The AWs of three cost alternatives are $-23,000 for Alternative A, $-21,600 for B, and $-27,300 for C. On the basis of AW values, the best economic choice is:a. select alternative A.b. select alternative B.c. select alternative C.d. select the do nothing alternative.
Q: The following information refers to three mutually exclusive alternatives. The decision maker wishes…
A: The following calculations are done to show the suitability of every machine for the chosen…
Q: repare and present a computation which illustrates what price should be selected in order to…
A: There are two options for the company:- Option 1: Produce 7000 boxes using company's own capacity at…
Q: Three independent alternatives (X, Y and X) were ranked by the B/C method, in terms of increasing…
A: The benefit-cost ratio (BCR) compares the benefits derived with the related costs of a proposed…
Q: Ouzts Corporation is considering Altemnative A and Alternative B. Costs associated with the…
A: While taking decision regarding various alternate , we need to consider the various cost and check…
Q: Calculate the NPV of each project. (Round your answers to the nearest whole dollar. Use parentheses…
A: NPV = Cash Inflows - Cash outflows = (Annual cash inflows * cumulative PV @ 12% for 7 years) - Cost…
Q: A business encountered the following problem while choosing between alternative locations X and Y.…
A: The selling price of a product can be selected based on the expected cost and desired profit. Cost…
Q: Raju is a price taker in a product market that is very competitive. The market price is now $80 per…
A: Introduction:- Calculation of desired profit as follows:- =Market price x Desired profit =$80 x 20%…
Q: Specifically, Mr. Schaefer wants you to do the following: PART 1. Prepare a cost-volume-profit…
A: CVP analysis is used for looking at the impacts of cost and Operating Profit. It estimates how much…
Q: Ouzts Corporation is considering Alternative A and Alternative B. Costs associated with the…
A: Financial Advantage: The financial advantage is the cost-saving or more benefit generated by one…
Q: Your boss had requested you to select the best design that will give the best profit to the company.…
A: The best alternative is the one with the highest NPV. NPV = Present value of future cash flows -…
Q: Suppose that you could invest in the following projects but have only $24,480 to invest. Which…
A: The project with Higher net present value will be selected because this the amount net amount that…
Q: d. From your answers to parts a-c, which project would be selected? -Select- If the WACC was 18%,…
A: Capital budgeting methods: There are several techniques that can be used to evaluate prospective…
Q: Ouzts Corporation is considering Alternative A and Alternative B. Costs associated with the…
A: Here we should consider only relevant costs. Here all costs are relevant costs
Q: Compare two alternatives using i = 10% Alternative X Alternative Y First cost, $ M&O costs, $/year…
A: The projects can be evaluated based on various capital budgeting techniques. However, the decision…
Q: Three mutually exclusive design alternatives are being considered. The estimated sales and cost data…
A: AW or Annual Worth of project shows equivalent annual benefits that will be generated from project…
Q: When fixed costs are $18,000 and the contribution margin per unit is $4, the breakeven point is
A: Breakeven point is the point at which total revenue is equal to total costs. It is calculated as:…
Q: Zelman to answer the following questions. Calculate the per unit cost of an initial visit using…
A: Activity based costing (ABC) assigns manufacturing overhead costs to products in a more logical…
Q: A firm is considering two location alternatives. At location A, fixed costs would be $4,000,000 per…
A: Alternative A: Fixed Cost = $4,000,000 Variable Cost = $0.30 per unit Expected annual demand = 9…
Q: A company is considering the following alternatives: Alternative 1 Alternative 2 Revenues…
A: The income statement shows the net income or net loss that is calculated by deducting the expenses…
Q: Problem 1: Four design alternatives were proposed. Each design alternative has unique costs and…
A: Calculation of the best alternative using the incremental B/C ratio analysis is shown below:
Q: Ouzts Corporation is considering Alternative A and Alternative B. Costs associated with the…
A: Alternative A Alternative B Materials costs $49,000 $64,700 Processing costs 44,900 44,900…
Q: If, Total Fixed cost OMR 40000, Selling price per unit OMR 30, and Variable cost per unit OMR 12,…
A: The differentiation between anticipated profit margins and break-even point would be known as the…
Q: As the project manager for HomeGrown, you are responsible for deciding which if any of the proposals…
A: The term Average Rate of Return (ARR) designates the percentage rate of return anticipated on an…
Q: is working on following two mutually exclusive proposals for in d optimizing the traffic lighting.…
A: Benefit cost ratio is used for financial analysis of long term projects and it must be more than 1…
Q: If the sales price is $150 per unit, the variable cost is $90 per unit, and total fixed costs is…
A: Contribution margin per unit = Sales price - Variable cost Contribution margin ratio = Contribution…
Q: Currently the unit selling price of a product is $200, the unit variable cost is $110, and the total…
A: Break even point means a situation where the is neither profit nor loss. Sales revenue is sufficient…
Q: . Consider the following table which summarizes data of two alternatives. First cost Annual return…
A: solution given Alternative 1 Alternative 2 First cost 500000 800000 Annual…
Q: The annual worth (AW) amounts of the following independent alternatives are: $-23,000 for…
A: Option D is correct. Select the Do nothing alternative.
Q: What can you say about the relative costs for the two alternatives?
A: Fixed cost: the costs that remain fixed for total production or sales but vary in per unit…
Q: A company is considering two alternatives with the following costs: Alternative 1 Alternative…
A: The company always try to earn more profits. The profits of the company can be analyzed using the…
Q: Complete the following paragraphs : If the common cost ( 450 000)$. distribution between S. and R.…
A: The net realizable value is calculated as sales value minus cost after split off point.
Q: The Gargus Company, which manufactures projection equipment, is ready to introduce a new line of…
A: Total absorption cost per unit = Variable manufacturing cost + Applied fixed manufacturing overhead…
Q: Jason is interested in finding the breakeven point for a new pump it plans to produce. The price of…
A: Calculation of Break Even Point of Operations Selling Price of the pump…
Q: also have some confuse for the decision: system B is more beneficial then system A due to lower…
A: Net present value is the difference between present value of cash flow and initial investment and it…
Q: If the cost for unit 100 in a unit theory learning curve scenario is $7.5M (FY15$), and the learning…
A: Cost for 100 unit = 7.5 mn Cost for 400 units if 85.5% learning curve
Q: Consider three mutually exclusive alternatives. The MARR is 10%. Year X |- $125 - S60 - $65 20 20 20…
A: Benefit to cost ratio is the ratio of present value of benefit divided by present value of cost.…
Q: Using Benefit – Cost Ratio analysis method, determine the best alternative in the following chart if…
A: Benefit - Cost Ratio = PW of Benefits/ PW of Cost
Q: Alternatives A B Cost x P3,200 Salvage Value 900 600 Annual Benefit 1150 720 Life (years) 18
A: The benefit-cost ratio is an indicator that shows the relationship between the relative costs and…
Q: Consider the following table which summarizes data of two alternatives. First cost Annual return…
A: Rate of Return Method: it is the method of capital budgeting in which a rate is determined to find…
Q: Use expected value to recommend a decision.
A: Business Entities sometimes face a dilemma whether to manufacture the goods internal or to outsource…
Q: Samuels Company is considering pricing its 10,000−gallon petroleum tanks using either variable…
A: The question is based on the concept of calculation of cost of same item by different methods. The…
Q: Two alternatives, code-named X and Y, are under consideration at Guyer Corporation. Costs associated…
A: Financial advantage= Total cost for alternative x - total cost for alternative Y
Q: Can you please explain the statement with an example? Also, check whether my understanding of the…
A: Fixed costs refer to the costs that do not tend to change with the change in production volume…
Q: Two alternatives, code-named X and Y, are under consideration at Guyer Corporation. Costs associated…
A: In the given question, Total cost of both alternatives will be calculated. Since Alternative is Y is…
Q: From the PW, AW, and FW values shown, the conventional B/C ratio is closest to: (a) 1.27 (b) 1.33…
A:
Q: Sandra Saunders and her design team are analyzing theproduction costs for three alternative monitor…
A: Monitor A Cost = 700000+250 = 700250 Monitor B Cost = 1000000+125 = 1000125 Monitor C Cost=…
Q: Two projects are being considered. If B1 = $2,000 and C1 = $1,000 for B1/C1 = 2, and B2 = $10,000,…
A: While comparing various projects, one should select the project which have maximum profit.
The AWs of three cost alternatives are $-23,000 for Alternative A, $-21,600 for B, and $-27,300 for C. On the basis of AW values, the best economic choice is:
a. select alternative A.
b. select alternative B.
c. select alternative C.
d. select the do nothing alternative.
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Which of the alternatives do you think Barry should select? Why? (Select the best choice below.) A. Alternative B should be selected because it has the highest NPV. B. This cannot be determined from the information provided. C. Alternative B should be selected because its equivalent annual cost is less per year than the annual equivalent cost for Alternative A. D. Alternative A should be selected because its equivalent annual cost is less per year than the annual equivalent cost for Alternative B.Ouzts Corporation is considering Alternative A and Alternative B. Costs associated with the alternatives are listed below: Alternative A Alternative B Materials costs $ 49,000 $ 64,700 Processing costs $ 44,900 $ 44,900 Equipment rental $ 15,500 $ 15,500 Occupancy costs $ 17,400 $ 26,100 What is the financial advantage (disadvantage) of Alternative B over Alternative A? Garrison_16e_Rechecks_2019_10_10 Multiple Choice $126,800 $(24,400) $151,200 $(139,000)Three mutually exclusive design alternatives are being considered. The estimated sales and cost data for each alternative are given. The MARR is 20% per year. Annual revenues are based on the number of units sold and the selling price. Annual expenses are based on fixed and variable costs. Determine which selection is preferable based on AW. State your assumptions.
- Consider the following table which summarizes data of two alternatives. First cost Annual return Life Alternative 1 Rs. 5,00,000 Rs. 1,50,000 10 yrs Alternative 2 Rs. 8,00,000 Rs. 2,50,000 10 yrs Find the best alternative based on the rate of return method of comparison.A company is considering the following alternatives: Alternative 1 Alternative 2 Revenues $170000 $170000 Variable costs 62000 72000 Fixed costs 30000 30000 Which of the following are relevant in choosing between the alternatives?In Problem 22, if P(s1) = 0.25, P(s2) = 0.50, and P(s3) = 0.25, find a recommended decision for each of the three decision makers. (Note: For the same decision problem, different utilities can lead to different decisions.) 22. Three decision makers have assessed utilities for the following decision problem (payoff in dollars): The indifference probabilities are as follows: a. Plot the utility function for money for each decision maker. b. Classify each decision maker as a risk avoider, a risk taker, or risk-neutral. c. For the payoff of 20, what is the premium that the risk avoider will pay to avoid risk? What is the premium that the risk taker will pay to have the opportunity of the high payoff?
- Hudson Corporation is considering three options for managing its data warehouse: continuing with its own staff, hiring an outside vendor to do the managing, or using a combination of its own staff and an outside vendor. The cost of the operation depends on future demand. The annual cost of each option (in thousands of dollars) depends on demand as follows: If the demand probabilities are 0.2, 0.5, and 0.3, which decision alternative will minimize the expected cost of the data warehouse? What is the expected annual cost associated with that recommendation? Construct a risk profile for the optimal decision in part (a). What is the probability of the cost exceeding $700,000?San Juan, Incorporated, is considering two alternatives: A and B. The costs associated with the alternatives are listed below: Alternative A Alternative B Material costs $ 35,000 $ 57,000 Processing costs 36,000 57,000 Building costs 12,000 28,000 Equipment rental 19,000 19,000 Are the materials costs and processing costs differential in the choice between alternatives A and B? Multiple Choice Neither materials costs nor processing costs are differential. Both materials costs and processing costs are differential. Only processing costs are differential. Only materials costs are differential.How would I solve for marginal cost when given two x? As you can see in the question it states "they can produce 10,000 items for $547,500 and 60,000 items for $737,500", how would I go about solving the problem when given two slopes?
- Assume that a manufacturer can purchase a needed component from a supplier at a cost of $9.50 per unit, or it can invest $60,000 in equipment and produce the item at a cost of $7.00 per unit. (a) Determine the quantity for which total costs are equal for the make and buy alternatives. (b) What is the minimum cost alternative if 15,000 units are required? What is the minimum cost? (c) If the number of units required of the component is close to trhe break even quantity, what factors might might influence the final decision to make or buySandra Saunders and her design team are analyzing theproduction costs for three alternative monitor designs.Given the cost information below, and assuming form andfunction are similar for each design, which monitor designwould you recommend? Monitor Fixed Cost Variable CostA $ 700,000 $250B $1,000,000 $125C $1,500,000 $100Three alternatives identified as X, Y, and Z were evaluated by the B/C method. The analyst calculated project B/C values of 0.92, 1.34, and 1.29. The alternatives are listed in the order of increasing equivalent total costs. The analyst is not sure whether an incremental analysis is needed. (a) What do you think? If no incremental analysis is needed, why not; if so, which alternatives must be compared incrementally? (b) For what type of projects is incremental analysis never necessary? If X, Y, and Z are all this type of project, which alternatives should be selected based on the calculated B/C values?