Traffic and Highway Engineering
5th Edition
ISBN: 9781305156241
Author: Garber, Nicholas J.
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
![Assuming that the whole DMV is only handled by one queue and one server and both the arrival rate
(20 customer per hour) and the service rate (30 customers per hour) random variables are Markovian.
(a) What is the mean queue length? [3 pts]
(b) Percentage of Idle time of the server? [3 pts]
(c) Average number in the queue? [3 pts]
(d) Average number in the system? [3 pts]
(e) The average wait time in the queue? [3 pts]
(f) The average wait time in the system? [3 pts]
(g) The probability that no one is in the system. [2 pts]](https://content.bartleby.com/qna-images/question/553c03f6-c199-4870-a061-8ddf7adde455/468befe6-110d-4360-a8b0-90d2118fec6e/dv5coxm_thumbnail.jpeg)
Transcribed Image Text:Assuming that the whole DMV is only handled by one queue and one server and both the arrival rate
(20 customer per hour) and the service rate (30 customers per hour) random variables are Markovian.
(a) What is the mean queue length? [3 pts]
(b) Percentage of Idle time of the server? [3 pts]
(c) Average number in the queue? [3 pts]
(d) Average number in the system? [3 pts]
(e) The average wait time in the queue? [3 pts]
(f) The average wait time in the system? [3 pts]
(g) The probability that no one is in the system. [2 pts]
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by stepSolved in 2 steps

Knowledge Booster
Similar questions
- Consider a city center where the traffic conditions are described by a Macroscopic Fundamental Diagram (MFD) of network outflow (g- rate of trips finished) vs. accumulation (n- number of cars) with a trapezoidal shape, as shown in the figure below. The values of the parameters are: • • maximum trip completion rate gmax=100 [veh/min] critical accumulations ncr1=1000 [veh] and ncr2=1500 [veh] jam accumulation njam=4000 [veh]. gmax ncr1 ncr2 njam There are two types of demands in the morning peak hour (7-8am): trips generated from outside the city center with rate q1=80 [veh/min], and trips generated from within the city center with rate q2=50 [veh/min]. In addition, a perimeter traffic control, u, is available that only restricts vehicles entering the city from outside. If at 7am there are already no=500 [veh] in the city center: a. Write the dynamic equations (mass conservation equation) in a continuous form for the center of the city. b. Convert the continuous dynamic into the discrete…arrow_forwardKindy explain the pie chart percentage and give some related study and references about Value of travel time connected to the pie chartarrow_forwardThe Jeffersonville Transportation Study area has been divided into four traffic zones. The following data have been compiled. Travel Time (min) District Productions Attractions 1 2 3 4 1 3,000 3,000 5 8 12 15 2 1,000 400 8 5 10 8 3 2,000 4,500 12 10 5 7 4 2,500 600 15 8 7 5 Travel Time 1 5 6 7 8 10 12 15 Fij 2.00 1.30 1.10 1.00 0.95 0.85 0.80 0.65 After the first iteration, the trip table was as follows. District 1 2 3 4 Ps 1 1,415 138 2 367 67 1,306 141 493 73 3 522 4 641 74 125 As 2,945 404 1,478 256 4,550 601 3,000 1,000 1,273 131 2,000 2,500 Complete the second iteration. District 1 2 3 4 Computed A 1 2 3 4 Computed Parrow_forward
- The arrival times of vehicles at the ticket gate of a sports stadium may be assumed to bePoisson with a mean of 30 mi/h. It takes an average of 1.5 min for the necessary tickets to be bought for occupants of each car. (a) What is the expected length of queue at the ticket gate, not including the vehicle being served? (b) What is the probability that there are no more than 5 cars at the gate, including the vehicle being served? (c) What will be the average waiting time of a vehicle?arrow_forwardA suburb has 2000 households. The council hired two transport consulting companies to predict the generated work trips from within the suburb after building a few residential complexes. The new buildings will increase the number of households to 2500. The following information is provided: Type Household Size Household Count Projected Household Count 1 1 500 800 2 2 800 900 3 3 700 800 Each company has conducted different travel surveys from 200 households based on different sampling methods. The work trip generation models are as follows: Company A: T₁ = -0.1 + 0.8 (household size) Company B: T₁ = 0.1 + 0.5 (household size) a. If the total number of current work trips is 2700, which model should be used for prediction? Why? b. What are the possible reasons for the difference between the two models? C. As a transport engineer working for council, propose a new and more accurate model based on Companies A and B models. d. Based on the new model in Part C, predict the number of work…arrow_forwardNote:arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningSolid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning
- Residential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage Learning

Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning

Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,

Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning

Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning