Factory overhead rate
Fabricator Inc., a specialized equipment manufacturer, uses a job order cost system. The overhead is allocated to jobs on the basis of direct labor hours. The overhead rate is now $3,000 per direct labor hour. The design engineer thinks that this is illogical. The design engineer has stated the following:
Our accounting system doesn't make any sense to me. It tells me that every labor hour carries an additional burden of $3,000. This means that while direct labor makes up only 5% of our total product cost, it drives all our costs. In addition, these rates give my design engineers incentives to "design out" direct labor by using machine technology. Yet, over the past years as we have had less and less direct labor, the overhead rate keeps going up and up. I won't be surprised if next year the rate is $4,000 per direct labor hour. I'm also concerned because small errors in our estimates of the direct labor content can have a large impact on our estimated costs. Just a 30~minute error in our estimate of assembly time is worth $ 1,500. Small mistakes in our direct labor time estimates really swing our bids around. I think this puts us at a disadvantage when we are going after business.

What did the engineer mean about the large overhead rate being a disadvantage when plating bids and seeking new business?

Blurred answer

Chapter 10 Solutions

Survey of Accounting (Accounting I)

Ch. 10 - Prob. 6CDQCh. 10 - Prob. 7CDQCh. 10 - Describe the Source 01 the data for increasing...Ch. 10 - Prob. 9CDQCh. 10 - a.How is a predetermined factory overhead rate...Ch. 10 - a.What is (1) overapplied factory overhead and (2)...Ch. 10 - At the end of the fiscal year, there s a...Ch. 10 - What is the difference between a product cost and...Ch. 10 - Prob. 14CDQCh. 10 - Prob. 15CDQCh. 10 - How can activity based costing be used in service...Ch. 10 - Classifying costs as materials, labor, or factory...Ch. 10 - Classifying costs as materials, labor, or factory...Ch. 10 - Classifying costs as factory overhead Which of the...Ch. 10 - Classifying costs as product or period costs For...Ch. 10 - Prob. 10.5ECh. 10 - Transactions in a job order cost system Five...Ch. 10 - Cost flow relationships The following information...Ch. 10 - Cost of materials issuances An incomplete...Ch. 10 - Recording issuing of materials Materials issued...Ch. 10 - Amounts for materials Big Timber Furniture Company...Ch. 10 - Prob. 10.11ECh. 10 - Recording factory labor costs The weekly time...Ch. 10 - Recording direct labor and factory overhead...Ch. 10 - Factory overhead rates and account balances...Ch. 10 - Predetermined factory overhead rate Novus Engine...Ch. 10 - Predetermined factory overhead rate Mt Ellis...Ch. 10 - Recording jobs completed The following account...Ch. 10 - Determining manufacturing costs Wagner Printing...Ch. 10 - Financial statements of a manufacturing firm The...Ch. 10 - Job order cost accounting entries for a service...Ch. 10 - Prob. 10.21ECh. 10 - Prob. 10.22ECh. 10 - Just-in-time principles Jupiter Shirt Company...Ch. 10 - Activity-based costing for a hospital Deer Lodge...Ch. 10 - Activity-based costing in an insurance company...Ch. 10 - Classifying costs The following is a list of costs...Ch. 10 - Schedules for unfinished jobs and completed jobs...Ch. 10 - Schedules for unfinished jobs and completed jobs...Ch. 10 - Schedules for unfinished jobs and completed jobs...Ch. 10 - Schedules for unfinished jobs and completed jobs...Ch. 10 - Schedules for unfinished jobs and completed jobs...Ch. 10 - Schedules for unfinished jobs and completed jobs...Ch. 10 - Job cost sheet Hallmark Furniture Company...Ch. 10 - Job cost sheet Hallmark Furniture Company...Ch. 10 - Analyzing manufacturing cost accounts Summer...Ch. 10 - Analyzing manufacturing cost accounts Summer...Ch. 10 - Flow of costs and income statement R-Tunes Inc. is...Ch. 10 - Flow of costs and income statement R-Tunes Inc. is...Ch. 10 - Unit cost analysis The management of Colfax...Ch. 10 - Prob. 10.2MBACh. 10 - Prob. 10.3MBACh. 10 - Prob. 10.4MBACh. 10 - Prob. 10.1CCh. 10 - Prob. 10.2CCh. 10 - Prob. 10.3.1CCh. 10 - Classifying costs Reboot Inc. provides computer...Ch. 10 - Prob. 10.4.1CCh. 10 - Factory overhead rate Fabricator Inc., a...Ch. 10 - Factory overhead rate Fabricator Inc., a...Ch. 10 - Prob. 10.5CCh. 10 - Just-in-time principles Warm Space Inc....
Knowledge Booster
Accounting
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.
Similar questions
  • Pocono Cement Forms expects $900,000 in overhead during the next year. It does not know whether it should apply overhead on the basis of its anticipated direct labor hours of 60,000 or its expected machine hours of 30,000. Determine the product cost under each predetermined allocation rate if the last job incurred $1,550 in direct material cost, 90 direct labor hours, and 75 machine hours. Wages are paid at $16 per hour.
    Nutts management is very concerned about the cost of overhead on its jobs. When jobs are complete, overhead costs should be between 15% and 20% of total costs. For example, the labor cost on Job 8958 is 25% of total costs, higher than the norm. Open Job 8961 and click the Chart sheet tab. A pie chart appears showing the cost components on that job. Record the labor cost percentage in the space provided. Repeat this for each of the jobs worked on in August. Did Nutt maintain good cost control on all its jobs? Explain. Worksheet. During September, Job 8963 required two additional material requisitions to complete the job. Open JOB8963 and modify the job cost sheet to include an area for four direct material requisition entries instead of three. Then enter the following two materials requisitions onto the worksheet: Preview the printout to make sure it will print neatly on one page, and then print the worksheet. Save the completed worksheet as JOBT. Chart. Open JOB8964 and click the Chart sheet tab. Prepare a bar chart for JOB8964 showing the amount of material, labor, and overhead required to complete the job. Use the Chart Data Table found in rows 4246 as a basis for preparing the chart. Enter your name somewhere on the chart. Save the file again as J0B8964. Print the chart.
    York Company Is a machine shop that estimated overhead will be $50,000, consisting of 5,000 hours of direct labor. The cost to make job 0325 is $70 in aluminum and two hours of labor at $20 per hour. During the month. York incurs $50 in indirect material cost. $150 in administrative labor, $300 in utilities, and $250 in depreciation expense. What is the predetermined overhead rate if direct labor hours are considered the cost driver? What is the cost of Job 0325? What is the overhead incurred during the month?
  • Green Bay Cheese Company estimates its overhead to be $375,000. It expects to have 125,000 direct labor hours costing $1,500,000 in labor and utilizing 15,000 machine hours. Calculate the predetermined overhead rate using: A. Direct labor hours B. Direct labor dollars C. Machine hours
    Compute the total job cost for each of the following scenarios: a. If the direct labor cost method is used in applying factory overhead and the predetermined rate is 100%, what amount should be charged to Job 2010 for factory overhead? Assume that direct materials used totaled 5,000 and that the direct labor cost totaled 3,200. b. If the direct labor hour method is used in applying factory overhead and the predetermined rate is 10 an hour, what amount should be charged to Job 2010 for factory overhead? Assume that the direct materials used totaled 5,000, the direct labor cost totaled 3,200, and the number of direct labor hours totaled 250. c. If the machine hour method is used in applying factory overhead and the predetermined rate is 12.50 an hour, what amount should be charged to Job 2010 for factory overhead? Assume that the direct materials used totaled 5,000, the direct labor cost totaled 3,200, the direct labor hours were 250 hours, and the machine hours were 295 hours.
    Darnell Poston, owner of Poston Manufacturing, Inc., wants to determine the cost behavior of labor and overhead. Darnell pays his workers a salary; during busy times, everyone works to get the orders out. Temps (temporary workers hired through an agency) may be hired to pack and prepare completed orders for shipment. During slower times, Darnell catches up on bookkeeping and administrative tasks while the salaried workers do preventive maintenance, clean the lines and building, etc. Temps are not hired during slow times. Darnell found that workers salaries, temp agency payments, rentals, utilities, and plant and equipment depreciation are the largest dollar accounts. He believes that workers salaries and plant and equipment depreciation are fixed, temp agency payments are associated with the number of orders (since temp workers are used to pack and prepare completed orders for shipment), and electricity is associated with the number of machine hours. When the number of different parts stored by Poston exceeds the space in the materials storeroom, Darnell rents nearby warehouse space. He can rent as much or as little space as he wants on a month-to-month basis. Therefore, he believes warehouse rental payments are variable with the number of parts purchased and stored. The account balances for the past six months as well as the six-month total are as follows: Information on number of machine hours, orders, and parts for the six-month period follows: Required: 1. Calculate the monthly average account balance for each account. Calculate the average monthly amount for each of the three drivers. 2. Calculate fixed monthly cost and the variable rates for temp agency payments, warehouse rent, and electricity. Express the results in the form of an equation for total cost. 3. In July, Darnell predicts there will be 420 orders, 250 parts, and 5,900 machine hours. What is the total labor and overhead cost for July? 4. What if Darnell buys a new machine in July for 24,000? The machine is expected to last 10 years and will have no salvage value at the end of that time. What part of the cost equation will be affected? How? What is the new expected cost in July?
  • San Mateo Optics, Inc., specializes in manufacturing lenses for large telescopes and cameras used in space exploration. As the specifications for the lenses are determined by the customer and vary considerably, the company uses a job-order costing system. Manufacturing overhead is applied to jobs on the basis of direct labor hours, utilizing the absorption- or full-costing method. San Mateos predetermined overhead rates for 20x1 and 20x2 were based on the following estimates. Jim Cimino, San Mateos controller, would like to use variable (direct) costing for internal reporting purposes as he believes statements prepared using variable costing are more appropriate for making product decisions. In order to explain the benefits of variable costing to the other members of San Mateos management team, Cimino plans to convert the companys income statement from absorption costing to variable costing. He has gathered the following information for this purpose, along with a copy of San Mateos 20x1 and 20x2 comparative income statement. San Mateo Optics, Inc. Comparative Income Statement For the Years 20x1 and 20x2 San Mateos actual manufacturing data for the two years are as follows: The companys actual inventory balances were as follows: For both years, all administrative expenses were fixed, while a portion of the selling expenses resulting from an 8 percent commission on net sales was variable. San Mateo reports any over-or underapplied overhead as an adjustment to the cost of goods sold. Required: 1. For the year ended December 31, 20x2, prepare the revised income statement for San Mateo Optics, Inc., utilizing the variable-costing method. Be sure to include the contribution margin on the revised income statement. 2. Describe two advantages of using variable costing rather than absorption costing. (CMA adapted)
    CleanCom Company specializes in cleaning commercial buildings and construction sites. Each building and site is different, requiring amounts and types of supplies and labor for each job. CleanCom estimated the following for the year: During the year, the following actual amounts were experienced: If CleanCom uses a normal costing system and overhead is applied on the basis of direct labor hours, what is the cost of cleaning a construction site that takes 140 of direct materials and 21 direct labor hours? a. 455 b. 508 c. 648 d. 644
    If a company bases its predetermined overhead rate on 100,000 machine hours, and It actually has 100,000 machine hours, would there be an under applied or over applied overhead?
    • SEE MORE QUESTIONS
    Recommended textbooks for you
  • Survey of Accounting (Accounting I)
    Accounting
    ISBN:9781305961883
    Author:Carl Warren
    Publisher:Cengage Learning
    Managerial Accounting
    Accounting
    ISBN:9781337912020
    Author:Carl Warren, Ph.d. Cma William B. Tayler
    Publisher:South-Western College Pub
    Cornerstones of Cost Management (Cornerstones Ser...
    Accounting
    ISBN:9781305970663
    Author:Don R. Hansen, Maryanne M. Mowen
    Publisher:Cengage Learning
  • Principles of Accounting Volume 2
    Accounting
    ISBN:9781947172609
    Author:OpenStax
    Publisher:OpenStax College
    Principles of Cost Accounting
    Accounting
    ISBN:9781305087408
    Author:Edward J. Vanderbeck, Maria R. Mitchell
    Publisher:Cengage Learning
    Excel Applications for Accounting Principles
    Accounting
    ISBN:9781111581565
    Author:Gaylord N. Smith
    Publisher:Cengage Learning
  • Survey of Accounting (Accounting I)
    Accounting
    ISBN:9781305961883
    Author:Carl Warren
    Publisher:Cengage Learning
    Managerial Accounting
    Accounting
    ISBN:9781337912020
    Author:Carl Warren, Ph.d. Cma William B. Tayler
    Publisher:South-Western College Pub
    Cornerstones of Cost Management (Cornerstones Ser...
    Accounting
    ISBN:9781305970663
    Author:Don R. Hansen, Maryanne M. Mowen
    Publisher:Cengage Learning
    Principles of Accounting Volume 2
    Accounting
    ISBN:9781947172609
    Author:OpenStax
    Publisher:OpenStax College
    Principles of Cost Accounting
    Accounting
    ISBN:9781305087408
    Author:Edward J. Vanderbeck, Maria R. Mitchell
    Publisher:Cengage Learning
    Excel Applications for Accounting Principles
    Accounting
    ISBN:9781111581565
    Author:Gaylord N. Smith
    Publisher:Cengage Learning
    Cost Accounting - Definition, Purpose, Types, How it Works?; Author: WallStreetMojo;https://www.youtube.com/watch?v=AwrwUf8vYEY;License: Standard YouTube License, CC-BY