Kubes Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on total fixed manufacturing overhead cost of $90,000, variable manufacturing overhead of $3.50 per direct labor-hour, and 30,000 direct labor-hours. The company has provided the following data concerning Job A477 which was recently completed: Total direct labor-hours 100 Direct materials $ 520 Direct labor cost $ 2,800 The total job cost for Job A477 is closest to:
Variance Analysis
In layman's terms, variance analysis is an analysis of a difference between planned and actual behavior. Variance analysis is mainly used by the companies to maintain a control over a business. After analyzing differences, companies find the reasons for the variance so that the necessary steps should be taken to correct that variance.
Standard Costing
The standard cost system is the expected cost per unit product manufactured and it helps in estimating the deviations and controlling them as well as fixing the selling price of the product. For example, it helps to plan the cost for the coming year on the various expenses.
Kubes Corporation uses a job-order costing system with a single plantwide predetermined
Total direct labor-hours 100
Direct materials $ 520
Direct labor cost $ 2,800
The total
Trending now
This is a popular solution!
Step by step
Solved in 2 steps