After the heavy rain brought by Irene passed over Vermont, the Winnooski River has raised to over 5 feet above its flood elevation. The flood crest is expected to arrive to Montpelier, state capital, in 48 hours. You are an engineer in charge ofcalculating the flood defense by increasing the levee  top elevation. Your estimate calls for 5000 CY of compacted material needed before the flood crest arrives. You have two borrow pit options: borrow pit A is located 1 hour away and has 7 Caterpillar 69C trucks with 30.9 CY capacity available. Borrow pit B is located 30 minutes away but has only 3 Caterpillar trucks with the same capacity. Assuming arround the clock work in the next 48 hours calculate which option will allow for completion of the work within the time constraint given. Records on file show the following soil properties at locations A and B: A: Y= 120 pcf, w = 18% B: Y= 125 pcf, w = 12% In order to assure adequate stability of the levee slopes, it will be required to compact the soil to 85% relative compaction with the maximum dry unit weight of compaction of 115 pcf. THE GIVEN UNIT WEIGHT IS DRY

Principles of Foundation Engineering (MindTap Course List)
9th Edition
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter5: Soil Improvement And Ground Modification
Section: Chapter Questions
Problem 5.13P
icon
Related questions
Question
After the heavy rain brought by Irene passed over Vermont, the Winnooski River has raised to over 5 feet above its flood elevation. The flood crest is expected to arrive to Montpelier, state capital, in 48 hours. You are an engineer in charge ofcalculating the flood defense by increasing the levee  top elevation. Your estimate calls for 5000 CY of compacted material needed before the flood crest arrives. You have two borrow pit options: borrow pit A is located 1 hour away and has 7 Caterpillar 69C trucks with 30.9 CY capacity available. Borrow pit B is located 30 minutes away but has only 3 Caterpillar trucks with the same capacity. Assuming
arround the clock work in the next 48 hours calculate which option will allow for completion of the work within the time constraint given. Records on file show the following soil properties at locations A and B:
A: Y= 120 pcf, w = 18%
B: Y= 125 pcf, w = 12%
In order to assure adequate stability of the levee slopes, it will be required to compact the soil to 85% relative compaction with the maximum dry unit weight of compaction of 115 pcf.
THE GIVEN UNIT WEIGHT IS DRY
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 9 steps with 8 images

Blurred answer
Knowledge Booster
Concepts of flood control
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning