Factory overhead rate
Fabricator Inc., a specialized equipment manufacturer, uses a job order cost system. The overhead is allocated to jobs on the basis of direct labor hours. The overhead rate is now $3,000 per direct labor hour. The design engineer thinks that this is illogical. The design engineer has stated the following:
Our accounting system doesn't make any sense to me. It tells me that every labor hour carries an additional burden of $3,000. This means that while direct labor makes up only 5% of our total product cost, it drives all our costs. In addition, these rates give my design engineers incentives to "design out" direct labor by using machine technology. Yet, over the past years as we have had less and less direct labor, the overhead rate keeps going up and up. I won't be surprised if next year the rate is $4,000 per direct labor hour. I'm also concerned because small errors in our estimates of the direct labor content can have a large impact on our estimated costs. Just a 30~minute error in our estimate of assembly time is worth $ 1,500. Small mistakes in our direct labor time estimates really swing our bids around. I think this puts us at a disadvantage when we are going after business.

What did the engineer mean about the large overhead rate being a disadvantage when plating bids and seeking new business?

To determine

Concept Introduction:

Predetermined overhead allocation:

Manufacturing overhead cost is the pool of all indirect costs incurred for the production. These are the costs which are not directly traceable to the product. Manufacturing costs include indirect material indirect labor and overheads. These costs are allocated to the products using the predetermined overhead allocation rate. The formula of predetermined overhead allocation rate is as follows:

  Predetermined overhead allocation rate = Estimated Manufacturing overhead CostAllocation base 

To Indicate:

The disadvantage of the large overhead rate for bids and new business

Explanation

Manufacturing overhead cost is the pool of all indirect costs incurred for the production. These are the costs which are not directly traceable to the product. Manufacturing costs include indirect material indirect labor and overheads. These costs are allocated to the products using the predetermined overhead allocation rate.

The overhead rate is being calculated as a basis of direct labor hours, if th...

Still sussing out bartleby?

Check out a sample textbook solution.

See a sample solution

The Solution to Your Study Problems

Bartleby provides explanations to thousands of textbook problems written by our experts, many with advanced degrees!

Get Started

Additional Business Solutions

Find more solutions based on key concepts

Show solutions add

MATURITY RISK PREMIUM An investor in Treasury securities expects inflation to be 2.5% in Year 1,3.2% in Year 2,...

Fundamentals of Financial Management, Concise Edition (with Thomson ONE - Business School Edition, 1 term (6 months) Printed Access Card) (MindTap Course List)

What are the two main causes of market failure? Give an example of each.

Principles of Microeconomics (MindTap Course List)

Why do people enter into exchanges?

Economics (MindTap Course List)