When expansion fittings are installed in a run of metallic raceway, the electrical continuity and conductivity must be ensured by installing an equipment bonding jumper or through other means. This means is permitted to be either inside or outside of the raceway. a) True b) False

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter7: Symmetrical Faults
Section: Chapter Questions
Problem 7.19MCQ
icon
Related questions
Question

When expansion fittings are installed in a run of metallic raceway, the electrical continuity and conductivity must be ensured by installing an equipment bonding jumper or through other means. This means is permitted to be either inside or outside of the raceway. a) True b) False 

 

 

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning