ENGINEERING ECONOMY <LL CUSTOM>
ENGINEERING ECONOMY <LL CUSTOM>
8th Edition
ISBN: 9781260503944
Author: Blank
Publisher: MCG CUSTOM
Question
Chapter 1, Problem 7P

(a):

To determine

Code of violation for engineers.

(b):

To determine

Applicability of code of violation for engineers.

(c):

To determine

Suggestion for other options to sue the contractor.

Blurred answer
Students have asked these similar questions
Please answer with very clear solutions with clear steps and explainantion. Please do not answer if you are not confident.
meant by the term equal service alternative?
You work for Bellevue Window Products. While performing an analysis for a new window product, you found a report from last year that provided the following information regarding the manufacture of a similar product: annual production rate = 40,000 units; selling price = $70 per unit; fixed production cost = $240,000 per year; variable production cost = $1,700,000 per year; variable selling expenses = $96,000 per year. As a first-cut, you decide to use this information to estimate (a) the breakeven production rate per year, (b) the company’s profit last year, and(c) the annual production rate that would generate a profit of $1,000,000 per year. What are your estimates? Draw the breakeven diagram and spreadsheet functions necessary to perform the analysis
Knowledge Booster
Similar questions
  • The U.S. Army received two proposals for a turnkey design/build project for barracks for infantry unit soldiers in training. Proposal A involves an off-the-shelf “bare-bones” design and standard grade construction of walls, windows, doors, and other features. With this option, heating and cooling costs will be greater, maintenance costs will be higher, and replacement will occur earlier than proposal B. The initial cost for A will be $750,000. Heating and cooling costs will average $6000 per month with maintenance costs averaging $2000 per month. Minor remodeling will be required in years 5, 10, and 15 at a cost of $150,000 each time in order to render the units usable for 20 years. They will have no salvage value. Proposal B will include tailored design and construction costs of $1.1 million initially with estimated heating and cooling costs of $3000 per month and maintenance costs of $1000 per month. There will be no salvage value at the end of the 20-year life. Which proposal should…
    custom-designed home, FD, the prime contractor, realized he was not going to make the big profit that he had anticipated due to the many unique features of the home for which he had not correctly estimated the cost to the owners. The contract was fixed-price with no more than 10% override on the total cost. As time proceeded, FD took the choices of the owners on appliances, finishing work on the floors and walls, and many other features and purchased look-alike substitutes from questionable-quality, internationallybased manufacturers and vendors. After living in the house for only 3 years, the owners were so disappointed with the quality of work that they decided to bring a law suit against FD and his company for breach of contract. However, they needed sound reasons upon which to base their legal claims against FD, were the case to go to court. One of the owners, being an engineer, decided to consult the Code of Ethics for Engineers to gain insight into what may be substantial…
    An engineer is trying to decide which process to use to reduce sludge volume prior to disposal. Belt filter presses (BFP) will cost $203,000 to buy and $85,000 per year to operate. Belts will be replaced one time per year at a cost of $5500. Centrifuges (Cent) will cost $396,000 to buy and $119,000 per year to operate, but because the centrifuge will produce a thicker “cake”, the sludge hauling cost to the monofill will be $37,000 per year less than for the belt presses. The useful lives are 5 and 10 years for alternatives BFP and Cent, respectively, and the salvage values are assumed to be 10% of the first cost of each process whenever they are closed down or replaced. Use PW evaluation to select the more economical process at an interest rate of 6% per year over (a) the LCM of lives, and (b) a study period of 8 years. Are the decisions the same?
  • What is meant by the term equal service?
    Due to the high crime rate in the city center, the state council in partnership with the police has installed CCTV in several “hotspot” areas. The installation of the CCTV cost USD1000000. The cost of CCTV maintenance in the first year is USD500,000, USD700000 in the second year, USD950000 in the third year, USD990000 in the fourth year and costs are realized at the end of each year. On the other hand, the installation of CCTV will help to reduce crime in that area and is predicted to bring about a benefit of USD2000000 for the first and second year and a benefit of USD 3000000 for the third and fourth year. At the end of the fourth year, the CCTV will be replaced by a new one and it can be resold as second hand for USD200000. Assume the discount rate of 3% is used.  Calculate the present value of net benefits assuming that the benefits are realized at the beginning of each of the three years. Also, draw the timeline of benefits and costs.
    Due to the high crime rate in the city center, the state council in partnership with the police has installed CCTV in several “hotspot” areas. The installation of the CCTV cost USD1000000. The cost of CCTV maintenance in the first year is USD500,000, USD700000 in the second year, USD950000 in the third year, USD990000 in the fourth year and costs are realized at the end of each year. On the other hand, the installation of CCTV will help to reduce crime in that area and is predicted to bring about a benefit of USD2000000 for the first and second year and a benefit of USD 3000000 for the third and fourth year. At the end of the fourth year, the CCTV will be replaced by a new one and it can be resold as second hand for USD200000. Assume the discount rate of 3% is used. Calculate the present value of net benefits assuming that 40% of the benefits are realized at the beginning of the year and the balance at the end of the year.
  • Due to the high crime rate in the city center, the state council in partnership with the police has installed CCTV in several “hotspot” areas. The installation of the CCTV cost USD1000000. The cost of CCTV maintenance in the first year is USD500,000, USD700000 in the second year, USD950000 in the third year, USD990000 in the fourth year and costs are realized at the end of each year. On the other hand, the installation of CCTV will help to reduce crime in that area and is predicted to bring about a benefit of USD2000000 for the first and second year and a benefit of USD 3000000 for the third and fourth year. At the end of the fourth year, the CCTV will be replaced by a new one and it can be resold as second hand for USD200000. Assume the discount rate of 3% is used. Calculate also Year 0 a). Calculate the present value of net benefits assuming the benefits are realized at the end of each of the four years. Also, draw the timeline of benefits and costs. b) Calculate the present value of…
    Due to the high crime rate in the city center, the state council in partnership with the police has installed CCTV in several “hotspot” areas. The installation of the CCTV cost USD1000000. The cost of CCTV maintenance in the first year is USD500,000, USD700000 in the second year, USD950000 in the third year, USD990000 in the fourth year and costs are realized at the end of each year. On the other hand, the installation of CCTV will help to reduce crime in that area and is predicted to bring about a benefit of USD2000000 for the first and second year and a benefit of USD 3000000 for the third and fourth year. At the end of the fourth year, the CCTV will be replaced by a new one and it can be resold as second hand for USD200000. Assume the discount rate of 3% is used. a). Calculate the present value of net benefits assuming the benefits are realized at the end of each of the four years. Also, draw the timeline of benefits and costs.
    FEMA (Federal Emergency Management Agency) has ordered 25 specialized test units capable of field checking 15 separate elements in potable water inemergency situations. Thompson Water Works, Inc., the contractor, took 200hours to build the first unit. If direct and indirect labor costs average $50 perhour, and an 80% learning rate is assumed, estimate (a) the time needed to complete units 5 and 25, and (b) the total labor cost for the 25 units.
    • SEE MORE QUESTIONS
    Recommended textbooks for you
  • ENGR.ECONOMIC ANALYSIS
    Economics
    ISBN:9780190931919
    Author:NEWNAN
    Publisher:Oxford University Press
    Principles of Economics (12th Edition)
    Economics
    ISBN:9780134078779
    Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
    Publisher:PEARSON
    Engineering Economy (17th Edition)
    Economics
    ISBN:9780134870069
    Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
    Publisher:PEARSON
  • Principles of Economics (MindTap Course List)
    Economics
    ISBN:9781305585126
    Author:N. Gregory Mankiw
    Publisher:Cengage Learning
    Managerial Economics: A Problem Solving Approach
    Economics
    ISBN:9781337106665
    Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
    Publisher:Cengage Learning
    Managerial Economics & Business Strategy (Mcgraw-...
    Economics
    ISBN:9781259290619
    Author:Michael Baye, Jeff Prince
    Publisher:McGraw-Hill Education
  • ENGR.ECONOMIC ANALYSIS
    Economics
    ISBN:9780190931919
    Author:NEWNAN
    Publisher:Oxford University Press
    Principles of Economics (12th Edition)
    Economics
    ISBN:9780134078779
    Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
    Publisher:PEARSON
    Engineering Economy (17th Edition)
    Economics
    ISBN:9780134870069
    Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
    Publisher:PEARSON
    Principles of Economics (MindTap Course List)
    Economics
    ISBN:9781305585126
    Author:N. Gregory Mankiw
    Publisher:Cengage Learning
    Managerial Economics: A Problem Solving Approach
    Economics
    ISBN:9781337106665
    Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
    Publisher:Cengage Learning
    Managerial Economics & Business Strategy (Mcgraw-...
    Economics
    ISBN:9781259290619
    Author:Michael Baye, Jeff Prince
    Publisher:McGraw-Hill Education