Solid Waste Engineering
3rd Edition
ISBN: 9781305635203
Author: Worrell, William A.
Publisher: Cengage Learning,
expand_more
expand_more
format_list_bulleted
Question
Chapter 4, Problem 4.14P
To determine
Power required by the shredder using bond work index method
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Calculate the velocity gradient in a rapid mixer (coagulation), where the power input to the propeller is 0.5 kW, the plant provides water for 16000 people with average consumption of 160 L/person/day, retention time in rapid mixer is 26 s and water temperature is 20 oC. The dynamic viscosity at 20oC is 1x10-3 Pa/s. Debate the G value and if out of the range what steps to take bring G in the correct range
Explain what is setting time, slump value and workability of conrcete having
Plasticiser
Superplasticizer
Hyper plasticizer
A box measuring 50 cm x 50 cm x 50 cm is filled to the top with dry coarse aggregate of mass 187.5 kg. The water absorption and specific gravity of the aggregate are 0.5% and 2.5, respectively. The maximum quantity of water (in kg, round off to 2 decimal places) required to fill the box completely is bris
Knowledge Booster
Similar questions
- Two materials, A and B, are to be separated using two unit operations, 1 and 2. The feed has 10 tons/h A and 4 tons/h B. The split (fraction of material rejected by each operation) is given in Table P5-14. a. Which sequence of operations, (l?2) or (2?1), will yield the greatest recovery of material A? b. What will be the purity of material A using that sequence? c. What will be the efficiency of separation for the entire process train with regard to material A using the Worrell-Stesed equation?arrow_forwardAn aggregate sample was collected in a container and weighed as 528.7 g. The sample was oven dried and theoven dry weight was measured as 506.4 g. If the empty weight of the container was 79.6 g, determine the MC of theaggregatesarrow_forwardA 5-m self-propelled combine makes an average stop of 4 min every time its 2-ton grain tank is to be unloaded. Gross yield of the 20-ha field is 42 tons. The operating speed is 4.8 kph. The time for turning on the headland at the ends of the 500-m field is 15 seconds.Find the field efficiency:a. 78% b. 83%c. 87% d. 90%arrow_forward
- What is turbidity, what causes it, how is it treated why it is undesirable in drinking water. Describe processes in water treatment? Calculate the velocity gradient in a rapid mixer (coagulation), where the power input to the propeller is 0.5 kW, the plant provides water for 13000 people with average consumption of 130 L/person/day, retention time in rapid mixer is 23 s and water temperature is 20 oC. The dynamic viscosity at 20oC is 1x10-3 Pa/s. Debate the G value and if out of the range what steps to take bring G in the correct rangearrow_forwardHammer crusher crushes 7.2 tons of aggregate in 1 hour. Find the capacity and kW of the hammer crusher?arrow_forwardA trapezoidal gutter is to be made from a tin by bending up the edges. If the tin has a width of 12 inches and to be folded into three equal parts, find the width across the top gives the maximum carrying capacity. Show detailed solution. (Draw the illustration of the given problem)arrow_forward
- The following data resulted from a study taken on a horizontal milling machine: Pieces produced per cycle: 8. Average measured cycle time: 8.36 minutes. Average measured effort time per cycle: 4.62 minutes . Average rapid traverse time: 0.08 minutes. Average cutting time power feed: 3.66 minutes. Performance rating: 115 percent. Allowance (machine time): 10 percent . Allowance (manual time): 15 percent. The operator works on the job a full eight-hour day and produces 380 pieces. How many standard hours does the operator work? What is her efficiency for the eight-hour day?arrow_forwardTOYCO produces toy shovels on a 20-ton press. The steps taken by the press operator to produce one shovel are:- remove finished shovel and put on conveyor 0.1 min- remove debris from the dies 0.2 min- spray dies with oil 0.1 min- checks raw material (flat sheet) for defects 0.3 min- places flat sheet into press 0.1 min- press cycles automatically for 1.0 minThe operator is paid $10/hr and the press costs $100/hr to run.Raw material in shovel costs $1.00 and it sells for $4.00.What is the optimum number of presses for one operator for lowest unit cost?arrow_forwardautocad show the output only thanksarrow_forward
- Whiskey (SG = 0.6 and ν = 5.0 x 10-7 m2/s) is drawn from a large tank through a smoothed, rubber hose as shown in the figure. The total length of the hose to be used is 9 m and the length of the hose to point A is 3.25 m. The intended extraction of whiskey is 10 L/s and minor losses at the entrance are to be neglected. a) Calculate the smallest diameter (in 5 mm interval) required to achieve therequired flow using an iterative solution. Use an initial value of the friction factor, f0 = 0.020.b) Is the equation derived by Swamee and Jain applicable to solve the requireddiameter? Explain.c) Calculate the smallest gage pressure in the hose using the diameter (in 5 mminterval) solved.arrow_forwardThe steel grating 0.80 meter. x o.80 meters placed on top of the concrete catch basin is composed of a 10mm square bar spaced at 100mm on centers with an angular steel frame 20mm x 20mm x 6mm along the perimeter. Find the total requirement of the steel bar in kilograms and how much it will cost if 1.0 kilogram of steel amounts to PhP 45/kg. ? NOTE: Use density of steel = 7,860 kg per cubic meter.arrow_forwardShow your solution on a paper wit FBDarrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,