Draft a work breakdown structure for the task of implementing and using a PC-based virus detection program (one that is not centrally managed). Don't forget to include tasks to remove or quarantine any malware it finds.

Question

Draft a work breakdown structure for the task of implementing and using a PC-based virus detection program (one that is not centrally managed). Don't forget to include tasks to remove or quarantine any malware it finds.

check_circleAnswer
Step 1

Work breakdown structure for implementing PC based virus detection task:

Work breakdown structure for implementing PC based virus detection task is given below

Task

Effort (in minutes)

Skill

Download Microsoft Security Essentials for desktop

0.25

End user

Install of required application on PC

0.5

End user

Configuring application settings

0.25

End user

Scan Microsoft Security Essentials

2.5

End user

Remove the virus from the system

0.25

End user

 

 

...

Want to see the full answer?

See Solution

Check out a sample Q&A here.

Want to see this answer and more?

Our solutions are written by experts, many with advanced degrees, and available 24/7

See Solution
Tagged in

Engineering

Computer Engineering

Related Computer Engineering Q&A

Find answers to questions asked by student like you

Show more Q&A add
question_answer

Q: 2) Identify the errors in the following programs a) 3 errorspublic class Test {public static void ma...

A: Hey, since there are multiple questions posted, we will answer first question. If you want any speci...

question_answer

Q: public class TestAverage {public static void main(String[] args) {int test1, test2, test3, sum;Scann...

A: The objective of the program is to calculate the average, now since the variable which holds the ave...

question_answer

Q: this question is from fundamentals of logic. related to boolean algebra. I am unable to decipher the...

A: Click to see the answer

question_answer

Q: Hello! Write a C++ Program that simulates a basic calculator using functions which performs the oper...

A: Solution:Given data,The C++ code to perform the calculator operations using function is given below:...

question_answer

Q: How would i solve this question? I have the sample output but how do I make it? Write a program in p...

A: Program Instructions:Create a menu using print() function and use while loop to repeatedly show the ...

question_answer

Q: What is the CPU time if the number of instructions executed by the program is 500 cycles per instruc...

A: CPU time:The formula for computing the CPU time is provided below:

question_answer

Q: Write a program called ListEvenNumbers wich prints the even numbers from 20 to 30 (including 30). an...

A: As there is no programming language mentioned, we are doing this program in java to print even numbe...

question_answer

Q: The following print code is to find out the ASCII code, character for the decimal codes,and comparis...

A: Reasons for displaying given output for each line of code: For “System.out.println((int)'1');”: From...

question_answer

Q: 1. What is the output of the following code? (A)for (int i = 1; i < 4; i++) {System.out.println("...

A: Since multiple questions have been asked and it is not clear which one question you want to be answe...

Sorry about that. What wasn’t helpful?