Table 1 shows a direct time study data from an assembly line. Job element B is in automatic mode while other job elements are in manual operations. The delay allowance is 5%, fatigue allowance is 8% and personal allowance is 7%. Please use 4 decimal places for the rating value and 3 decimal places for your standard time. Table 1: Direct time study data Job Average Process Time Rating Element A 100 1+0.001(264) 1 B 25 1+ 0.002(264) 1-0.001(264) 1- 0.0005(264) C 40 100 E 200 Calculate standard time for Job Element A. Calculate standard time for Job Element B. Calculate standard time for Job Element C. Calculate standard time for Job Element D. iv. V. Calculate standard time for Job Element E. vi. Calculate the overall standard time for the whole process.

Automotive Technology: A Systems Approach (MindTap Course List)
6th Edition
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Jack Erjavec, Rob Thompson
Chapter34: Emission Control Diagnosis And Service
Section: Chapter Questions
Problem 5RQ: Explain why the I/M 240 and similar tests are being replaced by the OBD II system test.
icon
Related questions
Question
1.
Table 1 shows a direct time study data from an assembly line. Job element B is in automatic
mode while other job elements are in manual operations. The delay allowance is 5%, fatigue
allowance is 8% and personal allowance is 7%. Please use 4 decimal places for the rating
value and 3 decimal places for your standard time.
Table 1: Direct time study data
Job
Average
Rating
Element
Process Time
A
100
1+0.001(264)
B
25
1
1+ 0.002(264)
1-0.001(264)
1 - 0.0005(264)
C
40
100
E
200
i.
Calculate standard time for Job Element A.
ii.
Calculate standard time for Job Element B.
111.
Calculate standard time for Job Element C.
iv.
Calculate standard time for Job Element D.
V.
Calculate standard time for Job Element E.
vi.
Calculate the overall standard time for the whole process.
Transcribed Image Text:1. Table 1 shows a direct time study data from an assembly line. Job element B is in automatic mode while other job elements are in manual operations. The delay allowance is 5%, fatigue allowance is 8% and personal allowance is 7%. Please use 4 decimal places for the rating value and 3 decimal places for your standard time. Table 1: Direct time study data Job Average Rating Element Process Time A 100 1+0.001(264) B 25 1 1+ 0.002(264) 1-0.001(264) 1 - 0.0005(264) C 40 100 E 200 i. Calculate standard time for Job Element A. ii. Calculate standard time for Job Element B. 111. Calculate standard time for Job Element C. iv. Calculate standard time for Job Element D. V. Calculate standard time for Job Element E. vi. Calculate the overall standard time for the whole process.
Expert Solution
steps

Step by step

Solved in 3 steps with 1 images

Blurred answer
Knowledge Booster
Dimensional Analysis
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Automotive Technology: A Systems Approach (MindTa…
Automotive Technology: A Systems Approach (MindTa…
Mechanical Engineering
ISBN:
9781133612315
Author:
Jack Erjavec, Rob Thompson
Publisher:
Cengage Learning