WATER RESOURCES ENGINEERING
3rd Edition
ISBN: 9781119490579
Author: Mays
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 19, Problem 19.4.2P
To determine
The return period that maximizes the expected annual net benefits.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
a) Define duty and derive the relationship between delta and duty?
b) What are the factors affecting duty?
Subject: irrigation engineering.
An unlined canal giving a seepage loss of 3.3 cumecs per million sqmetres of wetted area is proposed to be lined with 10 cm thick cement concrete lining, which costs Rs. 180 per 10 sq. metre. Given the following data, work out the economics of lining and benefit cost ratio.
Annual revenue per cumec of water from all crops Discharge in the Channel
Area of the channel
Wetted perimeter of the channel
Wetted perimeter of the lining
Annual maintenance cost of unlined channel per 10 sq. m Assumed additional suitable data, if required.
= 3.5 lacs
= 83.5 cumecs = 40.8 sq. meter = 18.8 meter
= 18.5 meter
= 1 Rs.
List seven major factors that determine a watershed’s response to a given rainfall. Explain the corresponding response for each factor.
Chapter 19 Solutions
WATER RESOURCES ENGINEERING
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- You as a novice EIT wishes to design a small dam to provide flood protection to a community from flood events whose return period is 50 years. Compute the risk that you are willing to accept for the excepted flood event to occur in the next 2 years?arrow_forwardAnnual maximum streamflow at a gage follows a log-normal distribution with a mean of 7000 m3 s-1 and a variance of 1.44x107 m3 s-1. What is the probability in each year that a flood magnitude would exceed 1,100 m3 s-1?arrow_forwardStructural flood measures: 1. Are Best under all circumstances, simply because they control the peak and volume of hydrographs 2. Consist of levees, diversion works, retention basins, and land use zoning methods 3. Are the preferred approaches to combat climate change 4. May spur investment on floodplains, but can result in greater losses, were they to fail A) 2 Only B) 4 Only C) 2 and 4 Only D) 1 and 4 Onlyarrow_forward
- What is the ultimate BOD 24 km downstream from the outfall? > Answer: 3.89 g/m3 What is the DO deficit 24 km downstream of the effluent discharge? > Answer: 3.192 g/m3 Question: Is it possible to reduce the BOD of the effluent to maintain the DO above 7.0 mg/L at all downstream locations along the river? If so, what is the target BOD of the effluent?arrow_forwardThe average annual flood flow rates measured in a river is 800 m3/s, and the standard deviation is 400 m3/s. The probability distribution of the flood discharges conforms to the GUMBEL distribution.a) How many years is the return interval of 1300 m3/s, the largest observed flow rate, according to the GUMBEL distribution?b) Calculate the value of the 25-year flood flow. Thank you indeed for solving these question.arrow_forwardWhat are the advantages and disadvantages are associated with the construction, function, and operation of dams built of different materials?arrow_forward
- If a 1.0 m3/s flow wastewater treatment plant uses 4 parallel sedimentation basins with an overflow rate of 36 m3 /m2.d, what should be the surface area of each tank (m2)?arrow_forwardWhat are three issues associated with irrigation, including whether current rates of aquifer use are sustainable?arrow_forward[CE Hydraulics] 1. State the main criteria in the design of closed conduits. Do the conservation laws apply?arrow_forward
- The hydraulic and cost engineers of a water-related project proposal of ABC Construction is trying to agree on which two different sizes of pipe for a new water main. A 300- mm line will have an initial cost of Php1,250,000, whereas a 450-mm line will cost Php1,750,000. Since there is more head loss through the 300-mm pipe, the pumping cost is expected to bePhp 3000 more per year than for the 300-mm line. If the lines are expected to last for 30 years,which size should be selected on the basis of aA. present worth analysisB. future worth analysisusing an interest rate of 10% per year?arrow_forwarda) Outline the principles behind how the conjuctive use of surface water resources together with groundwater resources can be achieved. b) Explain why conjuctive use can lead to more effecience management of water resources than can be achieved if the two resources are managed individually.arrow_forwardWhat is the exceedance probability of a 500-year rainfall event?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning