Solid Waste Engineering
3rd Edition
ISBN: 9781305635203
Author: Worrell, William A.
Publisher: Cengage Learning,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 9, Problem 9.12P
To determine
The revenue stream to finance the project.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Assume it costs 30 cents per ton per mile to operate a garbage truck and 10 cents per ton per mile to operate a transfer truck. A transfer station also has fixed cost of $20 per ton. If it is 40 miles to the landfill. What would be your least expensive transportation alternative?
You are the lead consultant of team A consult, leading the charge for the siting of a landfill for the metropolitan area. Explain the likely factors you would consider for the land siting of the facility
Can I get a thorough step by step for the following question?
A sanitary landfill has available space 25 ha at an average depth 12 m. Nine hundred sixty-five (965) cubic meters of solid waste are dumped at the site each day for 5 days per week. This waste is compacted to twice its delivered density. Draw a mass-balance diagram and estimate the expected life of the landfill in years.
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- In 1-2 sentences, explain why you think the Aor. Landfill in Clark County, Nevada was chosen as a location for the landfillarrow_forwardComplete the following diagram of a sanitary landfill. Indicate the features. With Picture THANKSarrow_forwardA truck unloads 20m³ of gravel at a landfill. You, who own the truck, plan to purchase an uncovered box in which to transport the gravel on multiple trips. Your cost is the cost of the box plus $2.00 per trip. The box must be half a meter high, but you can choose the length and width. The cost of the box will be $20.00 per square meter for the front and back; and $10.00 per square meter for the bottom and sides. What should be the dimensions of the box you should purchase to minimize your total costs?arrow_forward
- If you’re planning a solid waste collection program, cite and explain four collection elements that are importantarrow_forwardMethods for burying and covering solid waste in sanitary (solid waste) landfill. Explain with the help of diagram?arrow_forwardHow important is the implementation ofaSanitary Landfill in the economy ofacountry? And how vital is the involvement of the society in its operation?arrow_forward
- given the following data of cut and fill, compute the free haul distance, overhaul distance, waste and borrow volume. having the values of: Cost of overhaul: 3000 ID/station Cost of free haul: 5000 ID/cu.m Cost of borrow: 15000 ID/cu.m Free haul distance (F.H.D.): 300m = 2 stations Cost of waste=5000 ID/cu.m economic overhaul distance=5 stations limit of economic haul=8 stationsarrow_forwardA company plans to construct a wastewater treatment plant to treat and dispose of its wastewater. Construction of a wastewater treatment plant is expected to cost $2 million and an operating cost of $300,000/yr. Determine the NPV of the total cost (including the capital investment and total operating expenses) over the period of 30 years at an interest rate of 6.5% for treating the wastewaterarrow_forwardWhat is the factors effect on a coagulation process? And why we use a coagulants?arrow_forward
- 2. A wooden pole- untreated, will last for 10 years under a certain soil condition,costs P1.2M. If a treated pole will have a useful life double that of the untreatedpole, what is the maximum justifiable amount that can be paid for the treatedpole, if the maximum amount of ROI is 12%. Consider the annual taxes andinsurance to be 1% of the first cost.arrow_forwardDiscuss at least 4 consequences of inappropriate disposal of MSW? Define the term; Recyclingarrow_forwardThe AW values of three revenue alternatives are $-23,000 for A, $-21,600 for B, and $-27,300 for C. On the basis of these AW values, the correct decision is to:a. select alternative A.b. select alternative B.c. select alternative C.d. select the do nothing alternative.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,