Structural Analysis
6th Edition
ISBN: 9781337630931
Author: KASSIMALI, Aslam.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution
Trending nowThis is a popular solution!
Step by stepSolved in 2 steps with 1 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- PROBLEM: From the following data, prepare the following: a) Network Diagram b) The Early Start and The Early Finish c) The Last Start and The Last Finish d) The Float ACTIVITIES TIME DURATION IN WEEKS 1-2 Demolition and Clearing 8 2-3 Excavation 14 2-5 Underground Installation 3-4 Foundation and Columns 4-6 Construction of Second Floor 4-7 Roof Framing and Flooring 5-7 Ground Floor Slab 4 5-8 Mechanical and Electrical Services 12 6-7 Construction of Exterior Walls 12 7-9 Construction of Interior Partitions 10 8-9 Mechanical and Electrical Equipment and 12 Fixtures 9-10 Painting and Finishing Work 8. 6,arrow_forwardThe total estimated duration of the mass excavation activities in an office building project is 40 days. After 18 days, the project manager receives the following information: Activity Earth Clay Rock What is the CPI of Earth excavation? Select the correct response: 1.06 1.22 Total Volume to be excavated (cubic yard) 20,000 8,000 11,000 0.93 0.82 Unit Price 2.50 5.50 7.50 Actual volume excavated (cubic yard) 8,400 3,100 6,200 Actual cost 19,750 20,850 53,900arrow_forwardExpress your computations and answers in the nearest 4 DECIMAL PLACES. Show COMPLETE SOLUTION and ILLUSTRATIONS The areas of the cross-section of excavation is 4 567.80 sq.m, 3 456.90 sq.m, and 3 876.30 sq.m. The spacing of each cross-section from each other is 10m.A Dump Truck is rented Php 20,000 per day and can make 7 trips in a day. Find the cost of hauling if 5 Dump Trucks with a capacity of 10 cu.m per trip is used.arrow_forward
- A consulting engineering firm is preparing a pre- liminary cost estimate for adesign/construct proj- ect of a brackish groundwater desalting plant. The firm, which completed a similar project in 2001 with a construction cost of $30 million, wants to use the ENR construction cost index to update the cost. Estimate the cost of construction for a similar- size plant in mid-2006 when the index value was 7700.arrow_forwardDevelop a programming budget estimate for a 100,000 square-foot warehouse, assuming a square-foot cost factor of $60 per square foot. The site will be about 200,000 square feet with a site development cost of $3 per square foot. Use the following allowances to prepare your budget estimate: - Owner-furnished FFE: $1,000,000 - Owner soft costs: $800,000 - Programming fees: $50,000 - Geotechnical Investigation: $390,000arrow_forwardAssume that you are a member of the team assigned to design a solid waste land fill. What data willyou need to be able to design the land fill ? Write down them and explain briefly for what purpose thatdata will be used.arrow_forward
- highway engineeringarrow_forwardA landfill project requires 5000 m3 of compacted soil. The void index specified for the compacted landfill is 0.7. Three borrowing areas are available as indicated in Table 1, which relates the respective soil void rates and the cost per cubic meter of soil transport for the proposed construction site. Carry out the necessary calculations to select the borrowing area from which soil should be brought in to minimize costs. Assume Gs of 2.6 for all areas loan. Table 1 presents the data.arrow_forwardAssume two truckloads, 5.59 hours of actual collection per day, the truck be if it has a compaction ratio of 3.5:1, and pickup vehicie averages 5 mph between stops that are on the average separated by 150 feet. Each stop collects from two households that each put out two full 30-gallon (4.9 cubic feet) containers. it takes an average of 29 seconds to empty one container. What is the time required to serve each stop in seconds?arrow_forward
- The total estimated duration of the mass excavation activities in an office building project is 40 days. After 18 days, the project manager receives the following information: Activity Earth Clay Rock 1,500 What is the schedule variance of Earth excavation? Select the correct response: -1,500 Total Volume to be excavated (cubic yard) -1,250 20,000 8,000 11,000 1,250 Unit Price 2.50 5.50 7.50 Actual volume excavated (cubic yard) 8,400 3,100 6,200 Actual cost 19,750 20,850 53,900arrow_forwardDevelop a programming budget estimate for a 100,000 square-foot warehouse, assuming a square-foot cost factor of $60 per square foot. The site will be about 200,000 square feet with a site development cost of $3 per square foot. Use the following allowances to prepare your budget estimate: - Owner-furnished FFE: $1,000,000 - Owner soft costs: $800,000 - Programming fees: $50,000 - Geotechnical Investigation: $390,000arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning