Incorrect Question 10 In the EOQ model, what is the total annual purchasing cost if the optimal order quantity is 100, optimal number of orders per year is 5, and unit purchasing cost is $2. $40 $10 $250 $1,000
Q: On average, 100 customers arrive per hour at the Gotham City Bank. The average service time for each…
A: Find the Calculation methods below: Traffic intensity = Arrival time (100)Service time (60)P0 =…
Q: Bike Components Inc. manufactures bicycle wheels. The firm's owner/manager, has just received the…
A: Find the Calculation methods below: Output Forecast = (Regular time production- Demand) + Overtime…
Q: If not, should she talk with Drew about the situation? If so, should she talk with Drew before…
A: The fundamental elements in this situation is an effective team collaborating to achieve goals. If a…
Q: ) with strategic goals (4). write a short paragraph explaining and justifying the operational goals…
A: The company Caterpillar Inc. produces heavy machinery and engines. Bulldozers, excavators, wheel…
Q: Cherry owns a fruit stand at the corner of Espana Street and N. Reyes Street. She buys ripe bananas…
A: Firstly calculating, Cumulative probability: We know that, Probability = No. of days / Total No. of…
Q: Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the…
A: Given data is Production goal = 180 PDAs
Q: Problem 20-10 (Algo) You are a newsvendor selling San Pedro Times every morning. Before you get to…
A: Given The selling price= is $1.10 cost=0.30 mean, m=265 standard deviation, s=53
Q: Given the RPN determined by a severity of 4, occurrence of 6, and Detection of 9, should action be…
A: A failure mode or failure cause's risk priority level is expressed numerically in an FMEA analysis…
Q: You work for shipping company ABC and your company is shipping 15 bottles of cylinders and 20 crates…
A: A dangerous products specialist is in charge of marking and packing hazardous commodities in…
Q: Problem 7 At Treasure Wine Estates in Napa, CA the Sales and Marketing Department have developed a…
A: Given data is Linear trend equation: Ft=90+12.5t A linear trend equation can be formed by taking the…
Q: a) The alternative with the least expected cost is ▼ a. Hire full-time b. Hire part-time The…
A: Given, States of nature table with each alternatives and natures having probabilities Expected cost…
Q: Givens: Cost of waiting = $25/hr Cost of serving (per channel) = $160 per 8 hour shift λ=12…
A: Given data is Waiting cost (Cw) = $25 per hr Service cost (Cs) = $160 per 8-hour shift for each…
Q: The Company "Best Engineers Ltd has released the figures shown below for the financial years 2018…
A: Formula to be used: Total quality cost = Prevention Cost + Appraisal cost + Internal Failure cost +…
Q: How government influence on pricing give organization examples for explanation?
A: Free markets are frequently thought of as having little to no government intervention. In practice,…
Q: The results of inspection of DNA samples taken over the past ten days are given at left. Sample size…
A: Control charts are also known as process-behavior charts. It is a statistical process that helps in…
Q: To be effective, a task analysis must look at the following three components: human operator,…
A: Any process of evaluating what a user does and why they do it, step by step, and utilizing this…
Q: A simplex tableau is shown below. You should complete the tableau and respond to the questions…
A: Find the given details below: Given details: X1 X2 X3 S1 S2 Basic CB 3 4 5 0 0…
Q: 9. A project has the following activities, with specified precedents, expected durations (in…
A: Network Diagram-
Q: ABC Inc. sells patio sets. Monthly sales for a seven-month period were as follows: Month Sales…
A: In the naive aprroach, the last month's sales are used as this period's forecast.
Q: consumer service and cost reduction are two bench marks of an effective system of marketing…
A: The first stage in managing an activity in a planned and organized manner is determining the…
Q: Researchers suggest that the urge to master something new and engaging is the best predictor of…
A: The rate at which output of goods and services is generated per unit of input is known as…
Q: G H Activity A BCDEFG Normal Predecessor Duration 7 3 ABB А Crashing - Example Crash Duration 6 A…
A: Find the network diagram below: Duration:
Q: A bakery wants to determine how many trays of doughnuts it should prepare each day. Demand is normal…
A: The number of tray should be calculate with following formula:- Number of tray = Demand + z *…
Q: A project has the activity duration and cost information indicated in the table where all times are…
A: ES = Max EF value from immediate Predecessor(s)EF = ES + Normal TimeLS = LF – Normal TimeLF = Min LS…
Q: I am planning a Holiday Ornament to commemorate the christmas spirit. Forcasted demand for ornaments…
A:
Q: Draw a quadrant diagram using lead time on horizontal axis and demand uncertainty along the vertical…
A: The quadrant diagram provided below shows the lead time at the horizontal axis and demand is placed…
Q: (This is not related to the previous question). The average arrival rate is 4/hour (Poisson) and the…
A: Given, Arrival rate λ = 4 / hour Service rate μ = 6 / hour (a) Average number in line Lq = λμ-λ Lq =…
Q: What are some examples of companies that use lean manufacturing philosophy?
A: Lean Manufacturing Philosophy is the philosophy which focuses on producing…
Q: 2 companys customers are either old or new. A customer may be able or not able to provide an…
A: A decision table is a logic-based data entry system used to handle business operations. The…
Q: Coca-Cola's brand name is indicative of a(n) __________, while its marketing and distribution…
A: Introduction Coca-cola is a brand today that needs no introduction. It is a carbonated drink sold…
Q: Should she talk with the other team members from marketing individually aboutDrew?Why or why not?
A: A cross-functional initiative has invited Laura Brooks to lead the team. It is intended to enhance…
Q: a).Create a working table taking lines as rows and destinations as columns b). Determine the…
A: As per Bartleby guidelines, we can only solve one question at a time...Kindly upload the other…
Q: Integrating transaction processing systems (TPS) with ERP allows organizations to streamline…
A: QUESTION 20 : TRUE. QUESTION 21 : TRUE. QUESTION 22 : TRUE. QUESTION 23 : TRUE.
Q: forecasting
A: b.2
Q: One inherent risk to using lean principles is that companies are at higher risk of inventory…
A: The concept underlying lean inventory control is based on eradicating unneeded things & more…
Q: The "Eclectic Paradigm" by John Dunning identifies three categories of gains from international…
A: The eclectic paradigm is an economic and commercial strategy for evaluating the desirability of…
Q: A project has the following activities, with specified precedents, expected durations (in days), and…
A: A network diagram is a graphical representation of project which helps to identify the project…
Q: In a 3 x 3 transportation problem, let xij be the amount shipped from source i to destination j and…
A: Find the Given details below: Given details: 1 2 3 Supply ui 1 C11 C12 C13 15 -2 2 C21…
Q: Maximize Z = 3x₁ + 10x₂ subject to x₁ + 2x₂ ≥ 8 4x₁ + 5x₂ = 30 ≤ 5 X1 and x₁ ≥ 0, x₂ ≥ 0. (a)…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: Based on the following payoff table, answer the following: High Medium Low 20 5 25 11 13 12…
A: Given-
Q: Discuss two trends in supply chain management. In general, how should companies in a country prepare…
A: In the question, I would discuss the supply chain trends along with the points like how companies…
Q: a) the 10th transplant 10.40 hours (round your response to two decimal places). b) The cost of 10th…
A: Given: Cost per hour of surgery = $5000 Learning Rate = 75% Time is taken for the first transplant =…
Q: Zack Pop has been a producing plant production manager for the last 10 years. One produce item,…
A: Given data: Average daily sales (mean) = 400 Daily sales between = 350 and 450. The purchase cost…
Q: Suppose you go out shopplng for a new espresso machine and run into MLE player Trea Turner (who…
A: A formal or corporate transaction between the two parties can always in two modes that is either in…
Q: A production line is to be designed for a job with four tasks. The task times are 2.7 minutes, 0.4…
A: Given data: Task 1 time = 2.7 minutes Task 2 time = 0.4 minutes Task 3 time = 0.6 minutes Task 4…
Q: Was Joly overpaid? What factors probably led to this pay package?
A: 1. Joly wasn't overpaid since the average executive's cash pay, given the importance of Best Buy to…
Q: A weighing process has an upper specification of 1.751 grams and a lower specification of 1.632…
A: Given: USL =1.751 gm LSL=1.631 gm Mean = 1.7 gm S.D = 0.023 gm
Q: Suppose demand is know and constant at 500 units per year (one year has 250 working days). The…
A: EOQ = sqrt (2DS/H) Annual Holding cost = EOQ/2 x H Annual ordering cost = D/EOQ x S Reorder…
Q: EOQ is 1,500 units based on annual demand of 15,000 units. The ordering cost os P 25 and carrying…
A: Given the data stated below, The annual demand=15000 units The ordering cost applicable for each…
Q: a) The total amount of hours to build the 13 units = hours (round your response to the nearest whole…
A: Given that: Learning rate = 85% Time taken by 1st unit = 760 hrs
Step by step
Solved in 2 steps
- The EOQ model with quantity discounts attempts todetermine:a) the lowest amount of inventory necessary to satisfy acertain service level.b) the lowest purchase price.c) whether to use a fixed-quantity or fixed-period orderpolicy.d) how many units should be ordered.e) the shortest lead timeProblem #4. A certain type of computer costs P80,000 per unit, and the annual holding cost is 25% of the per-unit cost. Annual demand is 10,000 units, and the order cost is P12,000 per order. 1. What is the approximate economic order quantity (round off to nearest whole number)? 2. If because of inflation the ordering cost increase to P12,720 per order, by how much will the EOQ change (indicate if the change is an increase or decrease)?Q2) Groundz Coffee Shop uses 4 kgs of a specialty tea weekly; each kg costs $16. Carrying costs are $1 per kg per week because space is very scarce. It costs the firm $8 to prepare an order. Assume 52 weeks per year. How many kgs of tea should Groundz order at a time? What is total annual cost. How many orders should Groundz place annually. Q2) Groundz Coffee Shop uses 4 kgs of a specialty tea weekly; each kg costs $16. Carrying costs are $1 per kg per week because space is very scarce. It costs the firm $8 to prepare an order. Assume 52 weeks per year. How many kgs of tea should Groundz order at a time? What is total annual cost. How many orders should Groundz place annually.
