Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 6.4, Problem 12P
Summary Introduction
To determine: The lowered fixed cost of sweatshirt machinery before producing sweatshirts using Solver Table.
Introduction: The variation between the present value of the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Billy's Blues sells 3 types of T-shirts: Astro, Bling, and Curious. Manufacturing Astros requires 2 minutes of machine time and 20 minutes of labor, and costs $10. Brand Bling requires 2.5 minutes of machine time and 30 minutes of labor, and costs $14 to produce. Brand Curious requires 3 minutes of machine time and 45 minutes of labor, and costs $18 to produce. There are 300 machining minutes available per week, 3750 labor minutes, and he has a budget of $3000. Brand Astro sells for $15, Brand Bling for $18, and Brand Curious for $25.
If Billy could acquire more of any resource, which would it be?
Group of answer choices
money
buyers
labor time
machining time
The Happy Nut sells three different half-pound bags of peanut mixes: Party Nuts, Mixed, and Premium Mix. These generate per-bag revenue of $1.00, $2.25, and $3.65, respectively. The tables below show the makeup of each mix, the available ingredients for the next week, and the cost of each ingredient.
Ingredients
Peanuts
Cashews
Brazil nuts
Hazelnuts
Party nuts
100%
Mixed
55%
25%
10%
10%
Premium Mix
40%
20%
40%
Pounds available
Cost per pound
Peanuts
600
$1.25
Cashews
200
$5.35
Brazil nuts
120
$6.00
Hazelnuts
115
$6.85
In the optimal solution, Happy Nuts should produce _______ bags of Party Nuts.
During the next four months, a customer requires, respectively, 600, 800, 1,200, and 900 units of a commodity, and no backlogging is allowed (that is, the customer's requirements must be met on time). Production costs are $80, $100, $105, and $90 per unit during these months. The storage cost from one month to the next is $20 per unit (assessed on ending inventory). It is estimated that each unit on hand at the end of month 4 can be sold for $60. Assume there is no beginning inventory. Determine how to minimize the net cost incurred in meeting the demands for the next four months.
a. What is the optimized net cost?$
b. Use SolverTable to see what happens to the decision variables and the total cost when the initial inventory varies from 0 to 1,000 in 100-unit increments. How much lower would the total cost be if the company started with 100 units in inventory, rather than none?$
Chapter 6 Solutions
Practical Management Science
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Bangs Leisure Chairs produces three types of hand-crafted outdoor chairs that are popular for beach, pool, and patios – sling chairs, Adirondack chairs, and hammocks. The unit profit for these products is $40, $100, and $90, respectively. Each type of chair requires cutting, assembling, and finishing. The owner is retired and is available to work 6 hours per day for 5 days per week, so there will be 120 hours available each month. He doesn’t want to spend more than 50 hours each month on any one activity (that is, no more than 50 hours on cutting, no more than 50 hours on assembling, no more than 50 hours on finishing, in a given month). The retailer who buys the chairs will buy all that can be produced. Sling chairs are made up of ten wood pieces for the frame and one piece of cloth. The actual cutting of the wood takes 30 minutes (0.5 hour). Assembling includes sewing of the fabric and the attachment of rivets, screws, fabric, and dowel rods and takes 45 minutes (0.75 hour). The…arrow_forwardJohn Hoke owns Hoke's Spokes, a bicycle shop. Most of John's bicycle sales are customer orders; however, he also stocks bicycles for walk-incustomers. He stocks three types of bicyclesroad-racing, cross-country, and mountain. A road-racing bike costs $1,200, a cross-country bike costs$1,700, and a mountain bike costs $900. He sells road-racing bikes for $1,800, cross-country bikes for $2,100, and mountain bikes for $1,200. Hehas $12,000 available this month to purchase bikes. Each bike must be assembled; a road-racing bike requires 8 hours to assemble, a crosscountrybike requires 12 hours, and a mountain bike requires 16 hours. He estimates that he and his employees have 120 hours available toassemble bikes. He has enough space in his store to order 20 bikes this month. Based on past sales, John wants to stock at least twice as manymountain bikes as the other two combined because mountain bikes sell better If John were to hire an additional worker for 30 hours at $10 per hour, how much…arrow_forwardA clothing company produces three types of sport jackets (types 1, 2, and 3), each with different resource requirements (hours of labor, units of leather, and units of wool). The unit costs of these resources are $5 per hour of labor, $7 per unit of leather, and $3 per unit of wool. In each production cycle, the company has 1000 hours of labor available, 800 units of leather, and 900 units of wool. To avoid inventory surplus at the end of the production cycle, the sales department has set maximum production limits for each jacket type, stipulating that no more than 200 jackets of type 1, 100 jackets of type 2, and 150 jackets of type 3 should be produced. The company aims to determine the optimal production plan for the next production cycle to maximize total profit, while adhering to the constraints of resource availability and production limits. Type 1 Type 2 Type 3 Labor time required (hours) 3 2 2 Leather (units) 3 2 0.5 Wool (units) 0.5 2…arrow_forward
- AMCHEM Chemical Company produces three products: A, B, and C. Each product requires labor to produce it, and production of each product creates pollutants. By law the firm is not allowed to produce more than the following pollutants per day: 200 pounds of sulfur dioxide, 300 pounds of carbon monoxide, 150 pounds of hydrogen sulfide, and 50 pounds of benzene. The total number of person-hours of labor available per day is 6000. In addition, the total output per day of products A and B combined cannot be more than the output of product C. Each pound of product A generates a profit of $5, each pound of B generates $7, and each pound of C generates $4. Pollutant and labor rates per hundred pounds of product are given here. a. Formulate this problem as a linear program to maximize daily profit.b. Solve the problem using a computer.arrow_forwardJohn Hoke owns Hoke's Spokes, a bicycle shop. Most of John's bicycle sales are customer orders; however, he also stocks bicycles for walk-in customers. He stocks three types of bicyclesroad-racing, cross-country, and mountain. A road-racing bike costs $1,200, a cross-country bike costs $1,700, and a mountain bike costs $900. He sells road-racing bikes for $1,800, cross-country bikes for $2,100, and mountain bikes for $1,200. He has $12,000 available this month to purchase bikes. Each bike must be assembled; a road-racing bike requires 8 hours to assemble, a crosscountry bike requires 12 hours, and a mountain bike requires 16 hours. He estimates that he and his employees have 120 hours available to assemble bikes. He has enough space in his store to order 20 bikes this month. Based on past sales, John wants to stock at least twice as many mountain bikes as the other two combined because mountain bikes sell better. Formulate a linear programming model for this problem.arrow_forwardKane Manufacturing has a division that produces two models of fireplace grates, x units of model A and y units of model B. To produce each model A grate requires 3 lb of cast iron and 6 min of labor. To produce each model B grate requires 4 lb of cast iron and 3 min of labor. The profit for each model A grate is $4.00, and the profit for each model B grate is $3.50. Also, 1000 lb of cast iron and 20 labor-hours are available for the production of fireplace grates per day.Because of a backlog of orders for model A grates, Kane's manager had decided to produce at least 150 of these grates a day. Operating under this additional constraint, how many grates of each model should Kane produce to maximize profit? (x,y)= What is the optimal profit?arrow_forward
- Irwin Textile Mills produces two types of cotton clothdenim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such, requires 7.5pounds of raw cotton per yard, whereas denim requires 5 pounds of raw cotton per yard. A yard of corduroy requires 3.2 hours of processing time;a yard of denim requires 3.0 hours. Although the demand for denim is practically unlimited, the maximum demand for corduroy is 510 yards permonth. The manufacturer has 6,500 pounds of cotton and 3,000 hours of processing time available each month. The manufacturer makes a profitof $2.25 per yard of denim and $3.10 per yard of corduroy. The manufacturer wants to know how many yards of each type of cloth to produce tomaximize profit What would be the effect on the optimal solution if Irwin Mills could obtain only 6,000 pounds of cotton per month?arrow_forwardIrwin Textile Mills produces