Case Study: Cascade Road

Decent Essays

Transportation
Cascade at I-96 Michigan's second diverging diamond intersection is located at the I-96 interchange with Cascade Road from approximately Cascade West Parkway to 400-feet east of Kenmoor Avenue in Grand Rapids Township, Michigan. The project length on Cascade Road is approximately 2700 feet. As a sub consultant to TranSystems Corporation, C2AE was responsible for the design of Cascade Road's horizontal and vertical alignment, intersection improvements at Cascade West Parkway, Ramp Terminals, and East Paris Avenue, maintenance of traffic and staging for Cascade Road and I-96, utility coordination, drainage systems, guardrail and roadway safety, sidewalk and ADA ramps.
Cascade Road is one of the busiest interchanges in Grand Rapids. C2AE helped to …show more content…

M-60 through Menden
C2AE was hired to complete 1.1 miles of total reconstruction and rehabilitation on M-60 in Mendon, Michigan. This project included the water main replacement and upsizing; design, sizing, and layout of storm sewer reconstruction; and the coordination of an MDEQ permit for storm sewer drainage to Little Portage Creek, which flows into the Kalamazoo River. We also designed detention and settling basins to enhance the water quality of the storm sewer outlets.
This reconstruction required total coordination with MDOT Environment Specialist and the State Historic Preservation Office as this is a high impact historical area. MDOT also required that we prepare and collect permits for the right of way plans to highlight temporary and permanent right of way designs.
Our team met with the community to create maintenance, traffic, and pavement marking plans. We also coordinated with the city to create a new water main design and downtown enhancements.
M-52 in