Use the following information for Exercises 5-44 through 5-46:
The following six situations at Diviney Manufacturing Inc. are independent.
- a. A manual insertion process takes 30 minutes and 8 pounds of material to produce a product. Automating the insertion process requires 15 minutes of machine time and 7.5 pounds of material. The cost per labor hour is $12, the cost per machine hour is $ 8, and the cost per pound of materials is $10.
- b. With its original design, a gear requires 8 hours of setup time. By redesigning the gear so that the number of different grooves needed is reduced by 50%, the setup time is reduced by 75%. The cost per setup hour is $50.
- c. A product currently requires 6 moves. By redesigning the manufacturing layout, the number of moves can be reduced from 6 to 0. The cost per move is $20.
- d. Inspection time for a plant is 16,000 hours per year. The cost of inspection consists of salaries of 8 inspectors, totaling $320,000. Inspection also uses supplies costing $5 per inspection hour. The company eliminated most defective components by eliminating low-quality suppliers. The number of production errors was reduced dramatically by installing a system of statistical process control. Further quality improvements were realized by redesigning the products, making them easier to manufacture. The net effect was to achieve a close to zero-defect state and eliminate the need for any inspection activity.
- e. Each unit of a product requires 6 components. The average number of components is 6.5 due to component failure, requiring rework and extra components. Developing relations with the right suppliers and increasing the quality of the purchased component can reduce the average number of components to 6 components per unit. The cost per component is $500.
- f. A plant produces 100 different electronic products. Each product requires an average of 8 components that are purchased externally. The components are different for each part. By redesigning the products, it is possible to produce the 100 products so that they all have 4 components in common. This will reduce the demand for purchasing, receiving, and paying bills. Estimated savings from the reduced demand are $900,000 per year.
5-45 Driver Analysis
Refer to the information for Diviney Manufacturing on the previous page.
Required:
CONCEPTUAL CONNECTION For each situation, identify the possible root cause(s) of the activity cost (such as plant layout, process design, and product design).
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionChapter 5 Solutions
Managerial Accounting: The Cornerstone of Business Decision-Making
Ch. 5 - Describe the two-stage process associated with...Ch. 5 - Describe the two-stage process for departmental...Ch. 5 - What are nonunit-level overhead activities?...Ch. 5 - What is product diversity?Ch. 5 - What is an overhead consumption ratio?Ch. 5 - What is activity-based product costing?Ch. 5 - Prob. 7DQCh. 5 - Explain how costs are assigned to activities.Ch. 5 - Describe the value of activity-based customer...Ch. 5 - Explain how ABC can help a firm identify its true...
Ch. 5 - Prob. 11DQCh. 5 - What are value-added activities? Value-added...Ch. 5 - What are nonvalue-added activities? Nonvalue-added...Ch. 5 - Identify and define four different ways to manage...Ch. 5 - Prob. 15DQCh. 5 - A batch-level driver is consumed by a product each...Ch. 5 - Which of the following is a nonunit-level driver?...Ch. 5 - Prob. 3MCQCh. 5 - Use the following information for Multiple-Choice...Ch. 5 - The first stage of ABC entails the assignment of...Ch. 5 - The second stage of ABC entails the assignment of...Ch. 5 - Interview questions are asked to determine a. what...Ch. 5 - Prob. 8MCQCh. 5 - Assume that the moving activity has an expected...Ch. 5 - Which of the following is a true statement about...Ch. 5 - Prob. 11MCQCh. 5 - This year, Lambert Company will ship 1,500,000...Ch. 5 - Prob. 13MCQCh. 5 - A forklift and its driver used for moving...Ch. 5 - Which of the following are nonvalue-added...Ch. 5 - Suppose that a company is spending 60,000 per year...Ch. 5 - Prob. 17MCQCh. 5 - Thom Company produces 60 units in 10 hours. The...Ch. 5 - Thom Company produces 60 units in 10 hours. The...Ch. 5 - Striving to produce the same activity output with...Ch. 5 - Use the following information for Brief Exercises...Ch. 5 - Use the following information for Brief Exercises...Ch. 5 - Calculating ABC Unit Costs Perkins National Bank...Ch. 5 - Assigning Costs to Activities McCourt Company...Ch. 5 - Activity-Based Customer Costing Sleepeze Company...Ch. 5 - Activity-Based Supplier Costing Clearsound uses...Ch. 5 - Prob. 27BEACh. 