1i. Suppose that a structure can withstand a flood with a peak discharge no greater than 1,950 m3/s and it has been designed to have an economic life span of 100 years. Determine the risk of failure assuming the Extreme Value Distribution when the mean and standard deviation of the annual flood series are 410m3/s and 280 m3/s, respectively. 1ii. What is the probability that at least one flood of ARI 50y (T=50y) will occur during the 30 year design life of a flood control project? 1iii. Consider a small, temporary (3 year design life) flood mitigation dam designed to contain a 20 year flood event. What is the risk that it will be overtopped at least once in the design life.
Continuous Probability Distributions
Probability distributions are of two types, which are continuous probability distributions and discrete probability distributions. A continuous probability distribution contains an infinite number of values. For example, if time is infinite: you could count from 0 to a trillion seconds, billion seconds, so on indefinitely. A discrete probability distribution consists of only a countable set of possible values.
Normal Distribution
Suppose we had to design a bathroom weighing scale, how would we decide what should be the range of the weighing machine? Would we take the highest recorded human weight in history and use that as the upper limit for our weighing scale? This may not be a great idea as the sensitivity of the scale would get reduced if the range is too large. At the same time, if we keep the upper limit too low, it may not be usable for a large percentage of the population!
1i. Suppose that a structure can withstand a flood with a peak discharge no greater than 1,950 m3/s and it has been designed to have an economic life span of 100 years. Determine the risk of failure assuming the Extreme Value Distribution when the mean and standard deviation of the annual flood series are 410m3/s and 280 m3/s, respectively.
1ii. What is the probability that at least one flood of ARI 50y (T=50y) will occur during the 30 year design life of a flood control project?
1iii. Consider a small, temporary (3 year design life) flood mitigation dam designed to contain a 20 year flood event. What is the risk that it will be overtopped at least once in the design life.
Step by step
Solved in 3 steps