Steel Manufacturing Essay

1872 Words 8 Pages
Introduction
In past few years, companies and industries of various sizes have become aware that they need to improve business processes such as product development, order fulfilment, planning, distribution, and customer service. So everybody is now focusing on doing process improvement or redesigning.
Steel containers position an arousing curiosity or attention in the engineering and policy challenge to society. They have to meet the condition of a countable quantity of structural and physical standard, must be reasonably priced, and must have a negligible impact on the environment.
In this paper we will explore on the brief manufacturing process of steel containers and some vital issues relating to the production process.
The
…show more content…
The size ranges from 5 lit – 8 and 9 inch diameter, 7, 10 lit – 9 inch diameter, 11 lit - 8 and 9 inch diameter, 12 lit - 9 and 11 inch diameter, 15, 20, 25, 30 lit - 11 inch diameter, 57 lit - 14 inch diameter, 120 lit - 18 inch diameter.
In addition to this, in a steel container manufacturing company there are numerous objectives which are to be put into consideration and some of them will be discussed briefly in this paper.
Project and its development
The project is about redesigning the stages of UN/NON-UN standards fluid carrying steel containers or drums manufacturing process. The project is considered and conducted nearby at James G Carrick manufacturing plant, Glasgow. The entire process of manufacturing is quite vast so my area of operation concentres on three aspects of production locally called Flanger, Beader and Reducer (These terminologies are explained in activity number 3). The main objective of this project is to increase the rate of production and/or minimise the operational times accounting various range of products. Now to accomplish the goal, project was divided into three phases exploring literature review, research and design. However, the list of planned activities and their progress for the successful completion of project in allotted time period is mentioned below.
Activities and progress: The Project was divided into several work-streams to support the various strands of the project allowing me to successfully
Open Document