Techniques Used For Estimate Cost Based On The Chosen Traditional Method Of Procurement Of Housing Project

1050 WordsNov 24, 20155 Pages
The following summary will outline the possible techniques used to estimate cost based on the chosen traditional method of procurement of housing project, whilst also tying in with the main stages within the RIBA Plan of Works 2013 in the attempt to explore the key tasks, participants involved and their roles as per topic stage. The RIBA Plan of Works 2013 Stages: Stage 0: Strategic Definition. The clients require construction of a two - story, three bedroom detached house within the west midlands region. This is the projects realisation stage that is in place to make sure that the proposed business case have been fully considered for development constraints , the projects sustainability , preparation of feasibility studies and contingency plans as stated on NMR1 (2nd edition ). Estimate approximation gives a ball park figure (see appendix ) that shows a range per square meters / metered thus giving an estimate as highlighted when using the lower end and assuming a gross floor area of a hundred and fourteen square meters . The key task practitioners involved are mainly the client, design consultants, an architect or project manager. Stage 1: Preparation and Brief. Assembling of a project team and budget (Please see Appendix figure 2). Core aims to include development of a well prepared project brief that outlines project outcomes, risk assessment and a detailed insight on its practicality by reviewing the site survey for complications such as possible soil

More about Techniques Used For Estimate Cost Based On The Chosen Traditional Method Of Procurement Of Housing Project

Open Document