5 - Velocity and Cycle Time Kolby Company takes 36,000...Ch. 5 - Use the following information for Brief Exercises...Ch. 5 - Use the following information for Brief Exercises...Ch. 5 - Prob. 31BEBCh. 5 - Assigning Costs to Activities Craig Company...Ch. 5 - Activity-Based Customer Costing Limpio Company...Ch. 5 - Activity-Based Supplier Costing Blackburn Inc....Ch. 5 - Nonvalue-Added Costs Evans Inc. has the following...Ch. 5 - Velocity and Cycle Time Tara Company takes 8,000...Ch. 5 - Consumption Ratios; Activity Rates Saludable...Ch. 5 - Activity Rates Patten Company uses activity-based...Ch. 5 - Comparing ABC and Plantwide Overhead Cost...Ch. 5 - Activity-Based Product Costing Suppose that a...Ch. 5 - Assigning Costs to Activities, Resource Drivers...Ch. 5 - Activity-Based Customer-Driven Costs Suppose that...Ch. 5 - Activity-Based Supplier Costing Bowman Company...Ch. 5 - Use the following information for Exercises 5-44...Ch. 5 - Use the following information for Exercises 5-44...Ch. 5 - Use the following information for Exercises 5-44...Ch. 5 - Cycle Time and Velocity In the first quarter of...Ch. 5 - Product-Costing Accuracy, Consumption Ratios Plata...Ch. 5 - Product-Costing Accuracy, Consumption Ratios,...Ch. 5 - Formation of an Activity Dictionary A hospital is...Ch. 5 - Activity Rates and Activity-Based Product Costing...Ch. 5 - Value- and Nonvalue-Added Costs Waterfun...Ch. 5 - Functional-Based versus Activity-Based Costing For...Ch. 5 - Plantwide versus Departmental Rates,...Ch. 5 - Production-Based Costing versus Activity-Based...Ch. 5 - Prob. 56PCh. 5 - Customers as a Cost Object Morrisom National Bank...Ch. 5 - Grundvig Manufacturing produces several types of...Ch. 5 - Activity-Based Supplier Costing Levy Inc....Ch. 5 - Danna Martin, president of Mays Electronics, was...Ch. 5 - John Thomas, vice president of Mallett Company (a...Ch. 5 - Cycle Time, Velocity, Product Costing Goldman...Ch. 5 - Prob. 63CCh. 5 - Consider the following conversation between...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Use the following information for Exercises 5-44 through 5-46: The following six situations at Diviney Manufacturing Inc. are independent. a. A manual insertion process takes 30 minutes and 8 pounds of material to produce a product. Automating the insertion process requires 15 minutes of machine time and 7.5 pounds of material. The cost per labor hour is 12, the cost per machine hour is 8, and the cost per pound of materials is 10. b. With its original design, a gear requires 8 hours of setup time. By redesigning the gear so that the number of different grooves needed is reduced by 50%, the setup time is reduced by 75%. The cost per setup hour is 50. c. A product currently requires 6 moves. By redesigning the manufacturing layout, the number of moves can be reduced from 6 to 0. The cost per move is 20. d. Inspection time for a plant is 16,000 hours per year. The cost of inspection consists of salaries of 8 inspectors, totaling 320,000. Inspection also uses supplies costing 5 per inspection hour. The company eliminated most defective components by eliminating low-quality suppliers. The number of production errors was reduced dramatically by installing a system of statistical process control. Further quality improvements were realized by redesigning the products, making them easier to manufacture. The net effect was to achieve a close to zero-defect state and eliminate the need for any inspection activity. e. Each unit of a product requires 6 components. The average number of components is 6.5 due to component failure, requiring rework and extra components. Developing relations with the right suppliers and increasing the quality of the purchased component can reduce the average number of components to 6 components per unit. The cost per component is 500. f. A plant produces 100 different electronic products. Each product requires an average of 8 components that are purchased externally. The components are different for each part. By redesigning the products, it is possible to produce the 100 products so that they all have 4 components in common. This will reduce the demand for purchasing, receiving, and paying bills. Estimated savings from the reduced demand are 900,000 per year. 5-46 Type of Activity Management Refer to the information for Diviney Manufacturing on the previous page. Required: For each situation, identify the cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection.arrow_forwardBox Springs, Inc., makes two sizes of box springs: twin and double. The direct material for the twin is $25 per unit and $40 s used in direct labor, while the direct material for the double is $40 per unit, and the labor cost is $50 per unit. Box Springs estimates it will make 5,000 twins and 9,000 doubles in the next year. It estimates the overhead for each cost pool and cost driver activities as follows: How much does each unit cost to manufacture?arrow_forwardCarsen Company produces handcrafted pottery that uses two inputs: materials and labor. During the past quarter, 24,000 units were produced, requiring 96,000 pounds of materials and 48,000 hours of labor. An engineering efficiency study commissioned by the local university revealed that Carsen can produce the same 24,000 units of output using either of the following two combinations of inputs: The cost of materials is 8 per pound; the cost of labor is 12 per hour. Required: 1. Compute the output-input ratio for each input of Combination F1. Does this represent a productivity improvement over the current use of inputs? What is the total dollar value of the improvement? Classify this as a technical or an allocative efficiency improvement. 2. Compute the output-input ratio for each input of Combination F2. Does this represent a productivity improvement over the current use of inputs? Now, compare these ratios to those of Combination F1. What has happened? 3. Compute the cost of producing 24,000 units of output using Combination F1. Compare this cost to the cost using Combination F2. Does moving from Combination F1 to Combination F2 represent a productivity improvement? Explain.arrow_forward
- Box Springs. Inc., makes two sizes of box springs: queen and king. The direct material for the queen is $35 per unit and $55 is used in direct labor, while the direct material for the king is $55 per unit, and the labor cost is $70 per unit. Box Springs estimates it will make 4,300 queens and 3,000 kings in the next year. It estimates the overhead for each cost pool and cost driver activities as follows: How much does each unit cost to manufacture?arrow_forwardUse the following information for Exercises 8-47 and 8-48: Billings Company produces two products, Product Reno and Product Tahoe. Each product goes through its own assembly and finishing departments. However, both of them must go through the painting department. The painting department has capacity of 2,460 hours per year. Product Reno has a unit contribution margin of 120 and requires 5 hours of painting department time. Product Tahoe has a unit contribution margin of 75 and requires 3 hours of painting department time. There are no other constraints. 8-47 Choosing the Optimal Product Mix with One Constrained Resource Refer to the information for Billings Company above. Required: 1. What is the contribution margin per hour of painting department time for each product? 2. What is the optimal mix of products? 3. What is the total contribution margin earned for the optimal mix?arrow_forwardCozy, Inc., manufactures small and large blankets. It estimates $350,000 in overhead during the manufacturing of 75,000 small blankets and 25,000 large blankets. What is the predetermined overhead rate if a small blanket takes 1 machine hour and a large blanket takes 2 machine hours?arrow_forward
- Boarders estimates overhead will utilize 160,000 machine hours and cost $80,000. It takes 4 machine hours per unit, direct material cost of $5 per unit, and direct labor of $5 per unit. What is the cost of each unit produced?arrow_forwardCozy, Inc., manufactures small and large blankets. It estimates $950,000 in overhead during the manufacturing of 360,000 small blankets and 120,000 large blankets. What is the predetermined overhead rate if a small blanket takes 2 hours of direct labor and a large blanket takes 3 hours of direct labor?arrow_forwardBienestar Inc., has the following departmental structure for producing a well-known multivitamin: A consultant designed the following cellular manufacturing structure for the same product: The times above the processes represent the time required to process one unit of product. Required: 1. Calculate the time required to produce a batch of 15 bottles using a batch-processing departmental structure. 2. Calculate the time to process 15 units using cellular manufacturing. 3. How much manufacturing time will the cellular manufacturing structure save for a batch of 15 units?arrow_forward
- Five Card Draw manufactures and sells 24,000 units of Diamonds, which retails for $180, and 27,000 units of Clubs, which retails for $190. The direct materials cost is $25 per unit of Diamonds and $30 per unit of Clubs. The labor rate is $25 per hour, and Five Card Draw estimated 180,000 direct labor hours. It takes 3 direct labor hours to manufacture Diamonds and 4 hours for Clubs. The total estimated overhead is $720,000. Five Card Draw uses the traditional allocation method based on direct labor hours. A. What is the gross profit per unit for Diamonds and Clubs? B. What is the total gross profit for the year?arrow_forwardStacks manufactures two different levels of hockey sticks: the Standard and the Slap Shot. The total overhead of $600,000 has traditionally been allocated by direct labor hours, with 400,000 hours for the Standard and 200.000 hours for the Slap Shot. After analyzing and assigning costs to two cost pools, it was determined that machine hours is estimated to have $450.000 of overhead, with 30,000 hours used on the Standard product and 15,000 hours used on the Slap Shot product. It was also estimated that the inspection cost pool would have $150,000 of overhead, with 25,000 hours for the Standard and 5,000 hours for the Slap Shot. What is the overhead rate per product, under traditional and under ABC costing?arrow_forwardPratt Company produces two replacement parts for a popular line of Blu-ray disc players: Part A and Part B. Part A is made up of two components, one manufactured internally and one purchased from external suppliers. Part B is made up of three components, one manufactured internally and two purchased from suppliers. The company has two processes: fabrication and assembly. In fabrication, the internally produced components are made. Each component takes 20 minutes to produce. In assembly, it takes 30 minutes to assemble the components for Part A and 40 minutes to assemble the components for Part B. Pratt Company operates one shift per day. Each process employs 100 workers who each work eight hours per day. Part A earns a unit contribution margin of 20, and Part B earns a unit contribution margin of 24 (calculated as the difference between revenue and the cost of materials and energy). Pratt can sell all that it produces of either part. There are no other constraints. Pratt can add a second shift of either process. Although a second shift would work eight hours, there is no mandate that it employ the same number of workers. The labor cost per hour for fabrication is 15, and the labor cost per hour for assembly is 12. Required: 1. Identify the constraints facing Pratt, and graph them. How many binding constraints are possible? What is Pratts optimal product mix? What daily contribution margin is produced by this mix? 2. What is the drummer constraint? How much excess capacity does the other constraint have? Assume that a 1.5-day buffer inventory is needed to deal with any production interruptions. Describe the drum-buffer-rope concept using the Pratt data to illustrate the process. 3. Explain why the use of local labor efficiency measures will not work in Pratts TOC environment. 4. Suppose Pratt decides to elevate the binding constraint by adding a second shift of 50 workers (labor rates are the same as those of the first shift). Would elevation of Pratts binding constraint improve its system performance? Explain with supporting computations.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage LearningPrinciples of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegeCornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
- Financial And Managerial AccountingAccountingISBN:9781337902663Author:WARREN, Carl S.Publisher:Cengage Learning,Managerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College PubEssentials of Business Analytics (MindTap Course ...StatisticsISBN:9781305627734Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. AndersonPublisher:Cengage Learning
Managerial Accounting: The Cornerstone of Busines...
Accounting
ISBN:9781337115773
Author:Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:Cengage Learning
Principles of Accounting Volume 2
Accounting
ISBN:9781947172609
Author:OpenStax
Publisher:OpenStax College
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Financial And Managerial Accounting
Accounting
ISBN:9781337902663
Author:WARREN, Carl S.
Publisher:Cengage Learning,
Managerial Accounting
Accounting
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:South-Western College Pub
Essentials of Business Analytics (MindTap Course ...
Statistics
ISBN:9781305627734
Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. Anderson
Publisher:Cengage Learning
Relevant Costing Explained; Author: Kaplan UK;https://www.youtube.com/watch?v=hnsh3hlJAkI;License: Standard Youtube License