Why should management be concerned about improving setup time? What do you recommend to Hammond Inc. for improving setup time? How much time would be required for a setup, using your suggestion in (b)?
Q: The MRP gross requirements for Item X are shown here for the next 10 weeks. Lead time for A is two…
A: Given data is Setup cost = $9 Carrying cost = $0.02 per unit Lead time = 70 units
Q: West Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries…
A: Formulae used: X= (Σxi )n Range = x(maximum-minimum) R- =R1 +R2+R3..........RkK X= =X1 +…
Q: L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An…
A: Formulae used: To calculate the dollar value: Dollar value= Avgerage Inventory × value % of dollar…
Q: • You've had weeks of experience working on your group term papers. Share three key take-aways you…
A: Term papers are written in two ways namely: Individually In groups Group term paper is almost…
Q: Argue why "attractiveness of the company" and "reputation and image" are fundamental for sustainable…
A: A brand's reputation is how its customers, competitors, stakeholders, and the general public…
Q: Problem 16-11 (Algo) One of your Taiwanese suppliers has bid on a new line of molded plastic parts…
A: Net present value (NPV) is a method used to determine the current value of all future cash flows…
Q: Answer the question based on article given- Thanks Q1-Write a description of parts and process…
A: A part and process document is a step-by-step description of process execution from beginning to…
Q: Note: Note: you are required to provide a paraphrased understanding of the types of purchases…
A: Choosing the supplier that offers the best deal for the products that an organization must purchase…
Q: Which of the following statements is TRUE of a functional structure? It focuses on the company's…
A: Explanation : In the functional structure, it becomes easier for the employees to supervise one…
Q: Based on the given information related to costs for each of the options, the crossover point for…
A: Given, Annual availability of rooms = 50 rooms for 365 nights = 50*365 = 18250 rooms Inhouse:…
Q: Question 12 kan Match the following terms with their descriptions: I. X-axis II. Y-axis III.…
A: (I) X-axis The horizontal line of a chart where a series of data is plotted to show the categorical…
Q: a) What is the crossover point (point of indifference) for the two machines? The crossover point…
A: Given data is as follows: Machine A: Fixed Cost = 77000VC = $18Capacity = 14000 Machine B:Fixed Cost…
Q: a) Sequence the jobs according to LPT. According to the LPT rule, the sequence of jobs should be 10,…
A: Scheduling is the process of arranging production activities in order to complete the manufacturing…
Q: Which among the choices is where ISO 9001:2015 puts greater emphasis on? A. Leadership B.…
A: International Organization for Standardization or ISO is a board that has established certain…
Q: c) If Overnight Shipping's ratings for each of the factors increase by 10%, what are the new…
A: Given data: Criterion Weight Overnight Shipping Worldwide Delivery United Freight Quality 5 84…
Q: Read the summary below and answer the questions that follow: The Orange Girl – all the juice and…
A: Procurement generally is the purchase of goods, supplies, services, etc. Companies need to purchase…
Q: Problem 15-5 (Algo) A manufacturer has decided to locate a new factory in northwestern United States…
A: Given-
Q: Mention 5 Avantages of total quality management.
A: Total quality management, or TQM, was created by Edwards Deming. To increase the overall quality of…
Q: Discuss characteristics of successful e-tailing Discuss how internet job market has thrived in…
A: Disclaimer:- Since you have asked multiple questions, as per the authoring guidelines, we will…
Q: a) Based on the given information regarding the activities for the project, the project completion…
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: KU One is sold at retail store for $8 per unit. SKU One has a weekly demand of 975 units with an…
A: Price (P) = $ 8 Weekly demand (d) = 975 units Lead Time (L) = 5 weeks Standard Deviation of Lead…
Q: Vollmer Manufacturing makes three components for sale to refrigeration companies. The components are…
A: Also, the demand for 550 units of component 1 must be satisfied. Convert available hours in minutes…
Q: 2. Objective function: z = x₁ + 3x₂ Z Constraints: x₁ + x₂ ≤ 4 X1 x₁ - x₂ = 1 X1, X₂0
A: As in the question, only a simplex table is asked, so only that is provided the solution. No further…
Q: How does operation management affects the profitability of a business?
A: Operations Management - It is signified as the administration of business practices to efficiently…
Q: One of the main outputs of project cost management is cost estimate. Project managers normally…
A: Estimating the cost of a project: Estimation of cost in a project is finished at beginning of it,…
Q: Other secured loans $ Signature loans Risk-free securities $ $ What is the projected total annual…
A: Given data is Investment Return Automobile 7 Furniture 9 Other secured 10 Signature 11…
Q: Activity Research and Development Manufacturing Engineering Quality Engineering Plant Facilities…
A: Prevention costs are mainly used to control or bypass quality-related issues. Prevention costs are…
Q: -4. If you will like to produce the same output since it cost more than ₂ to acquire, how many
A: The slope of the isoquant curve represents the technical rate of substitution.
Q: How long do you estimate the time required to install the fourth pool? enter your response here…
A: Given data: The time to build the first pool is = 41 hours. Learning rate = 90%
Q: Which of the following is an advantage of choosing exporting as a mode of entry into foreign…
A: Ans) Exporting goods in an foreign markets means goods are manufactured in other country and It is…
Q: This can be a very serious issue because there is a tight timeline. What do you do next? Select an…
A: Production is the process in which inputs are combined to have the required output. It includes a…
Q: Kris Lee, the owner and manager of the Quality Hardware Store, is reassessing his inventory policy…
A: As per the guideline, the first three parts are answerable plz repost the remaining one. Given data:…
Q: The following particulars were collected for the year 2015 from Need LLC Monthly demand -2,000 units…
A: Stock level is refers to that amount of goods and material which always maintain by organization to…
Q: ize engagement of employees. B
A: Every team member's behavior is affected by and guided by the values, norms, and actions that make…
Q: 120 Lot Size: 0 Allocated: Safety Stock: 10 Lead Time: 3 Gross Requirements Scheduled Receipts…
A: Ans) When demand is changed to 10. There is enough on hand that all future demands can be satisfied,…
Q: Can you explain the answer a bit more. I'm having a hard time understanding which answer is the…
A: Given data: Demand Volume Decision Low Medium High Basic Model $90,000 $110,000 $155,000…
Q: a) What is its weeks of supply? weeks (round your response to two decimal places). b) What…
A: Given, Arrow Distributing Corp. Net Revenue $15,630 Cost of sales $12,190…
Q: a-1. What is the maximum rate (gallons per hour) at which the market can be served if all valves are…
A: Given data is as follows: The capacity of the tub is given as 60 gallons and the output when wide…
Q: Management for a 500 room lodging operation predicts the following statistics for August next year:…
A: Given- No. of rooms = 500Occupancy rate = 95%Average room rate = $89Operation days = 31
Q: If D = 8,500 per month, S = $46 per order, and H = $2.00 per unit per month, Part 2…
A: The goal of the EOQ formula is to establish the optimal number of product units to order. If…
Q: olio, programme and project with examples. Reference in APA style
A: Most corporate organizations or companies spend a substantial amount of time working on projects,…
Q: When IT project output meet the user’s information requirement, then what can be achieved? Competent…
A: Explanation : At the point when the interaction with the output of the it project is simple then…
Q: Gregory has started a small agricultural business that specialises in maize and sunflower seeds in…
A: Note that, as mentioned, the nature, size and impact of the business are not provided in the given…
Q: How does operation management affects the profitability of a business?
A: Operations management (OM) is the administration of business practices to make the highest level…
Q: Consider the following all-integer linear program. 1x₁ + 1x₂ Max s.t. 5X1 + 6x₂ 31 1x₁ + 5x₂ ≤ 20…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: The City Commission of Nashville has decided to build a botanical garden and picnic area in the…
A: Gantt chart Gantt chart is a visual representation of loading and scheduling process used in…
Q: Explain the 4 basic processes of Project Procurement Management
A: Procurement in project management refers to the procedure of purchasing, renting, or employing…
Q: Edwards Machine Tools needs to purchase a new machine. The basic model is slower but costs less,…
A: Find the Calculations below: The maximum and minimum values for each model are shown in the above…
Q: What does a decrease in inventory days tell us?
A: To understand inventory days, one needs to fundamentally understand inventory. An inventory in…
Q: Discuss different type of inventory control techniques used in operations Management with example
A: Businesses may decide which goods to order, when, and how much to order with the help of inventory…
- Hammond Inc. has analyzed the setup time on its computer-controlled lathe. The setup requires changing the type of fixture that holds a part. The average setup time has been 135 minutes, consisting of the following steps:
Step |
Time (in minutes) |
Turn off machine and remove fixture from lathe |
13 |
Go to tool room with fixture |
15 |
Record replacement of fixture to tool room |
18 |
Return to lathe |
20 |
Clean lathe |
17 |
Return to tool room |
20 |
Record withdrawal of new fixture from tool room |
12 |
Return to lathe |
15 |
Install new fixture and turn on machine |
8 |
Total setup time |
138 |
- Why should management be concerned about improving setup time?
- What do you recommend to Hammond Inc. for improving setup time?
- How much time would be required for a setup, using your suggestion in (b)?
Step by step
Solved in 2 steps
- A small, privately owned Asian company is producing a private-label soft drink called Yoggo. A bottling line puts the soft drinks into plastic bottles and then packages the bottles into boxes holding 10 bottles each. The bottling line is comprised of the following four steps: (1) the bottling machine takes 1 second to fill a bottle, (2) the lid machine takes 3 seconds to cover the bottle with a lid, (3) a labeling machine takes 3 seconds per bottle, and (4) the packaging machine takes 4 seconds to place a bottle into a box. When a box has been filled with 10 bottles, a worker tending the packaging machine removes the filled box and replaces it with an empty box. Assume that the time for the worker to remove a filled box and replace it with an empty box is negligible and hence does not affect the capacity of the line. Problem data are summarized in the following table. Process Step Number of Machines Seconds per Bottle Bottling 1 1 Apply a lid 1 3 Labeling 1 3 Packaging 1 4…A small, privately owned Asian company is producing a private-label soft drink called Yoggo. A bottling line puts the soft drinks into plastic bottles and then packages the bottles into boxes holding 10 bottles each. The bottling line is comprised of the following four steps: (1) the bottling machine takes 1 second to fill a bottle, (2) the lid machine takes 3 seconds to cover the bottle with a lid, (3) a labeling machine takes 3 seconds per bottle, and (4) the packaging machine takes 4 seconds to place a bottle into a box. When a box has been filled with 10 bottles, a worker tending the packaging machine removes the filled box and replaces it with an empty box. Assume that the time for the worker to remove a filled box and replace it with an empty box is negligible and hence does not affect the capacity of the line. Problem data are summarized in the following table. Assuming unlimited demand, what would be the flow rate? Assuming unlimited demand, what would be the utilization at…. A small, privately owned Asian company is producing a private-label soft drink calledYoggo. A bottling line puts the soft drinks into plastic bottles and then packagesthe bottles into boxes holding 10 bottles each. The bottling line is comprised of thefollowing four steps: (1) the bottling machine takes 1 second to fill a bottle, (2) the lidmachine takes 3 seconds to cover the bottle with a lid, (3) a labeling machine takes3 seconds per bottle, and (4) the packaging machine takes 4 seconds to place a bottleinto a box. When a box has been filled with 10 bottles, a worker tending the packagingmachine removes the filled box and replaces it with an empty box. Assume that thetime for the worker to remove a filled box and replace it with an empty box is negligibleand hence does not affect the capacity of the line. Problem data are summarized in thefollowing table. a. Draw a process flow diagram of this process. b. What is the capacity (bottles/hour) at the resource “Apply a lid”? c. What…
- Terex Corporation is a global manufacturer of aerial work platforms and materials processing machinery. They design, build and support products such as large lifting equipment used in construction. The company makes most pieces to order and customizes them to meet customers’ unique preferences.Terex maintained a manual system for yard management at their transfer centre in Washington that is always full of lifting equipment, which generated excessive costs for what should have been a relatively simple process of locating customers’ units to prepare them for delivery. A wallboard and sticker system was a low-tech solution for identifying equipment items in the yard at Terex. While inexpensive in itself, the solution cost around six minutes every time an employee had to locate a unit in the yard. It also required a considerable number of hours to be spent each month taking physical inventories. After a successful pilot, the company approved a new solution, replacing stickers, yard maps,…Terex Corporation is a global manufacturer of aerial work platforms and materials processing machinery. They design, build and support products such as large lifting equipment used in construction. The company makes most pieces to order and customizes them to meet customers’ unique preferences.Terex maintained a manual system for yard management at their transfer centre in Washington that is always full of lifting equipment, which generated excessive