Question
Chapter 9, Problem 9.10P
To determine
A better deal of dumpsters for the city.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
New tires are purchased for service trucks. Each service truck is given 4 tiresand a spare. If there are 65 new tires, how many trucks will receive new tires?
given the following data of cut and fill, compute the free haul distance, overhaul distance, waste and borrow volume. having the values of:
Cost of overhaul: 3000 ID/station
Cost of free haul: 5000 ID/cu.m
Cost of borrow: 15000 ID/cu.m
Free haul distance (F.H.D.): 300m = 2 stations
Cost of waste=5000 ID/cu.m
economic overhaul distance=5 stations
limit of economic haul=8 stations
A truck unloads 20m³ of gravel at a landfill. You, who own the truck, plan to purchase an uncovered box in which to transport the gravel on multiple trips. Your cost is the cost of the box plus $2.00 per trip. The box must be half a meter high, but you can choose the length and width. The cost of the box will be $20.00 per square meter for the front and back; and $10.00 per square meter for the bottom and sides. What should be the dimensions of the box you should purchase to minimize your total costs?
Knowledge Booster
Similar questions
- What is the factors effect on a coagulation process? And why we use a coagulants?arrow_forwardWhat are the major factors in the operation and maintenance of an ESP?arrow_forwardThe AW values of three revenue alternatives are $-23,000 for A, $-21,600 for B, and $-27,300 for C. On the basis of these AW values, the correct decision is to:a. select alternative A.b. select alternative B.c. select alternative C.d. select the do nothing alternative.arrow_forward
- Assume it costs 30 cents per ton per mile to operate a garbage truck and 10 cents per ton per mile to operate a transfer truck. A transfer station also has fixed cost of $20 per ton. If it is 40 miles to the landfill. What would be your least expensive transportation alternative?arrow_forwardnational motors must build a bridge to access land for its manufacturing plant expansion. If made of normal steel, the bridge would initially cost $38,000. and it should last 13 years. Maintenance (cleaning and painting) will cost $1900 per year. If a more corrosion-resistant steel were used, the annual maintenance cost would be only $180 per year (with the same life). if the firm's cost of money is 13%, what is the maximum amount that should be spend on the corrosion-resistand bridge?arrow_forwardAnswer 3-20 plus the following question: If 100 commercial locations are to be serviced twice a week, and there are 5 workdays per week, how many trucks are needed?arrow_forward
- Three transportation projects have been proposed to increase the safety in and around a residential neighborhood. Each project consists of upgrading existing street signing to highly retroreflective sheeting to increase visibility. The following table shows the initial construction costs, annual operating costs, useful life of the sheeting, and the salvage values for each alternative. Assume that the discount rate is 8%. Calculate the present worth for each alternative and determine the preferred project based on the economic criteria. Discount Rate: 8%arrow_forwardThe proposed steel bridge has an indefinite life. The initial cost of the bridge is $3,750,000 and annual maintenance costs are estimated to be $25,000. The bridge deck will be resurfaced every 10 years for $900,000 and anti-corrosion paint will be applied every 5 years for $250,000. If the interest rate is 8%, what is the EUAC?arrow_forwardA four-year-old truck has a present net realizable value of $6,000 and is now expected to have a market value of $1,800 after its remaining three-year life. Its operating disbursements are expected to be $720 per year. An equivalent truck can be leased for $0.40 per mile plus $30 a day for each day the truck is kept. The expected annual utilization is 3,000 miles and 30 days. If the before-tax MARR is 15%, find which alternative is better by comparing before-tax equivalent annual costs a. using only the preceding information; b. using further information that the annual cost of having to operate without a truck is $2,000. Rework the above exercise, by comparing after-tax equivalent PWs if the effective income tax rate is 40%, the present book value is $5,000, and the depreciation charge is $1,000 per year if the firm continues to own the truck. Any gains or losses on disposal of the old truck affect taxes at the full 40% rate, and the after-tax MARR is 5%.arrow_forward
- 3 I need a quick solution within 15 minutes With my best wishesTon.arrow_forwardDescribe what is least cost method (LCM) steps of LCM in transportation?arrow_forwardThe CFO of a consulting engineering firm is deciding between purchasing Ford Explorers andToyota 4Runners for company principals. The purchase price for the Ford Explorer will be $31,000.Annual maintenance costs for the Explorer are expected to be $600 per year more than that of the4Runner. The purchase price for Toyota 4Runners is 35,000 The trade-in values after 3 years areestimated to be 50% of the first cost for the Explorer and 60% for the 4Runner.(a)What is the incremental ROR between the two vehicles?(b) Provided the firm’s MARR is 18% per year, which vehicle should it buy?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning