PRODUCTION SCHEDULING Ace Novelty manufactures Giant Pandas and Saint Bernards. Each Panda requires
Want to see the full answer?
Check out a sample textbook solutionChapter 3 Solutions
Bundle: Finite Mathematics For The Managerial, Life, And Social Sciences, 12th + Student Solutions Manual
- When the length of each edge of a cube is increased by 1 cm, the volume is increase by 61 cm3. What is the length of each edge of the original cube?arrow_forwardFind the length of a diagonal of a square whose side is 4 in. long.arrow_forwardMary Frances has a rectangular garden plot that encloses an area of 48 yd2. If 28 yd of fencing are purchased to enclose the garden, what are the dimensions of the rectangular plot?arrow_forward
- If during the following year it is predicted that each comedy skit will generate 30 thousand and each musical number 20 thousand, find the maximum income for the year. A television program director must schedule comedy skits and musical numbers for prime-time variety shows. Each comedy skit requires 2 hours of rehearsal time, costs 3000, and brings in 20,000 from the shows sponsors. Each musical number requires 1 hour of rehearsal time, costs 6000, and generates 12,000. If 250 hours are available for rehearsal and 600,000 is budgeted for comedy and music, how many segments of each type should be produced to maximize income? Find the maximum income.arrow_forwardA diesel engine uses Type A filter and high-grade lubricating oil costing P5.50 per liter. With this filter, the oil and the filter have to be changed every 500 hours of operation, and 5 liters of coil have to be added every 100 hours. This filter costs P148 a piece. Eighty liters of coil fill the engine. Another type, filter B, costing P120 may be used with a lower grade of oil costing P4.80 per liter. However, if this filter is used, the oil and filter have to be changed every 300 hours, and 10 liters are added after each 150 hours the engine is used. Which type of filter and oil would you recommend?arrow_forwardThe amount of nitrogen (in lb/acre), phosphate (in lb/acre), and labor (in hr/acre) needed to grow honeydews, yellow onjons, and lettuce is given by the table to the right. Complete parts a and b. OA. Yes, the farmer should allot B. No, it is not possible to use all resources completely. acres for honeydew, for yellow onions, and acres for lettuce. Honeydews 120 Nitrogen Phosphate 180 Labor 5 a) If the farmer has 230 acres, 30,300 lb of nitrogen, 34,400 lb of phosphate, and 400 hours of labor, is it possible to use all resources completely? If so, how many acres should he allot for each crop? Select the correct choice below and, if necessary, fill in the answer box to complete your choice. ⒸA. Yes, the farmer should allot acres for honeydew, OB. No, it is not possible to use all resources completely. Yellow onions 150 acres for lettuce. 80 6 Lettuce b) Suppose everything is the same as in part a, except that 1180 hours of labor are available. Is it possible to use all resources…arrow_forward
- The Flustard is an animal that eats three foods: squerps, fleebs, and blurds. A squerp costs $8 and provides 8 mg (milligrams) of mertle, 9 mg of perkle, and 20 mg of kerple. A fleeb costs $7 and provides 9 mg of mertle, 26 mg of perkle, and 7 mg of kerple. A blurd costs $4 and provides 7 mg of mertle, 6 mg of perkle, and 10 mg of kerple. The Flustard needs at least 0.6 g (grams) of mertle, 1.9 g of perkle, and 1.4 g of kerple every day to live. What's the cheapest way to feed your pet Flustard for one day? Use the variables # squerps = # fleebs = # blurds. %3Darrow_forwardA community playhouse needs to determine the lowest-cost production budget for an upcoming show. They have to determine which set pieces to construction and which to rent. The organization has only two weeks to construct the set. The theater has two carpenters who work up to 12 hours a week, each at $10 an hour. Additionally, the theater has a scenic artist who can work 15 hours per week to paint as needed at $14 per hour. The set needs 20 flats (walls), two hanging drops, and three wooden tables (props). The number of hours required for each piece for carpentry and painting is shown below. Flats, hanging drops, and props can also be rented at a cost of $75, $500, and $400 each, respectively. How many of each unit should be built by the theater and how many should be rented to minimize total cost? E Click the icon to view the table of carpentry and painting hours. The optimal integer solution is to build flat(s) and rent flat(s); build hanging drop(s) and rent hanging drop(s); build…arrow_forwardHermey and the Abominable Snowmonster want to wrap presents in the same size box for all 25,508 elves at the North Pole (no overlapping edges). The top and bottom of each box is 8 inches by 3 inches, the sides are both 3 inches by 2 inches, and the front and back are 8 inches by 2 inches. Wrapping paper from Walmart comes in a roll covering 1,822 square inches and costs $1.52 per roll. Wrapping paper from Hallmark comes in a roll covering 3,188.5 square inches and costs $2.59 per roll. If the two of them want to choose the wrapping paper that costs the least amount, how much will they spend on wrapping paper? Enter your answerarrow_forward
- A company makes three components for sale. The components are processed on two machines: a shaper and a grinder. The time required. (in minutes) on each machine are as follows: Component Shaper Time Grinder Time A 6 4 B 4 5 C 4 2 The shaper is available for 7200 min. and grinder for 6600 min. No more than 200 units of component C can be sold, but up to 1000 units of each of the other components can be sold. In fact the company has orders for 600 units of component A that must be satisfied. The profit contributions for components A, B and C are $8, $6 and $9 respectively. Formulate the problem for deciding the production quantities. Solve the problem using Excel Solver. Run the sensitivity analysis report in Excel Solver. What are the objective coefficient ranges (Range of Optimality) for each coefficient. Interpret these. What are the dual prices for each constraint? Interpret these. What are the right-hand side ranges (Range of Feasibility)? Interpret them. If more time is…arrow_forwardScenario 2: In the bathroom, the homeowners wish to install subway tile around the tub. The tile will be placed above the tub on the three sides that are enclosed. The bathroom has a 9-foot ceiling height and the tub is 60 inches long by 32 inches wide by 19 inches high. The tile the homeowners have selected is 3 inches by 12 inches and is sold by the box. Each box costs $34.99 and contains 22 tiles. The supplier provides free delivery and recommends purchasing a minimum of 10% overage. Question 6: Find the total cost for the tile, including sales tax.arrow_forwardA solar power field is located on the south bank of a straight river that is 2 km wide. A power line is to be constructed from the solar field to an electric substation located on the north bank of the river 4 km east of the solar field. The cost of running the power line is $100,000/km overland and $200,000/km under the river. To minimize the cost of the power line, how much of the power line should be run overland?arrow_forward
- College Algebra (MindTap Course List)AlgebraISBN:9781305652231Author:R. David Gustafson, Jeff HughesPublisher:Cengage LearningElementary Geometry For College Students, 7eGeometryISBN:9781337614085Author:Alexander, Daniel C.; Koeberlein, Geralyn M.Publisher:Cengage,Algebra: Structure And Method, Book 1AlgebraISBN:9780395977224Author:Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. ColePublisher:McDougal Littell
- Holt Mcdougal Larson Pre-algebra: Student Edition...AlgebraISBN:9780547587776Author:HOLT MCDOUGALPublisher:HOLT MCDOUGALAlgebra & Trigonometry with Analytic GeometryAlgebraISBN:9781133382119Author:SwokowskiPublisher:Cengage