- Economic Order Quantity and Reorder PointFind the economic order quantity and the reorder point, givenAnnual demand ( D )= 1, 000 unitsAverage daily demand ( d¯ ) = 1, 000 ∕365ordering cost ( S ) = $5 per orde rHolding cost ( H ) = $1.25 per unit per yearLead time ( L ) = 5 daysCost per unit ( C ) =$12.50What quantity should be ordered?If EOQ = 289 units, S = $100, and H = $1 per unit per month, what approx. annual demand (D) level would the EOQ model best fit? Pick the closest answer option. EOQ = Sq root of [(2D*S)/H] D = annual demand in units S = cost of placing 1 order; H = cost of holding 1 unit of that item in inventory for 1 year 3596 units 3540.00 units 5011 units 4510 unitsHenry Crouch’s law office has traditionallyordered ink refills 60 units at a time. The firm estimates thatcarrying cost is 40% of the $10 unit cost and that annualdemand is about 240 units per year. The assumptions of thebasic EOQ model are thought to apply.a) For what value of ordering cost would its action be optimal?b) If the true ordering cost turns out to be much greater thanyour answer to (a), what is the impact on the firm’s ordering policy?
- Forrest and Dan make boxes of chocolates for which the demand is uncertain. Forrest says, “That’s life.” On the other hand, Dan believes that some demand patterns exist that could be useful for planning the purchase of sugar, chocolate, and shrimp. Forrest insists on placing a surprise chocolatecovered shrimp in some boxes so that “You never know what you’ll get.” Quarterly demand (in boxes of chocolates) for the last 3 years follows: Quarter Year 1 Year 2 Year 3 1 2 3 4 3,000 1,700 900 4,400 3,300 2,100 1,500 5,100 3,502 2,448 1,768 5,882 Total 10,000 12,000 13,600 a. Use intuition and judgment to estimate quarterly demand for the fourth year.b. If the expected sales for chocolates are 14,800 cases for year 4, use the multiplicative seasonal method to prepare a forecast for each quarter of the year. Are any of the quarterly forecasts different from what you thought you would get in part (a)?Rick Jerz is attempting to perform an inventory analysison one of his most popular products. Annual demand for thisproduct is 5,000 units; ca rrying cost is $50 per unit per year; ordercosts for his company typically run nearly $30 per order; and leadtime averages I 0 days. (Assume 250 working days per year.)a) What is the economic order quantity?b) What is the average inventory?c) What is the optimal number of orders per year?d) What is the optimal number of working days between orders?e) What is the total annual inventory cost (carrying cost+ ordering cost)?t) What is the reorder poi nt?Genesis Company is a wholesaler. It purchases 60,000 units of Product X per month for sale to retailers. The cost of placing an order is P100. The cost of holding one unit of inventory for one year is P4. Note: Kindly input your answer with comma.Example: 10,000 Required: a. Compute the economic order quantity. b. How many orders would be placed under the EOQ policy? c. Compute the annual ordering cost for the EOQ. d. Compute the annual carrying cost for the EOQ. e. Compute the total inventory-related cost at the EOQ.
- Problem 3: You're a buyer for fictional Quality Kitchen Appliances. Thestore has a demand for 1,000 toasters ovens per year. The cost of each toaster oven is US$78. The ordering cost is US$100 per order. The holding cost is 40% of the cost of the oven per unit per year.a What is the optimal Order Quantity?b How many orders will be placed per year?c What is the total annual cost (in US dollars)?d If the holding cost decreases to 30% of the unit cost of the oven, what effect will it have on EOQ and the totalannual cost?Suppose that the EOQ is 100, average annual demand is1,000 units, and the lead time demand is a random variablehaving the distribution shown in Table 15.a What value of SLM1 corresponds to a reorder pointof 25?b If we wanted to attain a 95% value of SLM1, whatreorder point should we choose?c If we wanted an average of at most two stockouts peryear, what reorder point should we choose? Lead TimeDemand Probability10 16 15 14 20 14 25 112 30 14Basic EOQ. This type of problem can be recognized when annual demand (D), ordering cost (S), andholding or carrying cost per unit (H) are given. Use Formula 13–2 for order quantity, Formula 13–1for total cost, and D/Q for number of orders a year.A toy manufacturer uses approximately 32,000 silicon chips annually. The chips are used at asteady rate during the 240 days a year that the plant operates. Annual holding cost is $3 per chip, andordering cost is $120. Determine the following:a. The optimal order quantityb. The number of workdays in an order cycle