The pipeline 1 has a diameter of 600 mm and a length of 3 km. Its inlet is at the bottom of reservoir A which is located at elevation 270 m. Then the pipeline divides into two 450 mm diameter pipelines namely 2 and 3. Line 2 discharges 567 L/s through its 1.5 km length into reservoir B with the water surface in reservoir B at elevation 150 m. Line 3 which is 1.2 km long ends at reservoir C. The water surface in reservoir A is at elevation 303 m. All pipes are fairly smooth steel with f = 0.0115 for line 1 and f = 0.012 for lines 2 and 3. Determine the rates of flow of lines 1 and 3, and the elevation of reservoir C. Elev = 303 m Élev = 270 m Elev = 150 m Elev = ?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
The pipeline 1 has a diameter of 600 mm and a length of 3 km.
Its inlet is at the bottom of reservoir A which is located at
elevation 270 m. Then the pipeline divides into two 450 mm
diameter pipelines namely 2 and 3. Line 2 discharges 567 L/s
through its 1.5 km length into reservoir B with the water surface
in reservoir B at elevation 150 m. Line 3 which is 1.2 km long
ends at reservoir C. The water surface in reservoir A is at
elevation 303 m. All pipes are fairly smooth steel with
f = 0.0115 for line 1 and f = 0.012 for lines 2 and 3. Determine
the rates of flow of lines 1 and 3, and the elevation of reservoir
C.
Elev = 303 m
Élev = 270 m
Elev = 150 m
B
Elev = ?
Transcribed Image Text:The pipeline 1 has a diameter of 600 mm and a length of 3 km. Its inlet is at the bottom of reservoir A which is located at elevation 270 m. Then the pipeline divides into two 450 mm diameter pipelines namely 2 and 3. Line 2 discharges 567 L/s through its 1.5 km length into reservoir B with the water surface in reservoir B at elevation 150 m. Line 3 which is 1.2 km long ends at reservoir C. The water surface in reservoir A is at elevation 303 m. All pipes are fairly smooth steel with f = 0.0115 for line 1 and f = 0.012 for lines 2 and 3. Determine the rates of flow of lines 1 and 3, and the elevation of reservoir C. Elev = 303 m Élev = 270 m Elev = 150 m B Elev = ?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps with 4 images

Blurred answer
Knowledge Booster
Storm sewers and detention
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning