4. An intersection has a 3-timing stage signal with the movements allowed in each timing stage and corresponding analysis and saturation flow rates shown below. Consider that the total lost time is 12 seconds and a critical v/c ratio of 0.85 was desired. The cycle length is 60 seconds. Calculate the delay and level of service for (a) the westbound left lane group, (b) the westbound approach and (c) the whole intersection. Timing Stage Allowed movements Analysis flow rate (veh/h) Saturation flow rate(veh/h) Effective green (sec) 1 2 NBL SBL NB T/R 330 365 1125 1700 1750 13.9 SB T/R EB L 1075 110 3400 3300 650 22.1 WB L 80 600 3 EB T/R WB T/R 250 285 1750 1800 11.3

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter8: Intersection Control
Section: Chapter Questions
Problem 14P
icon
Related questions
Question

Please calculate the level of service and delay for the westbound left lane group, the westbound approach, and the whole intersection. I provided LOS chart for reference. 

4. An intersection has a 3-timing stage signal with the movements allowed in each timing
stage and corresponding analysis and saturation flow rates shown below. Consider that
the total lost time is 12 seconds and a critical v/c ratio of 0.85 was desired. The cycle
length is 60 seconds. Calculate the delay and level of service for (a) the westbound left
lane group, (b) the westbound approach and (c) the whole intersection.
Timing Stage
Allowed movements
Analysis flow rate (veh/h)
Saturation flow rate(veh/h)
Effective green (sec)
1
NBL SB L
330 365
1700 1750
13.9
2
NB T/R SB T/R EB L
1075
3300
1125
3400
22.1
WB L
110 80
650 600
3
EB T/R WB T/R
250
285
1750
1800
11.3
Transcribed Image Text:4. An intersection has a 3-timing stage signal with the movements allowed in each timing stage and corresponding analysis and saturation flow rates shown below. Consider that the total lost time is 12 seconds and a critical v/c ratio of 0.85 was desired. The cycle length is 60 seconds. Calculate the delay and level of service for (a) the westbound left lane group, (b) the westbound approach and (c) the whole intersection. Timing Stage Allowed movements Analysis flow rate (veh/h) Saturation flow rate(veh/h) Effective green (sec) 1 NBL SB L 330 365 1700 1750 13.9 2 NB T/R SB T/R EB L 1075 3300 1125 3400 22.1 WB L 110 80 650 600 3 EB T/R WB T/R 250 285 1750 1800 11.3
LOS
A
B
с
D
E
F
Control Delay per Vehicle (s/veh)
≤ 10
> 10-20
> 20-35
> 35-55
> 55-80
> 80
Transcribed Image Text:LOS A B с D E F Control Delay per Vehicle (s/veh) ≤ 10 > 10-20 > 20-35 > 35-55 > 55-80 > 80
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 7 steps with 5 images

Blurred answer
Knowledge Booster
Intersection control
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning