preview

USAG-H: A Case Study

Satisfactory Essays
Open Document

8A will fully occupy Building 1216 in USAG-H to meet TS/SCI requirements. 8A requires a minimum of 6x TS-level systems work station to remain fully operational which this facility provides. However, due to space limitations, 2ID will set up a T-SCIF tent. This option is most advantageous as it meets the proposed Concept of Operation timeline for both echelons and both will be able to perform required tasks. In addition, 2ID will have the requested 14 work stations for the workload. As a result, however, 2ID operational level will be effectively reduced due to network connectivity issues and the required manning. These issues will require a 24 hour schedule to compensate for the limited bandwidth and for site security.

Get Access