preview

Installation, Training And Maintenance Of Hemolyzer 5 Essay

Better Essays

CAREER EPISODE 3

Introduction
Title: installation, training and maintenance of Hemolyzer 5
Date: December, 2014 to December, 2016
Duration: 2 years
Location: Sunrise Surgical House, Kathmandu and Nepal Police Hospital, Kathmandu
Role: Service Manager
Brief introduction:
This assignment of installation and maintenance of Hemolyzer 5 for the contract period of two year was carried out during my work at Sunrise Surgical House, Kathmandu. This is one of the job assignments I have successfully performed during my work in this company since May, 2013.I was required to install, validate the results with Quality control samples, train the users and finally maintain and repair the machine periodically and whenever required.
Reducing the errors with minimum maintenance is desirable to increase the efficiency of machine for highly accurate and consistent result of hematology parameter of human blood. This is important task for me to implement the skill, knowledge and experience gained in the training provided by the manufacturer Analyticon Biotechnologies AG, Germany.
Background
Nepal Police Hospital selected our company to carry out this project through the public bidding procedure. After the invitation for sealed quotation including the specifications and prices, I personally prepared all necessary paper with utmost care. I filled out the tender form using our prefeasibility study. Finally the decision came in our favor.
Objective of Project
The core objective of this contract is

Get Access