Solid Waste Engineering
3rd Edition
ISBN: 9781305635203
Author: Worrell, William A.
Publisher: Cengage Learning,
expand_more
expand_more
format_list_bulleted
Question
Chapter 3, Problem 3.8P
To determine
The collection route for the street.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Determine a suitable volume (dimensions) for coagulation basin for a flow of 1350 m3/hr, if t= 40 sec. (use circular tank). 1 A B I = &= % & [
ENVIROMENTAL ENGINEERING:
A water treatment plant was designed to a treat waste water at a flow rate of 1 m3/s. It consisted of 14 sand filters having surface area of 50 m2 each. Determine the loading rate of the plant (in m3/day.m2) if two filters are out of service.
given the following data of cut and fill, compute the free haul distance, overhaul distance, waste and borrow volume. having the values of:
Cost of overhaul: 3000 ID/station
Cost of free haul: 5000 ID/cu.m
Cost of borrow: 15000 ID/cu.m
Free haul distance (F.H.D.): 300m = 2 stations
Cost of waste=5000 ID/cu.m
economic overhaul distance=5 stations
limit of economic haul=8 stations
Knowledge Booster
Similar questions
- Plz, solve this problem. Environmental Engineering-2 Evaluate the size and slope of a sanitary trunk sewer serving a population of 0.4 million. Water consumption is estimated to be 300 lpcd?arrow_forwardStreet is 1000 foot long and homes are 50 feet apart on both sides of the road. Two person crew are employed to collect the recyclables in green roll out containers. It takes 30 seconds to empty the contents to each green container into the truck and set out amount of 12 kgs . Estimate the total time to collect recyclables.arrow_forwardAssume that the contaminated water is to be used for drinking. Using principles of hydraulics, calculate the diameter of a cast iron pipe needed to obtain steady uniform gravity flow of about 0.04 m3/sec given a grading of 0.5% slope.arrow_forward
- Determine the breakeven travel time to the nearest 0.1 hours for the following conditions: Vehicle 1: Direct Haul Operating Cost = $69/hour; Vehicle Capacity = 6.47 tons Vehicle 2: Transfer Station Cost = $6.3/ton; Trailer Operating cost = $240/hour; Trailer Capacity = 30 tonsarrow_forwardA community of 100,000 people wants to initiate public garbage collection and disposal to a landfill that is 30 miles away. The collection frequency is once a week. For garbage transportation to the landfill, there are two options: no transfer station and a transfer station that is 10 miles away from the community and is on the way to the landfill. Determine: Total transportation cost for the no transfer station option. Total transportation cost for the transfer station option. Breakeven point (for the two options), if the transfer station can be placed anywhere on the way to the landfill. Your answer must be in term of distance between the station and the community. Assumptions/given information: Generation rate: 4 lbs/person/day. As collected density: 200 lb/yd3. Collection truck size of 20 yd3 with a compaction ratio of 3. Transfer truck/trailer size of 60 yd3 with no compaction capability. Costs: 30 cents per mile per collection truck, 10 cents per mile per transfer…arrow_forward1.) What is runoff? What is the importance of determining runoff volume?arrow_forward
- If in the project in question 1 the public agency, instead of building the pump station, decides to reroute the pipeline, but still run it between points A and B, may this be done with a change order?arrow_forwardQ#4: Draw a neat sketch (hand sketch) of a sewage pumping station and label its parts. Also explain with reference to your locality that under what circumstances, pumping station will be required in your locality?arrow_forwardThe total Average Day Demand in a Development is 52,000gals, Determine the required volume of water tank in cubic meters per second if the criteria is said to be: a) 20% of the ADD plus Fire Storage if Fire flow is 350gpm for 30 minutes of Operation b) 1 day reserve c) 2 day reservearrow_forward
- A wastewater treatment plant is being designed for a small, growing community. Average flow to a wastewater treatment plant is 4.0 MGD (million gallons per day) with peak flow 50% greater than the average. They expect to use two mechanically-cleaned bar screens so that if one is down for maintenance or a problem there will still be screening available. Determine the minimum wetted area (in ft2) for each bar screen assuming the minimum approach velocity is 2ft/s.arrow_forwardPlz, solve this problem by using the table. Transportation Engineering-2arrow_forwardBecause of a difference of opinion among city staff members, you have been retained as an outside consultant to evaluate the collection operation of the city of Davis Ville. The basic question centers around the amount of time spent on off-route activities by the collectors. The collectors say that they spend less than 15 percent of each 8-h workday on off-route activities; management claims that the amount of time spent is more than 15 percent. You are given the following information that has been verified by both the collectors and management: (a) A hauled container system, without container exchange, is used. occur. (b) The average time spent driving from yard to the first container is 20 min, and no off-route activities. (c) The average pickup time per container is 6 min. (d) The average time to drive between containers is 6 min. (e) The average time required to empty the container at the disposal site is 6 min. (f) The average round-trip distance to the disposal site is 10…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning