Summary Introduction

To identify: The design that will yield the highest profit.

Introduction:

Expected monetary value (EMV):

Expected monetary value (EMV) is a calculation system for expected returns for the certain decision made by a company.

Expert Solution & Answer
Check Mark

Answer to Problem 24P

The design K1 can be used because of the highest profit.

Explanation of Solution

Given information:

Design Cost Probability Number of non-defective (out of 100)
K1 $100,000.00 0.8 90
0.2 70
K2 $130,000.00 0.85 90
0.15 75
K3 $180,000.00 0.9 95
0.1 80

Numberofsandwichesproduceddaily=500Costofeachsandwich=$1.30Sellingpriceofeachsandwich=$2.50Numberofdaysof operation=300

Calculation of EMV:

Principles Of Operations Management, Chapter 5, Problem 24P

Calculation of expected outcome and EMV:

Design K1:

Probability 0.80

=$100,000(10100×500×300×$1.30)+(90100×500×300×$1.20)=$100,000$19,500+$162,000=$42,500

The expected outcome is calculated by adding the cost for the design K1, $100,000 and the cost of 10 unsold sandwiches ($1.20) and subtracting the resultant with the profit of 90 sandwiches sold ($2.50-$1.20=$1.30). The expected outcome is $42,500.

Probability 0.20

=$100,000(30100×500×300×$1.30)+(70100×500×300×$1.20)=$100,000$58,500+$126,000=$32,500

The expected outcome is calculated by adding the cost for the design K1, $100,000 and cost of 30 unsold sandwiches ($1.20) and subtracting the resultant with the profit of 70 sandwiches sold ($2.50-$1.20=$1.30). The expected outcome is -$32,500.

Calculation of EMV:

EMV is calculated by multiplying the payoff with the respective probabilities.

=(42,500×0.80)+(32,500×0.20)=$27,500 (1)

The expected outcome for probability 0.80, $42,500 is multiplied and the expected outcome for probability 0.20, -$32,500 is multiplied and the resultant of both is added to give the EMV for design K1 is $27,500.

Design K2:

Probability 0.85

=$130,000(10100×500×300×$1.30)+(90100×500×300×$1.20)=$130,000$19,500+$162,000=$12,500

The expected outcome is calculated by adding the cost for the design K2, $130,000 and the cost of 10 unsold sandwiches ($1.20) and subtracting the resultant with the profit of 90 sandwiches sold ($2.50-$1.20=$1.30). The expected outcome is $12,500.

Probability 0.15

=$130,000(25100×500×300×$1.30)+(75100×500×300×$1.20)=$130,000$48,500+$135,000=$43,750

The expected outcome is calculated by adding the cost for the design K2, $130,000  and the cost of 25 unsold  sandwiches ($1.20) and subtracting the resultant with the profit of 75 sandwiches sold ($2.50-$1.20=$1.30). The expected outcome is -$43,750.

Calculation of EMV:

EMV is calculated by multiplying the payoff with the respective probabilities.

=(12,500×0.85)+(43,750×0.15)=$4,062.50 (2)

The expected outcome for probability 0.85, $12,500 is multiplied and the expected outcome for probability 0.15, -$43,750 is multiplied and the resultant of both is added to give the EMV for design K2 is $4,062.50.

Design K3:

Probability 0.90:

=$180,000(5100×500×300×$1.30)+(95100×500×300×$1.20)=$180,000$9,750+$171,000=$18,750

The expected outcome is calculated by adding the cost for the design K3, $180,000 and the cost of 5 unsold sandwiches ($1.20) and subtracting the resultant with the profit of 95 sandwiches sold ($2.50 - $1.20=$1.30). The expected outcome is - $18,750.

Probability 0.10:

=$180,000(20100×500×300×$1.30)+(80100×500×300×$1.20)=$180,000$39,000+$144,000=$75,000

The expected outcome is calculated by adding the cost for the design K3, $180,000  and cost of 20 unsold  sandwiches ($1.20) and subtracting the resultant with the profit of 80 sandwiches sold ($2.50-$1.20=$1.30). The expected outcome is - $75,000.

Calculation of EMV:

EMV is calculated by multiplying the payoff with the respective probabilities.

=(18,750×0.90)+(75,000×0.1)=$24.375 (3)

The probability 0.90 and its expected outcome, -$18,750 is multiplied and the expected outcome for probability 0.10, -$75,000 is multiplied and the resultant of both is added to give the EMV for design K3 is - $24.375.

From the calculated EMV of three designs K1, K2 and K3, it can be found that EMV for design K1 is higher than other two (refer equation (1),(2) and (3)). Therefore, it is recommended to use design K1.

Hence, the design K1 can be used because of the highest profit.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
McBurger, Inc., wants to redesign its kitchensto improve productivity and quality. Three designs, calleddesigns K1, K2, and K3, are under consideration. No matterwhich design is used, daily production of sandwiches at a typi-cal McBurger restaurant is for 500 sandwiches. A sandwichcosts $1.30 to produce. Non-defective sandwiches sell, on theaverage, for $2.50 per sandwich. Defective sandwiches cannotbe sold and are scrapped. The goal is to choose a design thatmaximizes the expected profit at a typical restaurant overa 300-day period. Designs K1, K2, and K3 cost $100,000,$130,000, and $180,000, respectively. Under design K1, thereis a .80 chance that 90 out of each 100 sandwiches are non-defective and a .20 chance that 70 out of each 100 sandwichesare non-defective. Under design K2, there is a .85 chance that90 out of each 100 sandwiches are non-defective and a .15chance that 75 out of each 100 sandwiches are non-defective.Under design K3, there is a .90 chance that 95 out of each…
Matthew Bailey, as manager of Designs by Bailey,is upgrading his CAD software. The high-performance (HP)software rents for $3,000 per month per workstation. Thestandard-performance (SP) software rents for $2,000 per monthper workstation. The productivity figures that he has availablesuggest that the HP software is faster for his kind of design.Therefore, with the HP software he will need five engineers and with the SP software he will need six. This translates into a vari-able cost of $200 per drawing for the HP system and $240 per drawing for the SP system. At his projected volume of 80 draw-ings per month, which system should he rent?
​McBurger, Inc., wants to redesign its kitchens to improve productivity and quality. Three​ designs, called designs​ K1, K2, and​ K3, are under consideration. No matter which design is​ used, daily production of sandwiches at a typical McBurger restaurant is for 600 sandwiches. A sandwich costs $1.30 to produce.​ Non-defective sandwiches​ sell, on the​ average, for $2.50 per sandwich. Defective sandwiches cannot be sold and are scrapped.   The goal is to choose a design that maximizes the expected profit at a typical restaurant over a​ 300-day period. Designs​ K1, K2, and K3 cost $115,000​, $140,000​, and $170,000​, respectively.   Under design​ K1, there is a .80 chance that 90 out of each 100 sandwiches are​ non-defective and a .20 chance that 70 out of each 100 sandwiches are​ non-defective. Under design​ K2, there is a .85 chance that 90 out of each 100 sandwiches are​ non-defective and a .15 chance that 75 out of each 100 sandwiches are​ non-defective. Under design​ K3, there is a…

Chapter 5 Solutions

Principles Of Operations Management

Ch. 5.S - Prob. 4PCh. 5.S - Prob. 5PCh. 5.S - Prob. 6PCh. 5.S - Prob. 7PCh. 5.S - Prob. 8PCh. 5.S - Prob. 9PCh. 5.S - Prob. 10PCh. 5.S - A Southern Georgia school district is considering...Ch. 5.S - Prob. 12PCh. 5.S - Prob. 13PCh. 5.S - Prob. 14PCh. 5.S - Prob. 15PCh. 5.S - Prob. 16PCh. 5.S - Prob. 17PCh. 5.S - Prob. 18PCh. 5.S - Prob. 19PCh. 5.S - Prob. 1.1VCCh. 5.S - Prob. 1.2VCCh. 5.S - Prob. 1.3VCCh. 5.S - Prob. 2.1VCCh. 5.S - Prob. 2.2VCCh. 5.S - Prob. 2.3VCCh. 5.S - Prob. 3.1VCCh. 5.S - Prob. 3.2VCCh. 5.S - Prob. 3.3VCCh. 5.S - Prob. 3.4VCCh. 5 - Prob. 1EDCh. 5 - Prob. 1DQCh. 5 - What techniques do we use to define a product? ...Ch. 5 - Prob. 3DQCh. 5 - Prob. 4DQCh. 5 - Prob. 5DQCh. 5 - Prob. 6DQCh. 5 - Describe four organizational approaches to product...Ch. 5 - Explain what is meant by robust design.Ch. 5 - Prob. 9DQCh. 5 - What information is contained in a bill of...Ch. 5 - What information is contained in an engineering...Ch. 5 - What information is contained in an assembly...Ch. 5 - Prob. 13DQCh. 5 - Explain how the house of quality translates...Ch. 5 - Prob. 15DQCh. 5 - Prob. 16DQCh. 5 - Why are the direct interaction and surrogate...Ch. 5 - Prob. 18DQCh. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3PCh. 5 - Construct a house of quality matrix for a...Ch. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prepare a bill of material for (a) a pair of...Ch. 5 - Prob. 10PCh. 5 - Prepare a script for telephone callers at the...Ch. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - Prob. 15PCh. 5 - Prob. 16PCh. 5 - Prob. 17PCh. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Residents of Mill River have fond memories of ice...Ch. 5 - Prob. 21PCh. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Prob. 1CSCh. 5 - Prob. 2CSCh. 5 - Prob. 3CSCh. 5 - Prob. 1VCCh. 5 - Prob. 2VCCh. 5 - Prob. 3VCCh. 5 - Prob. 4VC
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.
Process selection and facility layout; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=wjxS79880MM;License: Standard YouTube License, CC-BY