costs for what should have been a relatively simple process of locating customers’ units to prepare them for delivery. A wallboard and sticker system was a low-tech solution for identifying equipment items in the yard at Terex. While inexpensive in itself, the solution cost around six minutes every time an employee had to locate a unit in the yard. It also required a considerable number of hours to be spent each month taking physical inventories. After a successful pilot, the company approved a new solution, replacing stickers, yard maps,…erex Corporation is a global manufacturer of aerial work platforms and materials processing machinery. They design, build and support products such as large lifting equipment used in construction. The company makes most pieces to order and customizes them to meet customers’ unique preferences.Terex maintained a manual system for yard management at their transfer centre in Washington that is always full of lifting equipment, which generated excessive costs for what should have been a relatively simple process of locating customers’ units to prepare them for delivery. A wallboard and sticker system was a low-tech solution for identifying equipment items in the yard at Terex. While inexpensive in itself, the solution cost around six minutes every time an employee had to locate a unit in the yard. It also required a considerable number of hours to be spent each month taking physical inventories. After a successful pilot, the company approved a new solution, replacing stickers, yard maps,…
- . Aquatica makes underwater camera housings for divers. The process begins with a solid rectangular block of aluminum that is used to make a single housing. A computer numerically controlled (CNC) machine drills into the block to make the metal “frame” of the housing. Each block requires 15 minutes of drilling. The frame is then chemically treated in a series of baths. There is ample capacity in the treating stage. Finally, a worker must manually attach the various buttons and components to the metal housing. This assembly takes 120 minutes per housing per worker and Aquatica has 6 workers trained to do this task. The CNC machine requires a 30-minute setup time before the production of a batch can begin. a. If the CNC machine produces 14 housings between setups, what would be its capacity (in housings per hour)? b. Assuming the process is supply-constrained, what is the utilization (as a number between 0 and 1) of the CNC machine if it operates in batches of 14 housings? c. Assuming…An average of 1200 parts arrive to the EP chamber during an 8-hour workday. Each part goes through two stages of processing. At each stage, a single product is processed at a time, and processing takes an average of 15 seconds at the first station and 12 seconds at the second station. Inter-arrival times and service times are exponentially distributed. At the end of the second step, the product goes through a quality check. 5% of the parts fail the quality check and are sent back to the second stage of service. Parts exit the system only after they pass the quality check. Ignoring the time required to perform the quality check or in moving the part through the facility, what is the average cycle time for parts?Teddy Fields is the Kitchen Manager at the Tanron Corporation International Headquarters. The facility he helps manage serves 3000 employees per day. Teddy very much needs an additional dishwasher, and is interviewing Wayne, an excellent candidate with 5 years experience who is now washing dishes at the Roadway restaurant. Teddy normally starts his dishwashers at $12.00 per hour. Wayne states that he makes $13.00 per hour, a rate that is higher than all but one of Teddy’s current dishwashers. Wayne states that he would not leave his current job to take a “pay-cut”. Should Teddy offer to hire Wayne at a rate higher than most of his current employees? Why or why not?
- One of the chair lifts at a ski resort unloads 1800 skiers per hour at the top of the slope.The ride from the bottom to the top takes 12 minutes. How many skiers are riding onthe lift at any given time?A 10 station automated assembly system produces an ideal cycle time (Tc) of 14 seconds/cycle. When a defective part enters any assembly station it sometimes causes a station jam or stoppage. Defective parts occur at a rate of 0.07 and a jams due to defective parts occur at a rate of 0.4. When a jam occurs, it takes on average 74 seconds to clear and restart the station. Determine the production rate of acceptable parts (Rap) to the nearest 1 part/hour.12-15 The wheat harvesting season in the American Midwest is short, and most farmers deliver their truckloads of wheat to a giant central storage bin within a two-week span. Because of this, wheat-filled trucks waiting to unload and return to the fields have been known to back up for a block at the receiving bin. The central bin is owned cooperatively, and it is to every farmer’s benefit to make the unloading/storage process as efficient as possible. The cost of grain deterioration caused by unloading delays, the cost of truck rental, and idle driver time are significant concerns to the cooperative members. Although farmers have difficulty quantifying crop damage, it is easy to assign a waiting and unloading cost for truck and driver of $18 per hour. The storage bin is open and operated 16 hours per day, 7 days per week, during the harvest season and is capable of unloading 35 trucks per hour according to an exponential distribution. Full trucks arrive all day long (during the hours…