our group created a Pratt bridge design in order to maximize our efficiency with the limited amount of resources we were given. We also chose this type of bridge because it was simple and allowed for us to complete it within the given time frame. Our bridge was constructed using ⅛” x ⅛” balsa wood sticks, string, cardboard, paper, and a lot of hot glue. The balsa wood was used to make the frame, the cardboard was used to act as a level plane for the cans to stand on and as reinforcement for the sides of the bridge, and the paper and string were both used to construct the remaining roadbed. Balsa wood was used for the frame because it acts as a sturdy foundation. Cardboard was used as a level place to set our cans because of how smooth, flat, and sturdy it is. Cardboard was also used and attached to the sides of our bridge, as well as some of the joints, because it is very sturdy and does not pull apart or flex easily. Lastly, we used string and paper for the
The company is in the growth stage of its lifespan and company has several projects that clearly shows the defining, planning, executing, monitoring and closing stages of a project.
The North Fork Campbell Creek Bridge is a prestressed, reinforced-concrete girder bridge aligned primarily in the north-south direction and located in Anchorage, Alaska. It is a combined four lane highway structure constructed in 2007.The bridge has three continuous spans supported by two center piers with total length 109 m. The bridge has a slight curvature in profile and is skewed in plane. Each span consists of 11 prestressed RC girders, connected to each other by the diaphragms and shear connectors, and an asphalt concrete layer on the top of them. Each girder is supported by steel reinforced elastomeric bearing pads at the abutments and pier caps. The piers and seat-type abutments of the bridge are skewed at an angle of 65° compared
The land bridge is not Wegener's theory, but it is the theory that most people believed in. This theory started all the way in the early 1590s all the way till the 1930s, until it was proven wrong. The theory? Beginning in the early 1800s, American scientists and naturalists started investigating archaeological sites on the east coast of the United States, slowly working their way towards the west coast. The findings of these forebearers to modern archaeology suggested that people hadn't originated in North America but had populated the continent from another place. From where and how had yet to be discovered. From about 1890 to 1925, research, peopling of North America stalled because of inconclusive data. It wasn't until the mid-1920s that
Staff: sales person would be involved since we need their firsthand information to form our proposal.We also need to include senior managers to negotiate with prospective partners.