Rashed is a member of the supplier's evaluation committee; his company is in the process of selecting a supplier to provide a solar air-conditioning solution. Answer the following: 1. What is the supplier evaluation criteria that Rashed and his team will follow to select the right supplier? (Mention 5) 2. What are the sources of supply risk that Rashed's company may face with the supplier? (Mention 5 risks)
Q: Why is the police called as the initiator of the Criminal Justice System?
A: Police are the part of administration system which helps to maintain a specified decorum in the…
Q: A small generator burns two types of fuel – low sulfur and high sulfur – to produce electricity. For…
A: Objectives: Minimize Cost = 600x + 500y subject to 3x + 5y <= 15 sulfur constraint…
Q: A. Outline the four steps involved in a risk management process.
A: We’ll answer the first question since the exact one wasn’t specified. Please submit a new question…
Q: what is Organizational learning importance and pros and cons and exa
A: Organizational learning is the procedure by which an association advances itself over period through…
Q: Below is data of lobster sales volume from a seafood company. We are using exponential smoothing (α…
A: Forecasting is the process of estimating future demands and sales using the previous years of…
Q: How can a KMS system be implemented in any company such that workers may utilise it but not rely on…
A: In the ever-changing world of cloud computing, business leaders need to be able to adapt to stay…
Q: Tell us why aligning product needs with manufacturing processes is so important?
A: Manufacturing process is a process in which the raw materials and semi raw materials are converted…
Q: what can be four good behavorial questions for mock interview with a project manager
A: The project Management career comes with multiple challenges, and they might be asked various…
Q: Design and conduct interviews in order to establish system needs; describe and build a strategy for…
A: An interview is a process where a candidate is asked questions by an interviewer. Interview plays a…
Q: n your opinion, why do you think data quality is so important in data warehousing? Do you know the…
A: Data quality means maintaining and improving the accuracy of data in data storehouse. Data Quality…
Q: Race One Motors is an indonesian car manufacturer. Al its largest manufacturing facility, in…
A: As per our guidelines, we are supposed to answer only three sub-parts when multiple sub-parts are…
Q: Sonware upgrade firmes in miutes) are being ovaliated. Samples of five observations each have been…
A: Given data: Sample data:
Q: It is important to understand the differences between project management and software project…
A: Project management and software project management are both essential skills for any software…
Q: An important step in getting data ready for analysis is cleaning the data. List and briefly discuss…
A: One of the critical steps to making the data ready for analysis, we must clean the available data,…
Q: How might one improve response rates in a mailed survey?
A: A mailed survey is method of survey in which an enumerator mails a questionnaire to a large number…
Q: What is the relationship between supply chain metrics and the underlying processes?
A: Supply chain metrics are often misunderstood and misused, so it’s important to understand their…
Q: Identify and critically discuss any THREE drawbacks/disadvantages of the smart factory (max 200).
A: A smart factory (also known as the industrial internet of things) refers to a production facility…
Q: Is collaborating with suppliers in the healthcare business a smart strategy for improving the…
A: Suppliers are the lifeblood of a firm because without supplier it's impossible for a firm to have…
Q: The "5 Why" technique is useful in identifying.. Six Sigma projects that should be prioritized.…
A: The 5 why technique is used to find out the root cause of a problem in order to remove it from its…
Q: Heizer and Render advises that when analyzing and designing processes to transform resources into…
A: Is the process designed to achieve competitive advantage in terms of differentiation, response or…
Q: How can the tourism industry reduce & eliminate probable risks in Covid 19 situation?
A: The coronavirus (COVID-19) pandemic has caused an unparalleled disaster due to its swift and massive…
Q: Outline TWO benefits of production sheet to the operational control in the kitchen.
A: Production sheet is a planning tool which records how much task is done and number of goods…
Q: The contract of sale is distinct from other types of contracts because it has two additional…
A: A contract of a sale is a contract in which the one party agrees to buy and another party agrees to…
Q: A public utility intends to buy a turbine as part of an expansion plan and must now decide on the…
A: Given data: Average demand or mean (D) = 4.4 parts Purchased cost = $170 Holding & disposal…
Q: 1. A businessman needs 5 cabinets, 12 desks, and 18 shelves cleaned out. He has two part-time…
A: Note: - Since it is specified to answer question number 2 we will answer question 2 here. If answer…
Q: what factors aided Rockwater in it's smooth switch to the balance scorecrd?
A: A balanced scorecard is a performance management report which provides feedback on internal business…
Q: How can leaders promote intrinsic and extrinsic motivation?
A: Intrinsic motivation means to perform a task for self satisfaction by doing that task not for…
Q: Amanda is experiencing power. Her supervisor is threatening to either write her up or demote her if…
A: Coercive power refers the power in which the leader takes out work from its employees by coercing or…
Q: A shoe manufacturer uses 2,000 rubber soles per year for its popular shoe line. The firm makes its…
A: Here now solving the first part of the given question
Q: Analyse how the organisation may apply one popular model in managing planned change in response to…
A: Absa Group Limited, known initially as Amalgamated Banks of South Africa. It is a South African…
Q: 1. A catering company prepared and served 300 meals at an anniversary celebration last week using…
A: Productivity is the relationship between the total output and total inputs of the process.
Q: what is the difference between raw materials and feedstock? give examples
A: Definitions: Raw materials: - Raw materials are the general component terms that consist of all the…
Q: First, discuss the various expenses of quality management. What is TQM and how does it work?
A: Total quality management is a process in which firm continuosly implements changes in its processes…
Q: How would you characterize the production alliance between GM and SAIC Shanghai?
A: GM is known as ‘General Motors’ and SAIC is known as ‘Shanghai Automotive Industry Corporation’. GM…
Q: A local firm sells pairs of pants at P1,579 each. The cost of manufacturing and marketing them is…
A: Given data: Fixed cost = 11315 Selling price = 1579 Variable cost = 546
Q: A final assembly plant for a certain automobile model is to have a capacity of 240,000 units…
A: Data Given Annual production = 240,000 unit Operating time(t) = (50 week/yr * 5 days/week * 8…
Q: Which inventory system is the preferred inventory system since orders are not built until the…
A: Note- Hi! Thank you for the question As per the honour code, We’ll answer the first question since…
Q: What is the idle time at the paint work center for the optimal schedule?
A: The smallest time is located in Job E (1 hour). Since the time is in First Work Center (Body),…
Q: Subject: Product Design and Development Make sure your answer is right if not surely it will be…
A: Variable cost refers to the costs which varies with the change in the output ,an increase in output…
Q: hat is the MCE (Manufacturing Cycle Efficiency)? a.15 minutes b.20 minutes c.30 minutes d.5 minutes…
A: Manufacturing is a process of making goods, and the production of items or parts for use in trade.…
Q: Ann decided to hired Dionne Richards to be her assistant given the exigencies of this particular…
A: Given: identified resources=10 Kimberley Sharpe who would continue the set of activities started by…
Q: Q4: M/S XYZ Company Manufactures Sports bikes and supplies them to the local market. A local…
A: since the purchase order details of spoke only are asked in part b, the MRP of only relevant items…
Q: 9. The Optima Shop has two work centers: Big Mess and No Problem. The Monday list of orders to be…
A: The setup time is preparing the machine to perform the required operation . Based on the operation…
Q: Ownership rights for real property include: a) free flow of air rights. b) inheritance rights. c)…
A: Ownership rights refers to the right to use the such asset,right to sell and right to have possesion…
Q: discuss the concept/idea behind the empty depot operator in the supply chain industry?
A: A Container Depot is where holders are put away after the products are dumped. The compartment stop…
Q: How to improve supply chain resilience?
A: Supply chain is the backbone of any firm because all other process capabilities will be dependent…
Q: What are the major causes of small-business failure? Do these causes also apply to larger…
A: It is becoming really competitive to setup a business in the present day scenario as lot of…
Q: Consider following data. Draw activity on arc (AOA) network diagram. Find out critical path,…
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: Purse styles remain on the market for 12 years after creation. When a certain purse company creates…
A: Arrival rate, lambda =1 in 5 months = 1/5 = 0.2 purse per month Service rate, mu =1 in 12 months…
Q: Are there any operational savings that might be realized by corporations who outsource?
A: Outsourcing refers to the use of professionals for a part of work which a firm feels expensive to…
Step by step
Solved in 3 steps
- Avion, Inc. Susan Dey and Bill Mifflin, procurement managers at Avion, Inc., sat across from each other and reviewed a troubling performance report concerning a key supplier, Foster Technologies. The report detailed the deteriorating performance of Foster Technologies in the areas of material quality and on-time delivery. At this point, Kevin ODonnell, another procurement manager, entered the room. What parts of the supply chain are most closely involved with the situation in this case? What is the responsibility of each part in order to maintain a smooth flow of material?Avion, Inc. Susan Dey and Bill Mifflin, procurement managers at Avion, Inc., sat across from each other and reviewed a troubling performance report concerning a key supplier, Foster Technologies. The report detailed the deteriorating performance of Foster Technologies in the areas of material quality and on-time delivery. At this point, Kevin ODonnell, another procurement manager, entered the room. Explain the role of performance measurement in managing supply chain activities.Avion, Inc. Susan Dey and Bill Mifflin, procurement managers at Avion, Inc., sat across from each other and reviewed a troubling performance report concerning a key supplier, Foster Technologies. The report detailed the deteriorating performance of Foster Technologies in the areas of material quality and on-time delivery. At this point, Kevin ODonnell, another procurement manager, entered the room. Why can changes within a supply chain disrupt the normal flow of goods and services within a supply chain?
- The Global Sourcing Wire Harness Decision Sheila Austin, a buyer at Autolink, a Detroit-based producer of subassemblies for the automotive market, has sent out requests for quotations for a wiring harness to four prospective suppliers. Only two of the four suppliers indicated an interest in quoting the business: Original Wire (Auburn Hills, MI) and Happy Lucky Assemblies (HLA) of Guangdong Province, China. The estimated demand for the harnesses is 5,000 units a month. Both suppliers will incur some costs to retool for this particular harness. The harnesses will be prepackaged in 24 12 6-inch cartons. Each packaged unit weighs approximately 10 pounds. Quote 1 The first quote received is from Original Wire. Auburn Hills is about 20 miles from Autolinks corporate headquarters, so the quote was delivered in person. When Sheila went down to the lobby, she was greeted by the sales agent and an engineering representative. After the quote was handed over, the sales agent noted that engineering would be happy to work closely with Autolink in developing the unit and would also be interested in future business that might involve finding ways to reduce costs. The sales agent also noted that they were hungry for business, as they were losing a lot of customers to companies from China. The quote included unit price, tooling, and packaging. The quoted unit price does not include shipping costs. Original Wire requires no special warehousing of inventory, and daily deliveries from its manufacturing site directly to Autolinks assembly operations are possible. Original Wire Quote: Unit price = 30 Packing costs = 0.75 per unit Tooling = 6,000 one-time fixed charge Freight cost = 5.20 per hundred pounds Quote 2 The second quote received is from Happy Lucky Assemblies of Guangdong Province, China. The supplier must pack the harnesses in a container and ship via inland transportation to the port of Shanghai in China, have the shipment transferred to a container ship, ship material to Seattle, and then have material transported inland to Detroit. The quoted unit price does not include international shipping costs, which the buyer will assume. HLA Quote: Unit price = 19.50 Shipping lead time = Eight weeks Tooling = 3,000 In addition to the suppliers quote, Sheila must consider additional costs and information before preparing a comparison of the Chinese suppliers quotation: Each monthly shipment requires three 40-foot containers. Packing costs for containerization = 2 per unit. Cost of inland transportation to port of export = 200 per container. Freight forwarders fee = 100 per shipment (letter of credit, documentation, etc.). Cost of ocean transport = 4,000 per container. This has risen significantly in recent years due to a shortage of ocean freight capacity. Marine insurance = 0.50 per 100 of shipment. U.S. port handling charges = 1,200 per container. This fee has also risen considerably this year, due to increased security. Ports have also been complaining that the charges may increase in the future. Customs duty = 5% of unit cost. Customs broker fees per shipment = 300. Transportation from Seattle to Detroit = 18.60 per hundred pounds. Need to warehouse at least four weeks of inventory in Detroit at a warehousing cost of 1.00 per cubic foot per month, to compensate for lead time uncertainty. Sheila must also figure the costs associated with committing corporate capital for holding inventory. She has spoken to some accountants, who typically use a corporate cost of capital rate of 15%. Cost of hedging currencybroker fees = 400 per shipment Additional administrative time due to international shipping = 4 hours per shipment 25 per hour (estimated) At least two five-day visits per year to travel to China to meet with supplier and provide updates on performance and shipping = 20,000 per year (estimated) The international sourcing costs must be absorbed by Sheila, as the supplier does not assume any of the additional estimated costs and invoice Sheila later, or build the costs into a revised unit price. Sheila feels that the U.S. supplier is probably less expensive, even though it quoted a higher price. Sheila also knows that this is a standard technology that is unlikely to change during the next three years, but which could be a contract that extends multiple years out. There is also a lot of hall talk amongst the engineers on her floor about next-generation automotive electronics, which will completely eliminate the need for wire harnesses, which will be replaced by electronic components that are smaller, lighter, and more reliable. She is unsure about how to calculate the total costs for each option, and she is even more unsure about how to factor these other variables into the decision. Based on this case, do you think international purchasing is more or less complex than domestic purchasing? Why? Is it worth the additional effort?The Global Sourcing Wire Harness Decision Sheila Austin, a buyer at Autolink, a Detroit-based producer of subassemblies for the automotive market, has sent out requests for quotations for a wiring harness to four prospective suppliers. Only two of the four suppliers indicated an interest in quoting the business: Original Wire (Auburn Hills, MI) and Happy Lucky Assemblies (HLA) of Guangdong Province, China. The estimated demand for the harnesses is 5,000 units a month. Both suppliers will incur some costs to retool for this particular harness. The harnesses will be prepackaged in 24 12 6-inch cartons. Each packaged unit weighs approximately 10 pounds. Quote 1 The first quote received is from Original Wire. Auburn Hills is about 20 miles from Autolinks corporate headquarters, so the quote was delivered in person. When Sheila went down to the lobby, she was greeted by the sales agent and an engineering representative. After the quote was handed over, the sales agent noted that engineering would be happy to work closely with Autolink in developing the unit and would also be interested in future business that might involve finding ways to reduce costs. The sales agent also noted that they were hungry for business, as they were losing a lot of customers to companies from China. The quote included unit price, tooling, and packaging. The quoted unit price does not include shipping costs. Original Wire requires no special warehousing of inventory, and daily deliveries from its manufacturing site directly to Autolinks assembly operations are possible. Original Wire Quote: Unit price = 30 Packing costs = 0.75 per unit Tooling = 6,000 one-time fixed charge Freight cost = 5.20 per hundred pounds Quote 2 The second quote received is from Happy Lucky Assemblies of Guangdong Province, China. The supplier must pack the harnesses in a container and ship via inland transportation to the port of Shanghai in China, have the shipment transferred to a container ship, ship material to Seattle, and then have material transported inland to Detroit. The quoted unit price does not include international shipping costs, which the buyer will assume. HLA Quote: Unit price = 19.50 Shipping lead time = Eight weeks Tooling = 3,000 In addition to the suppliers quote, Sheila must consider additional costs and information before preparing a comparison of the Chinese suppliers quotation: Each monthly shipment requires three 40-foot containers. Packing costs for containerization = 2 per unit. Cost of inland transportation to port of export = 200 per container. Freight forwarders fee = 100 per shipment (letter of credit, documentation, etc.). Cost of ocean transport = 4,000 per container. This has risen significantly in recent years due to a shortage of ocean freight capacity. Marine insurance = 0.50 per 100 of shipment. U.S. port handling charges = 1,200 per container. This fee has also risen considerably this year, due to increased security. Ports have also been complaining that the charges may increase in the future. Customs duty = 5% of unit cost. Customs broker fees per shipment = 300. Transportation from Seattle to Detroit = 18.60 per hundred pounds. Need to warehouse at least four weeks of inventory in Detroit at a warehousing cost of 1.00 per cubic foot per month, to compensate for lead time uncertainty. Sheila must also figure the costs associated with committing corporate capital for holding inventory. She has spoken to some accountants, who typically use a corporate cost of capital rate of 15%. Cost of hedging currencybroker fees = 400 per shipment Additional administrative time due to international shipping = 4 hours per shipment 25 per hour (estimated) At least two five-day visits per year to travel to China to meet with supplier and provide updates on performance and shipping = 20,000 per year (estimated) The international sourcing costs must be absorbed by Sheila, as the supplier does not assume any of the additional estimated costs and invoice Sheila later, or build the costs into a revised unit price. Sheila feels that the U.S. supplier is probably less expensive, even though it quoted a higher price. Sheila also knows that this is a standard technology that is unlikely to change during the next three years, but which could be a contract that extends multiple years out. There is also a lot of hall talk amongst the engineers on her floor about next-generation automotive electronics, which will completely eliminate the need for wire harnesses, which will be replaced by electronic components that are smaller, lighter, and more reliable. She is unsure about how to calculate the total costs for each option, and she is even more unsure about how to factor these other variables into the decision. Calculate the total cost per unit of purchasing from Original Wire.The Global Sourcing Wire Harness Decision Sheila Austin, a buyer at Autolink, a Detroit-based producer of subassemblies for the automotive market, has sent out requests for quotations for a wiring harness to four prospective suppliers. Only two of the four suppliers indicated an interest in quoting the business: Original Wire (Auburn Hills, MI) and Happy Lucky Assemblies (HLA) of Guangdong Province, China. The estimated demand for the harnesses is 5,000 units a month. Both suppliers will incur some costs to retool for this particular harness. The harnesses will be prepackaged in 24 12 6-inch cartons. Each packaged unit weighs approximately 10 pounds. Quote 1 The first quote received is from Original Wire. Auburn Hills is about 20 miles from Autolinks corporate headquarters, so the quote was delivered in person. When Sheila went down to the lobby, she was greeted by the sales agent and an engineering representative. After the quote was handed over, the sales agent noted that engineering would be happy to work closely with Autolink in developing the unit and would also be interested in future business that might involve finding ways to reduce costs. The sales agent also noted that they were hungry for business, as they were losing a lot of customers to companies from China. The quote included unit price, tooling, and packaging. The quoted unit price does not include shipping costs. Original Wire requires no special warehousing of inventory, and daily deliveries from its manufacturing site directly to Autolinks assembly operations are possible. Original Wire Quote: Unit price = 30 Packing costs = 0.75 per unit Tooling = 6,000 one-time fixed charge Freight cost = 5.20 per hundred pounds Quote 2 The second quote received is from Happy Lucky Assemblies of Guangdong Province, China. The supplier must pack the harnesses in a container and ship via inland transportation to the port of Shanghai in China, have the shipment transferred to a container ship, ship material to Seattle, and then have material transported inland to Detroit. The quoted unit price does not include international shipping costs, which the buyer will assume. HLA Quote: Unit price = 19.50 Shipping lead time = Eight weeks Tooling = 3,000 In addition to the suppliers quote, Sheila must consider additional costs and information before preparing a comparison of the Chinese suppliers quotation: Each monthly shipment requires three 40-foot containers. Packing costs for containerization = 2 per unit. Cost of inland transportation to port of export = 200 per container. Freight forwarders fee = 100 per shipment (letter of credit, documentation, etc.). Cost of ocean transport = 4,000 per container. This has risen significantly in recent years due to a shortage of ocean freight capacity. Marine insurance = 0.50 per 100 of shipment. U.S. port handling charges = 1,200 per container. This fee has also risen considerably this year, due to increased security. Ports have also been complaining that the charges may increase in the future. Customs duty = 5% of unit cost. Customs broker fees per shipment = 300. Transportation from Seattle to Detroit = 18.60 per hundred pounds. Need to warehouse at least four weeks of inventory in Detroit at a warehousing cost of 1.00 per cubic foot per month, to compensate for lead time uncertainty. Sheila must also figure the costs associated with committing corporate capital for holding inventory. She has spoken to some accountants, who typically use a corporate cost of capital rate of 15%. Cost of hedging currencybroker fees = 400 per shipment Additional administrative time due to international shipping = 4 hours per shipment 25 per hour (estimated) At least two five-day visits per year to travel to China to meet with supplier and provide updates on performance and shipping = 20,000 per year (estimated) The international sourcing costs must be absorbed by Sheila, as the supplier does not assume any of the additional estimated costs and invoice Sheila later, or build the costs into a revised unit price. Sheila feels that the U.S. supplier is probably less expensive, even though it quoted a higher price. Sheila also knows that this is a standard technology that is unlikely to change during the next three years, but which could be a contract that extends multiple years out. There is also a lot of hall talk amongst the engineers on her floor about next-generation automotive electronics, which will completely eliminate the need for wire harnesses, which will be replaced by electronic components that are smaller, lighter, and more reliable. She is unsure about how to calculate the total costs for each option, and she is even more unsure about how to factor these other variables into the decision. Based on the total cost per unit, which supplier should Sheila recommend?
- The Global Sourcing Wire Harness Decision Sheila Austin, a buyer at Autolink, a Detroit-based producer of subassemblies for the automotive market, has sent out requests for quotations for a wiring harness to four prospective suppliers. Only two of the four suppliers indicated an interest in quoting the business: Original Wire (Auburn Hills, MI) and Happy Lucky Assemblies (HLA) of Guangdong Province, China. The estimated demand for the harnesses is 5,000 units a month. Both suppliers will incur some costs to retool for this particular harness. The harnesses will be prepackaged in 24 12 6-inch cartons. Each packaged unit weighs approximately 10 pounds. Quote 1 The first quote received is from Original Wire. Auburn Hills is about 20 miles from Autolinks corporate headquarters, so the quote was delivered in person. When Sheila went down to the lobby, she was greeted by the sales agent and an engineering representative. After the quote was handed over, the sales agent noted that engineering would be happy to work closely with Autolink in developing the unit and would also be interested in future business that might involve finding ways to reduce costs. The sales agent also noted that they were hungry for business, as they were losing a lot of customers to companies from China. The quote included unit price, tooling, and packaging. The quoted unit price does not include shipping costs. Original Wire requires no special warehousing of inventory, and daily deliveries from its manufacturing site directly to Autolinks assembly operations are possible. Original Wire Quote: Unit price = 30 Packing costs = 0.75 per unit Tooling = 6,000 one-time fixed charge Freight cost = 5.20 per hundred pounds Quote 2 The second quote received is from Happy Lucky Assemblies of Guangdong Province, China. The supplier must pack the harnesses in a container and ship via inland transportation to the port of Shanghai in China, have the shipment transferred to a container ship, ship material to Seattle, and then have material transported inland to Detroit. The quoted unit price does not include international shipping costs, which the buyer will assume. HLA Quote: Unit price = 19.50 Shipping lead time = Eight weeks Tooling = 3,000 In addition to the suppliers quote, Sheila must consider additional costs and information before preparing a comparison of the Chinese suppliers quotation: Each monthly shipment requires three 40-foot containers. Packing costs for containerization = 2 per unit. Cost of inland transportation to port of export = 200 per container. Freight forwarders fee = 100 per shipment (letter of credit, documentation, etc.). Cost of ocean transport = 4,000 per container. This has risen significantly in recent years due to a shortage of ocean freight capacity. Marine insurance = 0.50 per 100 of shipment. U.S. port handling charges = 1,200 per container. This fee has also risen considerably this year, due to increased security. Ports have also been complaining that the charges may increase in the future. Customs duty = 5% of unit cost. Customs broker fees per shipment = 300. Transportation from Seattle to Detroit = 18.60 per hundred pounds. Need to warehouse at least four weeks of inventory in Detroit at a warehousing cost of 1.00 per cubic foot per month, to compensate for lead time uncertainty. Sheila must also figure the costs associated with committing corporate capital for holding inventory. She has spoken to some accountants, who typically use a corporate cost of capital rate of 15%. Cost of hedging currencybroker fees = 400 per shipment Additional administrative time due to international shipping = 4 hours per shipment 25 per hour (estimated) At least two five-day visits per year to travel to China to meet with supplier and provide updates on performance and shipping = 20,000 per year (estimated) The international sourcing costs must be absorbed by Sheila, as the supplier does not assume any of the additional estimated costs and invoice Sheila later, or build the costs into a revised unit price. Sheila feels that the U.S. supplier is probably less expensive, even though it quoted a higher price. Sheila also knows that this is a standard technology that is unlikely to change during the next three years, but which could be a contract that extends multiple years out. There is also a lot of hall talk amongst the engineers on her floor about next-generation automotive electronics, which will completely eliminate the need for wire harnesses, which will be replaced by electronic components that are smaller, lighter, and more reliable. She is unsure about how to calculate the total costs for each option, and she is even more unsure about how to factor these other variables into the decision. Calculate the total cost per unit of purchasing from Happy Lucky Assemblies.The Global Sourcing Wire Harness Decision Sheila Austin, a buyer at Autolink, a Detroit-based producer of subassemblies for the automotive market, has sent out requests for quotations for a wiring harness to four prospective suppliers. Only two of the four suppliers indicated an interest in quoting the business: Original Wire (Auburn Hills, MI) and Happy Lucky Assemblies (HLA) of Guangdong Province, China. The estimated demand for the harnesses is 5,000 units a month. Both suppliers will incur some costs to retool for this particular harness. The harnesses will be prepackaged in 24 12 6-inch cartons. Each packaged unit weighs approximately 10 pounds. Quote 1 The first quote received is from Original Wire. Auburn Hills is about 20 miles from Autolinks corporate headquarters, so the quote was delivered in person. When Sheila went down to the lobby, she was greeted by the sales agent and an engineering representative. After the quote was handed over, the sales agent noted that engineering would be happy to work closely with Autolink in developing the unit and would also be interested in future business that might involve finding ways to reduce costs. The sales agent also noted that they were hungry for business, as they were losing a lot of customers to companies from China. The quote included unit price, tooling, and packaging. The quoted unit price does not include shipping costs. Original Wire requires no special warehousing of inventory, and daily deliveries from its manufacturing site directly to Autolinks assembly operations are possible. Original Wire Quote: Unit price = 30 Packing costs = 0.75 per unit Tooling = 6,000 one-time fixed charge Freight cost = 5.20 per hundred pounds Quote 2 The second quote received is from Happy Lucky Assemblies of Guangdong Province, China. The supplier must pack the harnesses in a container and ship via inland transportation to the port of Shanghai in China, have the shipment transferred to a container ship, ship material to Seattle, and then have material transported inland to Detroit. The quoted unit price does not include international shipping costs, which the buyer will assume. HLA Quote: Unit price = 19.50 Shipping lead time = Eight weeks Tooling = 3,000 In addition to the suppliers quote, Sheila must consider additional costs and information before preparing a comparison of the Chinese suppliers quotation: Each monthly shipment requires three 40-foot containers. Packing costs for containerization = 2 per unit. Cost of inland transportation to port of export = 200 per container. Freight forwarders fee = 100 per shipment (letter of credit, documentation, etc.). Cost of ocean transport = 4,000 per container. This has risen significantly in recent years due to a shortage of ocean freight capacity. Marine insurance = 0.50 per 100 of shipment. U.S. port handling charges = 1,200 per container. This fee has also risen considerably this year, due to increased security. Ports have also been complaining that the charges may increase in the future. Customs duty = 5% of unit cost. Customs broker fees per shipment = 300. Transportation from Seattle to Detroit = 18.60 per hundred pounds. Need to warehouse at least four weeks of inventory in Detroit at a warehousing cost of 1.00 per cubic foot per month, to compensate for lead time uncertainty. Sheila must also figure the costs associated with committing corporate capital for holding inventory. She has spoken to some accountants, who typically use a corporate cost of capital rate of 15%. Cost of hedging currencybroker fees = 400 per shipment Additional administrative time due to international shipping = 4 hours per shipment 25 per hour (estimated) At least two five-day visits per year to travel to China to meet with supplier and provide updates on performance and shipping = 20,000 per year (estimated) The international sourcing costs must be absorbed by Sheila, as the supplier does not assume any of the additional estimated costs and invoice Sheila later, or build the costs into a revised unit price. Sheila feels that the U.S. supplier is probably less expensive, even though it quoted a higher price. Sheila also knows that this is a standard technology that is unlikely to change during the next three years, but which could be a contract that extends multiple years out. There is also a lot of hall talk amongst the engineers on her floor about next-generation automotive electronics, which will completely eliminate the need for wire harnesses, which will be replaced by electronic components that are smaller, lighter, and more reliable. She is unsure about how to calculate the total costs for each option, and she is even more unsure about how to factor these other variables into the decision. Are there any other issues besides cost that Sheila should evaluate?A&P Grocery Stores decided to sell its own brand of canned milk (referred to as private label milk). A&P asked its longtime supplier, Borden, to submit an offer to produce the private label milk. Bowman Dairy also submitted a bid, which was lower than Borden’s. A&P’s Chicago buyer then contacted Borden and said, “I have a bid in my pocket. You people are so far out of line it is not even funny. You are not even in the ballpark.” The Borden representative asked for more details but was told only that a $50,000 improvement in Borden’s bid “would not be a drop in the bucket.” A&P was one of Borden’s largest customers in the Chicago area. Furthermore, Borden had just invested more than $5 million in a new dairy facility in Illinois. The loss of the A&P account would result in underutilization of the plant. Borden lowered its bid by more than $400,000. The Federal Trade Commission charged Borden with price discrimination, but Borden maintained it was simply meeting the…
- One of the non-executive directors of SUPER NIGERIA LIMITED is Mr Dele. A main product of this company caused its success and reputation. In the process of manufacturing the product the company should obtain two major components A and B from suppliers. Both GOLD NIGERIA LIMITED and OKOKO NIGERIA LIMITED can provide component A. To enable the purchasing department to improve bargaining power, managers decided to agree a plan that the company uses both suppliers. Mr Dele takes lunch in the staff restaurant during the days he is present in the board meetings. Mrs Oriyomi is the purchasing manager of the company. One day he starts a conversation with her. She does not know about the non-executive director concept. During his explanation of the role of himself, Mrs Oriyomi takes advantage of the opportunity to ask about his opinion on a matter that has made her feel worried. One of her responsibilities is to place orders for stock. She usually places orders of component A on a weekly basis.…1. What risk can a business face due to a supplier and explain the foloowing risk control steps that a business can put in place regarding its supplier and provide examples: Identify key suppliers of goods, services Identify key markets Investigate alternative suppliers and markets Assess the vulnerability of the supplier and market to loss of assets Assess the ability of the key supplier and market to recover from loss or damage to their assets. 2. Discuss administrative costs. Provide a practical example to explain administrative costs: Clerical costs in the handling of insurance matters The cost of handling self-insured losses The cost of reporting and investigating loss occurrences The cost of an in-house risk management department The cost of a risk management broker 3. Apply the fundamental concepts included in the definition of enterprise risk management (ERM) to a business of your choosing.Known for its stylish ready-to-assemble home furnishings, IKEA has long relied on an extensive supplier net- work to manufacture its products and support its rapid global expansion. It has worked hard to develop a successful approach to encourage high ethical standards among its suppliers, including standards concerning the notoriously difficult issue of child labor. IKEA's initial plan to combat the use of child labor by its suppliers involved (1) contracts that threatened immediate cancellation and (2) random audits by a thirdparty partner. Despite these safeguards, the company discovered that some of its Indian suppliers were still employing children. IKEA realized that this issue would crop up again and again if it continued to use low-cost suppliers in developing countries—a critical element in its cost-containment strategy. 2020-2021 Page 7 of 8 Using child labor, for example, can signal bigger problems: production inefficiencies that require the lowest cost labor, lack of…