If the direct cost of materials, labor and equipment of CHB (4") laying work for 102.14 sq.m is Php 84,740.15. What is the unit cost per square meter if you are to include 15% profit?
Q: 55 kN 70 kN/m В C A 3 m 7 m
A:
Q: is the speed value which has the highest frequency of observation. is the 98th accumulated speed. 4-...
A: 4- Modal speed is the speed value which has the highest frequency of observation. Explanation: Mod...
Q: 4.31 As a valve is opened, water flows through the diffuser shown in Fig. P4.31 at an increasing flo...
A:
Q: Given: 1. Structural Component: Beam 300 mm x 400 mm Column 400 mm x 400 mm Slab thickness 110 mm 2....
A: Shear stress is a force that tends to produce material deformation by sliding along a plane or plane...
Q: Determine/derive the Shear and Moment Equations of each segment of the beam (kindly include the FBD)...
A:
Q: smooth transition section connects two rectangular channels as shown. The channel width increases fr...
A: Given: Channel width increases from 1.8 m to 2.1 m, and the water surface elevation is to remain the...
Q: A beam has a concentrated load (Pu) at midspan and has a fixed support at both ends. If the beam pro...
A: Given: The width of the beam is 271 mm. The height of the beam is 462 mm. The load Pu is 58.15 kN. T...
Q: Classify the following soil using the U.S. Department of Agriculture textural classification. Gravel...
A: Reference : USDA - US Department of Agriculture Textural Classification Refer the figure established...
Q: SITUATION. A column 400 mm x 400 mm square is supported by a 3 mx 3misolated spread footing whose fc...
A: Punching shear : Punching shear occurs when a concentrated force is delivered to a small area of a s...
Q: tem shown in Fig. P15.51. Determine the (a) pump operation point in terms of head and discharge, (b)...
A: Hydraulic loss: - It is a loss of energy in a fluid system in the container or pipe due to friction ...
Q: Provide a general description of crucible furnace used in Industrial Manufacturing of Steel.
A: Manufacturing is the process of transforming raw materials or parts into completed things using tool...
Q: Axial loads are applied to the compound rod that is composed of an aluminum segment rigidly connecte...
A: We have to determine the value of stress (in Mpa) in the bronze if given that P= 188 kN and the diag...
Q: A vertical 150-mm-diameter pipe leaves a water tank that has a surface elevation of 12m. Between the...
A: Velocity of flow at 0 elevation=Q/A Area=A=πd24 d=150/1000=0.15 m A=3.14×0.152/4=0.0177 m2 V=0.06/...
Q: 1.8 m 1.8 m 2 m
A: Uniform bar A cross section is when you cut an object in half and expose the shape inside. Uniform i...
Q: 5. Consider the embankment profile shown below. Determine the stress increase at points A and B. Bot...
A: Consider the load is distributed in the ration of 2H:1V
Q: A sanitary house drain is to be installed on a single-storey house to serve 1 water closet, 1 washba...
A: Discharge Q=50 gpm=0.0022×50=2ft/sec3 Velocity v=2ft/sec
Q: . A beam AB 8.5 m long is hinged at A and supported on rollers over a smooth surface inclined at 30°...
A:
Q: Calculate the active and passive earth pressures AND. determine the distance at which the net active...
A: Given: Dry density Saturated density Cohesion Angle of friction To find: Active earth pressure
Q: A steel rod 15mm diameter is held snugly (but without any initial stresses) between rigid walls by t...
A:
Q: Given: 1. Structural Component: Beam 300 mm x 400 mm Column 400 mm x 400 mm Slab thickness 110 mm 2....
A: The continuous and repetitive application of a load on an item or structural component in a horizont...
Q: In the diagram shown, the correct steps for drawing a triangle starting from point B in the AutoCAD ...
A: The steps are as: Draw the line of length 40.00 making an angle of 0° with horizontal. (Enter 40.00...
Q: What is the motion of a particle with respect to a fixed frame? Absolute Motion Independent Motion D...
A: To Determine The motion of a particle with respect to a fixed frame?
Q: Water is discharged under a sluice gate at a rate of 75 m3 /s into a frictionless, horizontal, recta...
A: Given data in question Discharge Width Downstream depth To find out Depth upstream Froude's numbe...
Q: A rectangular concrete beam 250 mm wide and 600 mm deep is pre-stressed by means of 16 high tensile ...
A: GIVEN, A rectangular concrete beam of width=250mmDepth=600mmDiameter of wire=7mmEffective pre-stres...
Q: The box slides down the slope described by the equation y = (0.05x²) m, where x is in meters. If v, ...
A:
Q: A square footing is to be used to support a 300mm by 300mm RC column loaded with 500 kN dead load an...
A:
Q: Two pipes 1 and 2 are connected in series. Pipe 1 is 200 mm in diameter and 300 m long while pipe 2 ...
A:
Q: Two plates, subjected to direct tension, each of 10 mm thickness and having widths of 100 mm and 175...
A:
Q: complete solution!! Calculate the minimum wall thickness for a cylindrical vessel that is to carry...
A: Given data, A cylindrical vessel,having Diameter= 2ft = 2×12 in = 24in. Pressure= P= 1500lb/in² All...
Q: Problem 1. Determine Xg and Yg SECOND TO THE LAST DIGIT DIMENSION OF YOUR STUDENT NO. USE USE DIMENS...
A:
Q: 3. A stratum of normally consolidated clay is 25 feet thick and the water content is measured as 50%...
A:
Q: 2. A manufacturing firm contemplates retiring an existing machine at the end of 2002. The new machin...
A:
Q: Given: E= 29x10^6 psi A= 2in^2 Determine the deformations members AB, BC, BE, DE and DF. Please show...
A: We have to determine the value of deformations in members AB, BC, BE, DE and DF as per the given dat...
Q: In the diagram shown, the correct steps for drawing a triangle starting from point A TO point C in t...
A:
Q: The T beam was designed to support a maximum factored moment of 880kN.m. f'c= 21 MPa, fy= 415 MPa, s...
A: Answer We are given Factored Moment = 880 Kn.m f'c = 21 Mpa fy = 415 Mpa concrete cover = 40 mm reb...
Q: A ball of mass 5kg and a block of 12 kg are attached by a light weight cord that passes over a frict...
A: Given, The ball of mass m1 is 5 Kg, The block of mass m2 is 12 Kg, g=9.8 m/sec2
Q: b) Determine the reaction forces and/or reaction moments at pin (You can neglect the height of the b...
A:
Q: A 12 mm thick plate is connected to two 8 mm thick plates, on either side through a 16 mm diameter p...
A:
Q: 34. Design the following simply supported interior beam using compression reinforcement as nart of t...
A:
Q: Shear and Moment Diagram: 600 lb/ft 1200 lb - ft 6 ft 4 ft 4 ft Point of Zero Shear: Value of Moment...
A:
Q: Discuss the importance of the proper selection of tubing, fitting, and hose installation in a hydrau...
A: It is very important to select the correct tubing, fitting and hose installation in a hydraulic syst...
Q: Two pipes 1 and 2 are connected in series. Pipe 1 is 200 mm in diameter and 300 m long while pipe 2 ...
A:
Q: 50 kips 20 kips/ft 560 kip-ft В D | F 6 ft 10 ft 6 ft 12 ft 6 ft
A:
Q: 7. The steel shaft is formed by attaching a hollow shaft to a solid shaft. Determine the value of to...
A: We have to determine the value of torque T that can be applied to the ends of the shaft without exce...
Q: The previous, zoom :command is used to Its usefulness is to enlarge the drawing page. This command i...
A:
Q: Problem 2 CE Board Nov 2018 If a spiral 80 m long connects with a 6.5 degrees circular curve, determ...
A:
Q: Use the method of sections to determine the forces in each member. State whether the forces is in te...
A: Given: The value of P is 20 kN. The value of Q is 12 kN.
Q: Question 8 Classify the following soil using the U.S. Department of Agriculture textural classificat...
A: The given data is shown below: Sand=45Silt=35Clay=20
Q: The angle between the prolongation of the preceding line and the forward line of a traverse is calle...
A:
Q: Bronze A= 400 mm? A = 600 mm? A= 300 mm? ЗР 2P 4P - 4 m -3 m- -5m-
A:
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 2 images
- Calculate for the labor cost per square meter of CHB laying considering the following data: Labor Productivity = 12 sq.m. per day Gang Rates: Labor Rate @ 1 mason per diem = Php 856.00 Labor Rate @ 1 Labor per diem = Php 581.00 a. Php 119.75 per sq.m b. Php 958.00 per sq.m c. Php 1,077.75 per sq.m d. Php 2,155.50 per sq.mThe following table represents the activities of a small construction pro- ject that is required as follows Act. Dur. Dep. on A 5 B 12 C 7 A 10 E 7 2 D,E 12 D,E G 10 F 4 D,B H,G,F H,G,F M 2 K N M,L 1) Find the critical path and project implementation period. 2) The contractor stipulates a delay fine of one million dinars for each day of delay, the amount of the delay fines that the contractor will pay if the event is delayed (J) (6 weeks), knowing that a week is equal to (6 days). 3) The contractor applied the incentive system for workers within the activities G, D, so that the productivity of that group increased by 50%, what is the time period in which the project duration decreased. 4) The delay of the contractor in the implementation of the event (L) so that the total project period was delayed (3 weeks). VWhat is the period during which the event was delayed (L)? 5) Activity D.E is carried out using a specific machine. Will the contractor pay a late fine if only one machine is…Which of the following is not a phase of construction project? Select one: a. Tendering b. Estimation c. Briefing d. Commissioning Question 29 Not yet answered Marked out of 1.00 P Flag question What would be the payback period of excavator generating annual return of $70000 and initial cost $350000 and service life 7 years? Select one: a. 2 YEARS b. 3 YEARS c. 4 YEARS
- A civil engineer is constructing a sheltered port with harbor and water breaker. Total project cost is approximately P 1,300,000,000.00. What will be the minimum engineering service fee for the project?A proposed 3-storey residential building with a 1st floor area of 50 square meters, 2nd floor (6m wide and 10m long) and 3rd floor (6m wide and 8.5m long) is to be built by a crew composed of a foreman, 6 skilled workers and 8 laborers. The estimated duration of the project is 8 months and 3 days. Considering a Php 20,000.00 cost per square meter; what is the total project cost if the crew is to be paid at the following rates: foreman (4200 pesos per week), skilled worker (500 pesos per day), and laborer (8250 pesos per month). Workers are given Sundays as rest day.Discuss “Contract System” of CNW KPK for civil construction work from inviting of tender to allotment of work
- Please Box the Final answer. Need ASAP A unit welding machine costs ₱45,000 with an estimated life of 5 years. Its salvage value is ₱2,500. Find its depreciation using sinking fund method at 8.5%.The following information belongs to a target cost contract: Target cost = $250 M Target band = $230 M and ends $270 M Target contractor fee = $10.5 M Cost saving share = 55/45 by owner Cost increase share = 65/35 by contractor Contractor minimum fees =$5 M The GMC = $320 M Minimum expected project cost = $ 200 M Calculate the contractor fee, if the project cost is 280 M? Select one: a. 6 M b. 3 M c. 4 M d. 5 MComplete solution needed A building constructor has a contract which will expire in 50 days. He has 80 men on the job and can finish the job in 80 days. The wage per day of 40 men is P800.00 each and that of the other 40 men is P500.00 each for 8 hours work per day. The fine or liquidated damages for delay in the work is P15,000.00 per day. How many more men should the contractor add in order to enable him to complete the work on time? Assuming that the additional men to be added will be paid P500.00 per day, will the contractor save money by employing enough men for him to complete the work on time or by not adding more men and paying the fine? How much is the savings, if any? No overtime work is permitted.
- A contractor is considering the purchase of an earthmover to avoid the cost of a rental unit. The earthmover costs $350,000 initially and will cost $7000 per year to store and maintain. When used, the operating cost is $300 per day to the contractor. A rental unit costs $500 per day to rent and operate. The contractor estimates that he would keep the earthmover for 20 years and could then sell it at salvage for $20,000. He requires a 12% rate of return on any investment. Determine how many days per year he would have to operate the earthmover to make it a worthwhile purchase. Sketch the breakeven chart for this situation.Under a unit-price contract with a 25 percent guarantee requirement of all unit prices quoted, the engineer’s estimate of earthwork quantities totals 9,270 cubic meters. If the actual quantities measured in the field for paypurposes total 10,650 cubic meters, is a change order justified for the quantity change?Estimating & Costing Civil Q Create a rough estimate for the building project with the total Based on the statistics below, the total building's plinth area is 800 square metres. i) Plinth area fee is Rs. 4500 per square metre Water supply costs are 7% of building costs. Cost of electrical and sanitary installations, each at 7% of the price of iv) The price of architectural features is 1% of the cost of the structure. v) The cost of streets and lawns, which is 5% of building costs. vi) P&S and contingency costs at 4% of building costs. Calculate the project's overall cost.