two types of cotton clothdenim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such, requires 7.5pounds of raw cotton per yard, whereas denim requires 5 pounds of raw cotton per yard. A yard of corduroy requires 3.2 hours of processing time;a yard of denim requires 3.0 hours. Although the demand for denim is practically unlimited, the maximum demand for corduroy is 510 yards permonth. The manufacturer has 6,500 pounds of cotton and 3,000 hours of processing time available each month. The manufacturer makes a profitof $2.25 per yard of denim and $3.10 per yard of corduroy. The manufacturer wants to know how many yards of each type of cloth to produce tomaximize profit Solve the model formulated for Irwin Textile Mills graphically.arrow_forwardBarrows Textile Mills produces two types of cotton cloth—denim and corduroy. Corduroy is a heavier grade of cottoncloth and, as such, requires 7.5 pounds of raw cotton peryard, whereas denim requires 5 pounds of raw cotton peryard. A yard of corduroy requires 3.2 hours of processingtime; a yard of denim requires 3.0 hours. Although the demand for denim is practically unlimited, the maximumdemand for corduroy is 510 yards per month. The manufacturer has 6500 pounds of cotton and 3000 hours of processing time available each month. The manufacturermakes a profit of $2.25 per yard of denim and $3.10 peryard of corduroy. The manufacturer wants to know howmany yards of each type of cloth to produce to maximizeprofit.PROBLEMS • GO Tutoriala. Formulate and solve a linear programming model forthis problem.b. Solve this model using the graphical method.arrow_forward
- 1. A soldier sells for $27 and uses $10 worth of raw materials. Each soldier that is manufactured increases Giapetto’s variable labor and overhead costs by $14. A train sells for $21 and uses $9 worth of raw materials. Each train built increases Giapetto’s variable labor and overhead costs by $10. The manufacture of wooden soldiers and trains requires two types of skilled labor: carpentry and finishing. A soldier requires 2 hours of finishing labor and 1 hour of carpentry labor. A train requires 1 hour of finishing labor and 1 hour of carpentry labor. Each week, Giapetto can obtain all the needed raw material but only 100 finishing hours and 80 carpentry hours. Demand for trains is unlimited, but at most 40 soldiers are bought each week. Giapetto wants to maximize weekly profit (revenues-costs). a) Formulate Giapetto’s problem into a LP model. b) Use the graphical solution method to find an optimal solution. c) Provide the answer and sensitivity reports (from Excel Solver). d)…arrow_forward6. Product A requires 7.1 minutes of milling, 7 minutes for inspection, and 6 minutes of drilling per unit; product B requires 7.3 minutes of milling, 5 minutes for inspection, and 8 minutes of drilling per unit; product C requires 2.6 minutes of milling, 3 minutes for inspection, and 15 minutes of drilling. The department has 12 hours available during the next period for milling, 15 hours for inspection, and 24 hours for drilling. Product A contributes $2.0 per unit to profit, product B contributes $2.3 per unit, and product C contributes $4.0 per unit. How do you express the milling constraint mathematically? NOTE: Let A,B, and C denote respectively the number of A, B, and C to be produced. a. A + B + C <= 12 b. A + B + C <= 720 c. 7.1 A + 7.3 B + 2.6 C <= 12 d. 7.1 A + 7 B + 6C <= 12 e. 7.1 A + 7.3 B + 2.6 C <= 720arrow_forwardJohn Hoke owns Hoke’s Spokes, a bicycle shop. He stocks 4 types of bicycles – basic, road racing, cross-country, and mountain. A basic bike costs $ $300, road-racing bike costs $1,200, a cross-country bike costs $1,700, and a mountain bike costs $900. He sells basic bikes for $600, road-racing bikes for $1,800, cross-country bikes for $2,100 and mountain bikes for $1,200. He has $30,000 available this month to purchase bikes. Each bike must be assembled; a basic bike requires 5 hours to assemble, road-racing bike requires 8 hours to assemble, a cross-country bike requires 12 hours, and a mountain bike requires 16 hours. He estimates that he and his employees have 140 hours available to assemble bikes. He has enough space in his store to order 40 bikes this month. Based on past sales, John wants to stock at least 10 basic bikes, one cross country bike, one road racing bike, and 2 mountain bikes. John wants to know how many bikes of each type he should stock in order to maximize profit.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,