Degarmo's Materials And Processes In Manufacturing
13th Edition
ISBN: 9781119492825
Author: Black, J. Temple, Kohser, Ronald A., Author.
Publisher: Wiley,
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 1, Problem 1P
- The Toyota truck plant in Indiana produces 150,000 trucks per year. The plant runs one eight�hour shift and makes 400 trucks per day. About 1300 people work on the final assembly line. Each truck has about 20 direct labor hours per car in it.
- Assuming the truck sells for $26,000 and workers earn $50 per hour in wages and benefits, what percentage of the cost of the truck is in direct labor?
- What is the production rate of the final assembly line?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
In a casting machining company, it takes an operator 30 seconds to load ,15 seconds to unload each machining center. There are several same centers, all working on the same type of part, and the duration of the automatic operation is 1 minute. The travel time between machines is 15 seconds. Given that the cost per hour of the operator $8 and the cost per hour of the machine is $10, using the man-machine diagram, determine the value of the highest production rate for the system
In a casting machining company, it takes an operator 15 seconds to load and 15 seconds to unload each machining center. There are several same centers, all working on the same type of part, and the duration of the automatic operation is 1 minute. Given that the cost per hour of the operator and the cost per hour of the machine is $10, using the man-machine diagram, determine the value of the highest production rate for the system.
A CNC milling machine has a purchase price of £120,000 and it is considered from an accounting standpoint to be depreciated to zero value over a period of 5 years. If the machine is to be used for 2 shifts with each shift working for 37 hours/ week and 45 weeks/ year. What is the machine cost/ hr which must be charged in order to amortise/repay the costs over the 5 year period?
To make the calculation simpler, you can assume that over the 5 year period you will be required to pay back 8% interest on the sum borrowed.
Express your answer in § / hour rounded up to the nearest penny
Chapter 1 Solutions
Degarmo's Materials And Processes In Manufacturing
Ch. 1 - What role does manufacturing play relative to the...Ch. 1 - Arent all goods really consumer goods, depending...Ch. 1 - The Subway sandwich shop is an example of a job...Ch. 1 - How does a system differ from a process? From a...Ch. 1 - Is a cutting tool the same thing as a machine...Ch. 1 - What are the major classifications of basic...Ch. 1 - Casting is often used to produce a...Ch. 1 - In the lost�wax casting process, what happens to...Ch. 1 - In making a gold medal, what do we mean by a...Ch. 1 - How is a railroad station like a station on an...
Ch. 1 - Because no work is being done on a part when it is...Ch. 1 - What forming processes are used to make a paper...Ch. 1 - What is tooling in a manufacturing system?Ch. 1 - It is acknowledged that chipâ€�type machining is...Ch. 1 - Compare Figures 1.1 and 1.16. What are the...Ch. 1 - In a modern safety razor with three or four blades...Ch. 1 - List three purposes of packaging operations.Ch. 1 - Assembly is defined as the putting together of...Ch. 1 - What are the physical elements in a manufacturing...Ch. 1 - In the production system, who usually figures out...Ch. 1 - In Figure 1.8, what do the lines connecting the...Ch. 1 - Characterize the process of squeezing toothpaste...Ch. 1 - It has been said that low-cost products are more...Ch. 1 - Prob. 24RQCh. 1 - If the rolls for the cold-rolling mill that...Ch. 1 - Make a list of service systems, giving an example...Ch. 1 - What is the fundamental difference between a...Ch. 1 - Prob. 28RQCh. 1 - What kind of process is powder metallurgy: casting...Ch. 1 - In view of Figure 1.2, who really determines the...Ch. 1 - What costs make up manufacturing cost (sometimes...Ch. 1 - What are major phases of a product life cycle?Ch. 1 - How many different manufacturing systems might be...Ch. 1 - In general, as the annual volume for a product...Ch. 1 - The Toyota truck plant in Indiana produces 150,000...Ch. 1 - A company is considering making automobile bumpers...Ch. 1 - Many companies are critically examining the...Ch. 1 - We can analogize your university to a...Ch. 1 - What kind of manufacturing system (design) is your...Ch. 1 - What are the major process steps in the assembly...Ch. 1 - What is the relationship between Figures 1.2Â...Ch. 1 - Recently, National Geographic magazine asked the...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- Which of the following detail is obtained with bottleneck constrains in the production process? Select one: a. Maximum cycle time b. Minimum product time c. Minimum cycle time d. Maximum product timearrow_forward1. A certain batch of parts is routed through six machines in a batch production plant. The setup and operation times for each machine are given in the table below. Batch size is 200 and the average nonoperation time per machine is15 hr. Determine (a) manufacturing lead time and (b) hourly production rate for operation 4.Machine 1 2 3 4 5 6Setup time (hr) 5 3 6 4 5 3Operation time (min) 3.0 3.3 8.2 3.9 4.5 2.3 a. 6(4.3+200(3.9/60)+15) = 193.8 hours 24.2 days if 8 hour shiftb. 4(60)+200(3.9)/200 =5.1 hourly production for operation 4 2. Suppose the part in the previous problem is made in very large quantities on a production line in which an automated work handling system is used to transfer parts between machines. Transfer time between stations is 30 sec. total time required to setup the entire line is 102 hr. Assume that the operation times at the individual machines remain the same as in the previous problem, Determine (a) manufacturing lead time for a part coming off the line,…arrow_forwardQ2. a. Explain briefly the known criteria upon which the classification of Production Systems are based. b. List and briefly explain all five (5) types of Production Systems.arrow_forward
- Supposes a shoe factory produce both low grade and higher grade shoes. The factory produce at least twice as many low grade as higher grade shoes. The maximum possible production is 500 pairs of shoes. A dealer calls for delivery of at least 100 high grade pairs of shoes per day. Suppose the oppression makes a profit of birr 2.00 per a pair of shoes on high grade shoes and birr 1.00 per pairs of shoes on low grade shoes. How many pairs of shoes of each type should be produce for maximum profit?arrow_forwardWhat are the production equipments of a bread manufacturing plants?arrow_forward11)Q1. How do you evaluate manufacturing process?arrow_forward
- A toy manufacturing uses 51030 rubber wheels per year for its popular dump truck series. The firm makes its own wheels, which it can can produce at a rate of 800 per day. The toy trucks are assembled uniformly ( at a constant rate ) over the entire year. Carrying cost is $ 1.50 per wheel per year. setup cost for the production run of the wheel is $ 47. The firm operatyes 243 days per year. Determine each of the following: 1-Optimal run size 2-Use your final answer from part 1 to determine minimum total annual cost for carrying and setup 3-Cycle time for the optimal run size 4-Run timearrow_forwardA worker is currently responsible for tending two machines in a machine cluster. The service time per machine is 0.35 min and the time to walk between machines is 0.15 min.The machine automatic cycle time is 1.90 min. If the worker’s hourly rate = $12/hr andthe hourly rate for each machine = $18/hr, determine (a) the current hourly rate for thecluster, and (b) the current cost per unit of product, given that two units are produced byeach machine during each machine cycle. (c) What is the percent idle time of the worker?(d) What is the optimum number of machines that should be used in the machine cluster, ifminimum cost per unit of product is the decision criterion?arrow_forwardConsider a line consisting of only one machine. This machine takes on average 4 minutes (te=4 min) to complete a job and Ca2=Ce2=1. The arrival rate of the parts to this machine is 1/8 part/minutes. Assume that there is enough space for only 5 parts between the machines (Hint: the buffer size, b, is 5.) Compute the expected CT of this production line. CT=_________arrow_forward
- There are four distinct categories that can be used to classify production systems. A concise explanation and example are provided for each of these categories in turn.arrow_forwardOperations processes are known to differ in terms of volume of their output. Explain thecharacteristics of high volume operations.arrow_forwardIn a factory where there are three shifts: The machine overhead cost is found to be £8.20 / hr, the labour overhead cost is found to be £30.20/hr, and the premises overhead cost is found to be £3.50/hr. Using the principle of overhead costing: If a single component takes 23 minutes to manufacture on the milling machine. What is the cost / part? You should include machine costs, labour costs and premises costs in your answer, but you can neglect material and energy costs. Express your answer in £ rounded up to the nearest penny.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Elements Of ElectromagneticsMechanical EngineeringISBN:9780190698614Author:Sadiku, Matthew N. O.Publisher:Oxford University PressMechanics of Materials (10th Edition)Mechanical EngineeringISBN:9780134319650Author:Russell C. HibbelerPublisher:PEARSONThermodynamics: An Engineering ApproachMechanical EngineeringISBN:9781259822674Author:Yunus A. Cengel Dr., Michael A. BolesPublisher:McGraw-Hill Education
- Control Systems EngineeringMechanical EngineeringISBN:9781118170519Author:Norman S. NisePublisher:WILEYMechanics of Materials (MindTap Course List)Mechanical EngineeringISBN:9781337093347Author:Barry J. Goodno, James M. GerePublisher:Cengage LearningEngineering Mechanics: StaticsMechanical EngineeringISBN:9781118807330Author:James L. Meriam, L. G. Kraige, J. N. BoltonPublisher:WILEY
Elements Of Electromagnetics
Mechanical Engineering
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Oxford University Press
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:9780134319650
Author:Russell C. Hibbeler
Publisher:PEARSON
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:9781259822674
Author:Yunus A. Cengel Dr., Michael A. Boles
Publisher:McGraw-Hill Education
Control Systems Engineering
Mechanical Engineering
ISBN:9781118170519
Author:Norman S. Nise
Publisher:WILEY
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:9781337093347
Author:Barry J. Goodno, James M. Gere
Publisher:Cengage Learning
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:9781118807330
Author:James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:WILEY
How Shell and Tube Heat Exchangers Work (Engineering); Author: saVRee;https://www.youtube.com/watch?v=OyQ3SaU4KKU;License: Standard Youtube License