The trim line at PW is a small subassembly line that, along with other such lines, feeds into the final chassis line. The entire assembly line, which consists of more than 900 workstations, is to make PW's new E cars. The trim line itself involves only 13 work elements and must handle 20 cars per hour. Work-element data are as follows: Work Element A B C D E F G H J K L M Time (Minutes) 1.8 0.4 1.6 1.5 0.7 0.5 0.8 1.4 1.4 1.4 0.5 1.0 0.8 Immediate Predecessor(s) None None None A A E B C D F, G H J I, K, L a. Draw a precedence diagram. b. What cycle time (in minutes) results in the desired output rate? c. What is the theoretical minimum number of stations?
Q: The data has been sorted for your convenience. Calculate the percent of total complaints for each…
A: The customer service team is the first line of defense in dealing with customers’ complaints. A lot…
Q: The Warren Fischer Computer Corporation purchases 8000 transistors each year as components in…
A: Many companies, rather than relying on a reorder quantity formula, simply place orders for products…
Q: What does leveraging mean in business strategy?
A: The generic term is not readily generalized and needs to be more connected to commercial meaning.…
Q: the three primary risk mitigation strate y that supply chain managers can use.
A: Prior to any accident or disaster, risk mitigation measures are aimed to eliminate, lessen, or…
Q: Define quality and how important it is in operation management
A: Here, As per the question, I would prepare the definition for Quality and then, I would explain how…
Q: XYZ Corporation operates two plants, each of which has a capacity of 170 units per day. Each day,…
A: Given that:
Q: Sea Wharf Restaurant would like to determine the best way to allocate a monthly advertising budget…
A: (a)
Q: a) What will be their hourly output? b) If there are 45 tests to grade, how long will the grading…
A: As per Bartleby guidelines, we can only solve the first three subparts of one question at a…
Q: An appliance manufacturer wants to contract with a repair shop to handle authorized repairs In…
A: Process capability Ratio (Cpk) is a statistical tool which helps to identify the process capability…
Q: Procurement is just like plants and animals, it’s born, it grows, it matures and eventually dies’.…
A: The process and methods involved in purchasing or obtaining any material, good or thing that a…
Q: is the movement of products and materials from manufacturing to the point of consumption. A.…
A: A. Material Management:- Material management includes the planning and the execution of the supply…
Q: Data collected on the yearly registrations for a Six Sigma seminar at the Quality College are shown…
A: Given data is Alpha = 0.40 Forecast for year 1 = 5
Q: 1. Seaports are important in global supply chains. Their management plays an important part in…
A: Queueing system analyzes the arrival pattern and service time in a system and optimizes the queue in…
Q: Operation management - explain the global operations strategies options .
A: Introduction: Global operations strategies are the phrase used by operations managers of…
Q: In this part you will solve a Linear Programming problem using Excel Solver. Norin kitchen wants to…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: Construct the Project Network Diagram 2.Find the Expected Duration and Standard Deviation and…
A: The critical path is a method for determining the most efficient way to complete a project. It…
Q: Data collected on the yearly registrations for a Six Sigma seminar at the Quality College Year 1…
A: A time series forecasting technique called exponential smoothing may be expanded to handle data with…
Q: A certain diet requires at least 60 units of carbohydrates, 45 units of protein, and 30 units of fat…
A: Let quantity of supplement A be x and that of Supplement B be y.
Q: Briefly describe what happens in each of the five project management process groups (initiating,…
A: Project management is concerned with designing and planning business projects keeping in mind the…
Q: A process that produces computer chips has a mean of .04 defective chips and a standard deviation of…
A: Process capacity index (Cp) is a statistical tool which helps to identify whether a process capable…
Q: Penny Farthing Penny Farthing, a leading manufacture of full metal and coil wire zippers, has been…
A: The indifference point is the point where the profit of the two alternatives is the same. The volume…
Q: Project management tools and techniques........................ Are used to select the…
A: Are used to select the appropriate and potential projects:- Project management tools and techniques…
Q: A manufacturer can produce an item for $139/unit with a fixed cost of $56,034. The alternative is to…
A: The break-even point is the point at which the total cost of production equals the total revenue…
Q: WEEK 1 maner 234567 ∞ 8 FORECAST DEMAND 135 135 135 134 134 144 155 156 Week 1 2 3 4 5 6 7 8 ACTUAL…
A: MAD is the proportion between total absolute error values and the number of weeks considered to…
Q: When a company in the U.S. contracts some of their jobs to other firms. These firms may be in the…
A: Manufacturing Offshoring is the act of locating parts of a company's operations or services abroad…
Q: Activity predecessor PERT Chart A B C D E F G H I J K L M N O P Q R C'C AC A,BC ABC D EFG H IJ KL KL…
A: PERT is an acronym for Program Evaluation Review Technique. PERT chart shows the sequence and…
Q: 1. A company would like to develop an aggregate plan and evaluate its cost using the transportation…
A: Since backorder cost is not given, it is assumed that backorders are not allowed. This means ending…
Q: Find attached the scenario - Discuss possible ways that Checkers can utilise evaluate and select a…
A: Suppliers are one of the core elements of a business. They are the driving force for any business…
Q: How can we continue the production and maintain the target of finished and raw products if the…
A: Definition When the number of workers or employees needed in a company to perform the tasks is less…
Q: A cafeteria serving line has a coffee urn from which customers serve themselves. Arrivals at the urn…
A: Given data is Arrival rate (lambda) = 2 per minute Service rate (mu) = 25 seconds = 6025=2.4 mins
Q: Suppose the optimistic estimate for completing a particular task is 2 weeks, the pessimistic…
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: In the following scenario, what will your stockout costs be if you have 200 hammers in stock and you…
A: Arrange the orders in ascending order Order received 80 60 50 30 120 Order…
Q: An avant-garde clothing manufacturer runs a series of high-profile, risque ads on a billboard on…
A: Firstly, The given Data is Now Arrange , them From High to low:
Q: 1. Explain the meaning of the term production or operations and describe the three kinds of utility…
A: As per guidelines, answering the 1st question. 1. Production/operations refers to the process in…
Q: D 2 Dave's earliest start (ES) and earliest finish (EF) are:
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: Discuss the importance of following a well-integrated change control process on IT projects. What…
A: A formal approach is called "Change Control." It is configured to allow project teams to change the…
Q: Dave Fletcher was able to determine the activity times for constructing his laser scanning machine.…
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: Bobby, another enterprising barber, is thinking about advertising in the local newspaper because he…
A: Assume that service is distributed exponentially and that client arrival is Poisson distributed.…
Q: 2. Production Schedule is a Mess Henry Gantt greatly contributed to the classical management system…
A: Henry Gantt was a famous mechanical engineer who derived many concepts and contributed to the field…
Q: 5- A sourcing strategy for procuring leverage items would be to? a-use reverse auctions.…
A: Note: - Since we can answer only one question, we will answer question 5 here. If an answer is…
Q: The Healthy Chocolate Company makes a variety of chocolate candles, including a 12-ounce chocolate…
A: It measures the capability of the process in terms of its consistency in average performance. In…
Q: information be made available to everyone through public records?
A: Information Sharing is a Crucial part for a firm to know its stay in the market.
Q: a) What will be their hourly output? b) If there are 45 tests to grade, how long will the grading…
A: As per Bartleby guidelines, we can only solve the first three subparts of one question at a…
Q: Peter Ittig's department store, Ittig Brothers, is Amherst's largest independent clothier. The The…
A: A process control chart is a type of statistical graph that monitors the quality of a process over…
Q: The actual number of patients at Providence Emergency Medical Clinic for the first six weeks of this…
A: Parts a) and b) are solved and answers are updated in the question. We will solve question part c).…
Q: 20. The three inputs for an MRP parts explosion are
A: MRP stands for Material Requirement Planning. MRP Parts explosion is used to generate purchase…
Q: Summary of this case study, and the recommendation for this case study
A: The company was started when the owner was studying and the company earned high revenue ($100,000)…
Q: What type of inventory would be destroyed in a supermarket?
A: A supermarket has a huge variety of inventory as it provides different kinds of goods all under one…
Q: You want to develop a three-sigma R-Chart. You know the average range is 6 based on several samples…
A: A control chart is a graphical representation of data that is used to monitor or improve the…
Q: (3) A project was planned using PERT. Its expected completion time was determined to be 85 days. The…
A: NOTE: We are allowed to do one question only. Ans 3.
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 1 images
- The trim line at PW is a small subassembly line that, along with other such lines, feeds into the final chassis line. The entire assembly line, which consists of more than 900 workstations, is to make PW’s new E cars. The trim line itself involves only 13 work elements and must handle 20 cars per hour. Work-element data are as follows: Work Element Time (Sec) Immediate Predecessor(s) A B C DE F G H I J K L M 1.8 0.4 1.6 1.5 0.7 0.5 0.8 1.4 1.4 1.4 0.5 1.0 0.8 None None None A A E B C D F,G H J I,K,L a. Draw a precedence diagram.b. What cycle time (in minutes) results in the desired output rate?c. What is the theoretical minimum number of stations?d. Use the longest work element decision rule to balance the line and calculate the efficiency of your solution.e. Use the most followers work element decision rule to balance the line and calculate the efficiency of your solution.An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the totaltime for all tasks is 18 minutes. The line will operate for 450 minutes per day.a. What are the minimum and maximum cycle times?The trim line at PW is a small subassembly line that, along with other such lines, feeds into the final chassis line. The entire assembly line, which consists of more than 900 workstations, is to make PW’s new E cars. The trim line itself involves only 13 work elements and must handle 20 cars per hour. Work-element data are as follows Work Element Time (Sec) Immediate Predecessor(s) A 2.4 None B 0.5 None C 2.1 None D 1.8 C E 1.1 B F 0.9 A G 2 A H 0.7 F I 0.7 D J…
- Bill builds benches in a small shop and he plans to operate five 8-hour days perweek. Each bench has two ends and a top. It takes 5 minutes to cut and sand eachend and 2 minutes to make each top. Assembly requires 8 minutes per bench, andpainting requires 5 minutes per bench. Bill has one employee who makes the topsand ends. Bill will do the final assembly and painting. He also plans 1 hour per dayfor setup and teardown for each department.a. How many benches should he plan to build per week?b. How many hours per week are required for each person?c. Suggest ways to increase the number of benches produced per weekConsider a two-station production line. Station 1 consists of a single machine with an average processing times of 1 hours per job, while Station 2 have two parallel machines which are identical with average processing times of 2 hours per job. What are the rate of the bottleneck and average raw process time for this line? rb = 1 parts/hour; To=2 hours. rb = 1 parts/hour; To=3 hours. rb = 0.5 parts/hour; To=2 hours. rb = 0.5 parts/hour; To=3 hours.An assembly line has 10 serial stations with process times of 1, 2, 3, 4,..., 10 respectively. The process time of the system is: a) 550% of its process cycle time. b) 18.18% of its process cycle time. c) 50% of its process cycle time. d) 100% of its process cycle time.
- An assembly line for inkjet printers is composed of 8 persons performing different tasks. Compute forthe cycle time if the line has an 8-hour shift and requires 95 units to be finished in one shift.True or False: In the Theory of Constraints (TOC), the primary goal is to optimize individual processes within an organization rather than focusing on the overall system's performance.The trim line at PW is a small subassembly line that, alongwith other such lines, feeds int1, o the final chassis line.The entire assembly line, which consists of more than 900workstations, is to make PW’s new E cars. The trim line itselfinvolves only 13 work elements and must handle 20 cars perhour. Work-element data are as follows:Work Element Time (Sec) Immediate Predecessor(s)A 2.4 NoneB 0.5 NoneC 2.1 NoneD 1.8 CE 1.1 BF 0.9 A G 2 AH 0.7 FI 0.7 DJ 1.8 H, EK 1.3 JL 1.9 GM 1.1 L, I, Ka. Draw a precedence diagram.b. What cycle time (in minutes) results in the desired outputrate?c. What is the theoretical minimum number of stations?d. Use the longest work element decision rule to balance theline and calculate the efficiency of your solution.e. Use the most followers work element decision rule tobalance the line and calculate the efficiency of yoursolution.
- XYZ is famous for homemade pizzas which are crisp with thin crust and varied toppings giving the pizzas fabulous tastes. XYZ· is revamping its order processing and pizza-making process. In order to deliver fresh pizza fast, six work elements must be completed as shown in the table below :Element Description Precedence Time (in min)A Receive order - 2·0B Shape dough A 1·0C Prepare toppings A 2·0D Assemble pizza B, C 3·0E Bake pizza D 3·0F Deliver pizza E 3·0Construct a precedence diagram for the process.If the demand is 120 pizzas per night (5:00pm to 1:00am), compute the cycle time for the process. Compute the lead time for the process.What is the theoretical minimum number of workstations needed to achieve the required production?How will you balance the production line to produce and deliver 120 pizzas per night? What is the actual minimum number of workstations needed?A furniture factory makes two types of wooden tables,large and small. See the flowchart below.SetupTime,MinutesRun Timeper Piece,MinutesCapacity,Piecesper HourWood cutting 30 5 15Make four legs 60 10 10Make tops 60 12 8Finish the wood 20 8 12Assemble and ship 20 17 14 Small tables are made in batches of 100, and large tables are made in batches of 50. A batch includes a fixed setup time for the entire batch at each process step and a run time for each piece in the batch. Both large and small tables have the same processing times. The capacities of each process step are given, and apply to production of either type of table, as shown in the flowchart.a. What is the capacity of the system, and what is the bottleneck?b. What are the throughput times for batches of large and small tables?c. When producing at a rate of six small tables per hour on average, how many tables will be in the system?I already find a. I need help with b Bill's Barbershop has two barbers available to cut customer's hair. Both barbers provide roughly the same experience and skill, but one is just a little bit slower than the other. The process flow below shows that all customers go through steps B1 and B2 and then can be served at either of the two barbers at step B3. The process ends for all customers at step B4. The numbers in parentheses indicate the minutes it takes that activity to process a customer. b. What single activity is the bottleneck for the entire process? B what?